Chicago Public Library

   

 Español | Polski | 


 
Search results for Highlight   
Refine your search
Photographer
Unknown (154)

Neighborhood
Loop (Chicago, Ill.) (154)
Columbus Drive (Chicag... (12)
Michigan Avenue (Chica... (5)
Lake Shore Drive (Chic... (2)
Monroe Street (Chicago... (2)
Show more...

Subject.TGM
Construction Workers (59)
Skyscrapers (58)
Hoisting Machinery (42)
Scaffolding (33)
Steel (32)
Show more...

results 101-120 of 154 item(s)  page 6 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

101. Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Cross-section of the inside of one of Crown Fountain’s towers showing the LED units and the glass brick walls. The space between the LEDs and the glass brick wall allows for ventilation and permits the...

102. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; A model showing how the “gargoyle” nozzle would look when installed in the glass brick façade of each tower with the LED panels behind it.

103. Crown Fountain, video filming, May 20, 2004 Crown Fountain, video filming, May 20, 2004 Motion picture studios; Video recording; Clocks & watches; A member of the public is filmed for the Crown Fountain’s video bank. The faces that appear on Crown Fountain were filmed by the School of the Art Institute of Chicago. Over 1,000 people, from over 75...

104. Crown Fountain, video still with notes, July 30, 2003 Crown Fountain, video still with notes, July 30, 2003 Film stills; Pens; Marks (Symbols); A printed out image of a face that will be included in Crown Fountain’s video bank, showing some of the considerations the film makers had to take into account.

The dimensions of Crown Fountain,...

105. Crown Fountain, water feature tests, August 25, 2002 Crown Fountain, water feature tests, August 25, 2002 Fountains; Testing;Industrial facilities; The “gargoyle” nozzle of the Crown Fountain being tested at the Crystal Fountain headquarters in Concord, Ontario. The “gargoyle” feature of the Crown Fountain, the part where the face on the screen...

106. Crown Fountain, water feature tests, ca. August 27, 2003 Crown Fountain, water feature tests, ca. August 27, 2003 Testing; Industrial facilities; A close up of the specially designed “gargoyle” nozzle used on each of Crown Fountain’s towers. The nozzle is made from cast UV stabilized acrylic, a material chosen for its appearance and its ability...

107. Crown Fountain, water feature tests, ca. November 5, 2002 Crown Fountain, water feature tests, ca. November 5, 2002 Fountains; Testing; Ladders; Industrial facilities; Water tanks; Hoses; Lighting; Testing the cascade feature of Crown Fountain at Crystal Fountain’s headquarters in Concord, Ontario. Great care was taken to regulate the amount of water that cascades down all four sides of the towers...

108. Crown Fountain, water feature tests, ca. November 5, 2002 Crown Fountain, water feature tests, ca. November 5, 2002 Mock-ups; Fountains; Ladders; Industrial facilities; Reflecting pools; A mock-up tower was constructed at Crystal Fountain’s headquarters in Concord, Ontario, to test the water features. Here the “gargoyle” feature is being tested for water flow and trajectory.

109. Jay Pritzker Pavilion, aerial view, installing steel panels, February 14, 2004 Jay Pritzker Pavilion, aerial view, installing steel panels, February 14, 2004 Hoisting machinery; Cantilever construction; Construction equipment; Streets; Snow; An aerial view of the Jay Pritzker Pavilion under construction. Five months before Millennium Park opened to the public, work continues on the Pavilion. Steel and aluminum panels are still being installed...

110. Jay Pritzker Pavilion, constructing the glass doors, ca. October 30, 2003 Jay Pritzker Pavilion, constructing the glass doors, ca. October 30, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Stages (Platforms); The stage area of the Jay Pritzker Pavilion showing construction of the steel structure for the glass stage doors. Two massive glass and steel doors were built for the stage area of the Jay Pritzker Pavilion...

111. Jay Pritzker Pavilion, constructing the trellis and headdress, ca. October 17, 2003 Jay Pritzker Pavilion, constructing the trellis and headdress, ca. October 17, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Looking north toward the Jay Pritzker Pavilion as work continues on the headdress, the stage and the trellis. The trellis, which delivers the sound system to the audience on the Great Lawn, is comprised...

112. Jay Pritzker Pavilion, constructing the trellis, June 19, 2003 Jay Pritzker Pavilion, constructing the trellis, June 19, 2003 Scaffolding; Skyscrapers; Construction workers; A close-up view of part of the trellis before it was installed over the Great Lawn. Inkeeping with Frank Gehry’s distinctive style, the trellis that spans the Great Lawn is not only attractive and adds...

113. Jay Pritzker Pavilion, construction of Great Lawn, March 22, 2004 Jay Pritzker Pavilion, construction of Great Lawn, March 22, 2004 Sand; Skyscrapers; Construction of the Great Lawn continues as layers of gravel and sand are spread out before being topped with sod. The layers help the Lawn to drain quickly after a heavy rain, for both concert-goers and...

114. Jay Pritzker Pavilion, construction of Great Lawn, November 14, 2003 Jay Pritzker Pavilion, construction of Great Lawn, November 14, 2003 Hoisting machinery; Trailers; Skyscrapers; Construction workers; Looking south, from the headdress of the Jay Pritzker Pavilion, as work continues on the Lawn. Here, piles of sand and gravel are ready to be spread over the surface of the lawn. The Great Lawn was designed...

115. Jay Pritzker Pavilion, construction of Great Lawn, October 17, 2003 Jay Pritzker Pavilion, construction of Great Lawn, October 17, 2003 Construction workers; Hoisting machinery; Scaffolding; Skyscrapers; Construction equipment With the trellis in place, workers begin constructing the Great Lawn. Built atop two stories of parking garages and railroad tracks, Millennium Park, at 24 ½ acres, is one of the largest green roofs in...

116. Jay Pritzker Pavilion, Great Lawn, April 23, 2004 Jay Pritzker Pavilion, Great Lawn, April 23, 2004 Skyscrapers; Hoisting machinery; The Jay Pritzker Pavilion, trellis and Great Lawn. Slightly less than three months before Millennium Park opened to the public sod had been laid for the Great Lawn and automatic sprinklers kept it watered....

117. Jay Pritzker Pavilion, headdress with blue lighting, March 22, 2004 Jay Pritzker Pavilion, headdress with blue lighting, March 22, 2004 Testing; Lighting; Skyscrapers; Looking north toward the Pavilion at night as it was illuminated in blue during a lighting test. The ribbons and the headdress of the Jay Pritzker Pavilion are even more dramatic at night when they are...

118. Jay Pritzker Pavilion, headdress, March 23, 2004 Jay Pritzker Pavilion, headdress, March 23, 2004 Cantilever construction; Construction equipment; Streets; Automobiles; An aerial view of the Jay Pritzker Pavilion’s headdress under construction. The finished stainless steel plates have been installed onto the ribbons of the headdress, or proscenium, and work continues...

119. Jay Pritzker Pavilion, headdress, March 4, 2004 Jay Pritzker Pavilion, headdress, March 4, 2004 A view of the underside of the ribbons on the headdress. A worker’s yellow hard hat is visible between the folds of steel.

120. Jay Pritzker Pavilion, installation of structural steel for the headdress, May 13, 2003 Jay Pritzker Pavilion, installation of structural steel for the headdress, May 13, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Flowers; Traffic signs & signals; Streets; Skyscrapers; Lampposts; Looking east, the partially-built headdress is in profile as a crane lifts structural steel into place. The distance the headdress, or proscenium, extends from the stage provides a cover for most of the...
select all : clear all : add to favorites
results 101-120 of 154 item(s)  page 6 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next