Chicago Public Library

   

 Español | Polski | 


 
Search results for Highlight   
Refine your search
Photographer
Unknown (154)

Neighborhood
Loop (Chicago, Ill.) (154)
Columbus Drive (Chicag... (12)
Michigan Avenue (Chica... (5)
Lake Shore Drive (Chic... (2)
Monroe Street (Chicago... (2)
Show more...

Subject.TGM
Construction Workers (59)
Skyscrapers (58)
Hoisting Machinery (42)
Scaffolding (33)
Steel (32)
Show more...

results 101-120 of 154 item(s)  page 6 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

101. Cloud Gate, assembly complete, July 12, 2004 Cloud Gate, assembly complete, July 12, 2004 Public sculpture; Restaurants; Trees; Tents; Lampposts; Reflections; Looking southeast toward the Park Grill and Cloud Gate. The 110-ton sculpture sits atop a load-bearing wall which separates the Park Grill café from an underground parking garage. The lightning protection...

102. Cloud Gate, assembly complete, July 12, 2004 Cloud Gate, assembly complete, July 12, 2004 Public sculpture; Skyscrapers; Reflections; Construction equipment; Plazas; Looking southwest toward Cloud Gate and SBC Plaza four days before the park was opened to the public. Crown Fountain and the Michigan Avenue street wall are visible in the background. The surface of Cloud...

103. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Construction workers; Skyscrapers; Structural systems; Looking southwest toward SBC Plaza during its construction. Rebar, or reinforcing bar, latticework is in place at SBC Plaza, in preparation for pouring the concrete. SBC Plaza is located atop the roof...

104. Millennium Monument at Wrigley Square, October 15, 2002 Millennium Monument at Wrigley Square, October 15, 2002 Columns; Entablatures; Peristyles; Towers; Looking up at the columns and entablature of the peristyle from the ramp side. The top of Willoughby Tower on Michigan Avenue is visible in the background.

105. Jay Pritzker Pavilion, structural steel for the headdress, August 10, 2003 Jay Pritzker Pavilion, structural steel for the headdress, August 10, 2003 Skyscrapers; Streets; Trees; Looking west through the headdress’s structural steel along Washington Street during construction. In addition to being the Pavilion’s signature decorative element, the headdress, or proscenium was...

106. Cloud Gate, assembly complete, July 12, 2004 Cloud Gate, assembly complete, July 12, 2004 Public sculpture; Reflections; Skyscrapers; Plazas; Looking west toward Cloud Gate. This photograph was taken less than a week before Millennium Park opened. The ongoing construction of SBC Plaza is visible in the sculpture's reflection. The sculpture was...

107. Millennium Monument at Wrigley Square, peristyle in winter, ca. 2003 Millennium Monument at Wrigley Square, peristyle in winter, ca. 2003 Peristyles; Walls; Snow; Millennium Monument at Wrigley Square in winter.

108. Crown Fountain, LED test in Millennium Park, October 3, 2002 Crown Fountain, LED test in Millennium Park, October 3, 2002 Mock-ups; Glass blocks; Scaffolding; Construction equipment; Skyscrapers; Flags; Fog; Eyes; Lighting; On a gloomy, overcast day in Chicago a second LED test was conducted on site. Glass brick panels and LED panels were temporarily erected in Millennium Park at the approximate height of the towers to check...

109. Crown Fountain, south tower, opening day, July 16, 2004 Crown Fountain, south tower, opening day, July 16, 2004 Fountains; Reflecting pools; Faces; Lighting; Crowds; Children; Trees; Skyscrapers; On Millennium Park’s official opening day, July 16, 2004, crowds gather to play in Crown Fountain’s reflecting pool and to experience the fountain. Within a few hours of the park opening, artist Jaume...

110. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...

111. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Girders; Scaffolding; Skyscrapers; Once the box girders were lowered into place they were secured together with bolts and then welded together for strength.

112. Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Industrial facilities; Structural frames; Glass blocks; Fans (Machinery); Pails; Shelving; Once the glass bricks were made by L.E. Smith in Mt. Pleasant, Pennsylvania, they were sent to the offices of Circle Redmont, Inc., to be assembled into steel grids, shown here.

In Plensa’s...

113. BP Bridge, subframing and paneling, November 12, 2003 BP Bridge, subframing and paneling, November 12, 2003 Structural frames; Ladders; Trees; Surveying equipment; Paneling has been added to subframing on a curve of the BP Bridge during construction. The stainless steel shingles, or “scales,” were installed directly on top of the paneling.

114. Crown Fountain, south tower at night, July 23, 2004 Crown Fountain, south tower at night, July 23, 2004 Fountains; Reflecting pools; Faces; Lighting; Reflections; Perhaps even more dramatic at nighttime, the Crown Fountain never fails to attract the public to walk on water.

115. Crown Fountain, meeting in Chicago, ca. May 13, 2002 Crown Fountain, meeting in Chicago, ca. May 13, 2002 Alleys; Architects' offices; Project members meet in an alley in downtown Chicago to look at the LED screens behind various glass brick samples. Left to right, Mark Sexton of Krueck + Sexton, architects; Alan Schachtman of US Equities...

116. Cloud Gate, attaching steel plates, April 29, 2004 Cloud Gate, attaching steel plates, April 29, 2004 Steel; Construction workers; Structural systems; Bolts & nuts; Project supervisor Nick Taylor of Performance Structures, Inc. fastens two plates together using nuts and bolts. The bolts temporarily held the plates in place, until they could be seam-welded together....

117. Jay Pritzker Pavilion, installing steel panels, July 1, 2003 Jay Pritzker Pavilion, installing steel panels, July 1, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Construction workers; Steel and aluminum panels are added to the underside of the headdress. The headdress, or proscenium, reaches a height of 120 feet above the stage and is an important part of the overall acoustical plan...

118. Jay Pritzker Pavilion, wrapping steel I-beams in rebar, October 15, 2002 Jay Pritzker Pavilion, wrapping steel I-beams in rebar, October 15, 2002 I-beams; Construction workers; Skyscrapers; Concrete; Steel I-beams were wrapped in rebar, or reinforcing bar, prior to their being cast in concrete. The Michigan Avenue street wall is visible in the background.

119. Cloud Gate, attaching steel plates, May 27, 2004 Cloud Gate, attaching steel plates, May 27, 2004 Steel; Plywood; Welding; Ladders; Ropes; Marks (Symbols); Concrete; Steel plates on the sculpture are welded together. A tack-welding process was used prior to the Park's opening; permanent seam-welding was completed in 2005.

120. Millennium Monument at Wrigley Square, looking south, July 22, 2002 Millennium Monument at Wrigley Square, looking south, July 22, 2002 Construction; Construction equipment; Hoisting machinery; Construction workers; Taken from above, this view to the south shows the limestone slabs before they are attached to the peristyle, and the base of the crane used to lift them.
select all : clear all : add to favorites
results 101-120 of 154 item(s)  page 6 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next