Chicago Public Library

   

 Español | Polski | 


 
Search results for Skyscrapers   
Refine your search
Subject.TGM
Skyscrapers (1839)
Trees (886)
Hoisting Machinery (850)
Construction Workers (535)
Scaffolding (532)
Show more...

Photographer
Unknown (1836)

Neighborhood
Loop (Chicago, Ill.) (1836)
Columbus Drive (Chicag... (428)
Randolph Street (Chica... (286)
Michigan Avenue (Chica... (56)
Monroe Street (Chicago... (34)
Show more...

results 281-300 of 1836 item(s)  page 15 of 92 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

281. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Snow; Skyscrapers; Concrete; Trees; Shovels; Freshly-poured concrete on-site during construction of Crown Fountain's reservoir. Buildings along East Randolph Street are visible in the background.

282. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Skyscrapers; Concrete; Freshly-poured concrete on-site during construction of Crown Fountain's reservoir. The Michigan Avenue street wall is visible in the background.

283. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Snow; Tents; Skyscrapers; Concrete; Trees; Freshly-poured concrete on-site during construction of Crown Fountain's reservoir.

284. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Structural systems; Tents; Skyscrapers; Concrete; Trees; Freshly-poured concrete on-site during construction of Crown Fountain's reservoir.

285. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Structural systems; Snow; Tents; Skyscrapers; Construction equipment; Construction workers; Concrete; Automobiles; Looking south at the structural steel of the south tower and the weatherproof tent that was erected so that work could continue in cold weather. The Michigan Avenue street wall is visible in the background....

286. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

287. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

288. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

289. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

290. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Skyscrapers; Concrete; Trees; Reflections; Structural systems; Looking north along the east perimeter of the water feature during a test of the reservoir.

291. Crown Fountain, east perimeter of site, test of reservoir, March 4, 2004 Crown Fountain, east perimeter of site, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; Structural systems; Looking south along the east perimeter of the construction site during a test of the reservoir. The towers have been fitted with all but the last LED panels which will go behind the "gargoyle" nozzles....

292. Crown Fountain, north tower, test of reservoir, March 4, 2004 Crown Fountain, north tower, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; Looking north toward the north tower during a test of the reservoir. The Chicago Cultural Center, formerly the Chicago Public Library, is visible in the background. Other visible buildings include the...

293. Crown Fountain, south tower, test of reservoir, March 4, 2004 Crown Fountain, south tower, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction workers; Skyscrapers; Concrete; Reflections; Structural systems; Looking southwest toward the south tower during a test of the reservoir. The tower has been fitted with all but the last LED panel which will go behind the "gargoyle" nozzle. Buildings along South Michigan...

294. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Structural systems; Surveying equipment; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

295. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. The Michigan Avenue street wall is visible in the background.

296. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Skyscrapers; Concrete; Trees; Trailers; Piping and pedestals in the fountain's reservoir. In the finished fountain, the 20-inch deep reservoir supplies water for the reflecting pool and the fountain.

297. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; A worker begins to build the surface of the reflecting pool. The surface is made of tiles of black, African granite that are 3 feet square and weigh around 250 pounds each. They sit almost 2 feet above...

298. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir. Getting the black granite tiles...

299. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches off the ground, creating a space for a reservoir of water just...

300. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Trucks; Skyscrapers; Concrete; Trees; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir, and the water for the reflecting...
select all : clear all : add to favorites
results 281-300 of 1836 item(s)  page 15 of 92 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next