Chicago Public Library

   

 Español | Polski | 


 
Search results for Automobiles   
Refine your search
Subject.TGM
Automobiles (407)
Trees (221)
Streets (218)
Skyscrapers (178)
Hoisting Machinery (124)
Show more...

Photographer
Unknown (406)

Neighborhood
Loop (Chicago, Ill.) (405)
Monroe Street (Chicago... (118)
Columbus Drive (Chicag... (108)
Michigan Avenue (Chica... (91)
Lake Shore Drive (Chic... (25)
Show more...

results 41-60 of 406 item(s)  page 3 of 21 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

41. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Structural systems; Office buildings; Lampposts; Automobiles; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

42. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Structural systems; Office buildings; Lighting; Faces; Lampposts; Automobiles; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

43. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Structural systems; Office buildings; Lighting; Faces; Lampposts; Automobiles; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

44. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Construction workers; Automobiles; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. The Art Institute of Chicago is visible in the background.

45. Crown Fountain, excavation and construction of reservoir, September 19, 2003 Crown Fountain, excavation and construction of reservoir, September 19, 2003 Excavation; Skyscrapers; Construction workers; Retaining walls; Concrete mixers; Automobiles;Trees; Construction of the concrete retaining walls surrounding the reservoir.

46. Crown Fountain, excavation and construction of reservoir, September 19, 2003 Crown Fountain, excavation and construction of reservoir, September 19, 2003 Excavation; Construction workers; Retaining walls; Automobiles; Construction of the concrete retaining walls surrounding the reservoir.

47. Crown Fountain, excavation and construction of reservoir, September 24, 2003 Crown Fountain, excavation and construction of reservoir, September 24, 2003 Excavation; Construction workers; Retaining walls; Concrete; Construction equipment; Trees; Automobiles; Looking south along the partially completed concrete retaining wall. The Art Institute of Chicago is visible in the background.

48. Crown Fountain, excavation and construction of reservoir, September 24, 2003 Crown Fountain, excavation and construction of reservoir, September 24, 2003 Excavation; Construction workers; Retaining walls; Concrete; Construction equipment; Pickup trucks; Automobiles; Trees; Close-up view of the partially completed concrete retaining wall.

49. Crown Fountain, excavation and construction of reservoir, September 24, 2003 Crown Fountain, excavation and construction of reservoir, September 24, 2003 Excavation; Retaining walls; Concrete; Automobiles; Trees; Looking east toward the partially completed retaining wall.

50. Crown Fountain, excavation and construction of reservoir, September 30, 2003 Crown Fountain, excavation and construction of reservoir, September 30, 2003 Excavation; Retaining walls; Construction workers; Concrete; Pipes (Conduits); Construction equipment; Automobiles; Trees; View facing south of the eastern edge of the Crown Fountain's reservoir during construction. The Art Institute of Chicago is visible in the background.

51. Crown Fountain, excavation and construction of reservoir, September 30, 2003 Crown Fountain, excavation and construction of reservoir, September 30, 2003 Excavation; Retaining walls; Construction workers; Concrete; Automobiles; Trees; Construction equipment; View facing south of the eastern edge of the Crown Fountain's reservoir during construction. The Art Institute of Chicago is visible in the background.

52. Crown Fountain, excavation and construction of reservoir, September 30, 2003 Crown Fountain, excavation and construction of reservoir, September 30, 2003 Excavation; Retaining walls; Concrete; Automobiles; View facing south of the western edge of the reservoir of Crown Fountain during the construction of the reservoir.

53. Crown Fountain, excavation and construction of reservoir, September 30, 2003 Crown Fountain, excavation and construction of reservoir, September 30, 2003 Excavation; Retaining walls; Concrete; Automobiles; Trees; Construction equipment; Skyscrapers; Looking south toward the site during construction of Crown Fountain's reservoir. The Art Institute of Chicago is visible in the background.

54. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Structural systems; Snow; Tents; Skyscrapers; Construction equipment; Construction workers; Concrete; Automobiles; Looking south at the structural steel of the south tower and the weatherproof tent that was erected so that work could continue in cold weather. The Michigan Avenue street wall is visible in the background....

55. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Structural systems; Snow; Tents; Concrete; Construction equipment; Automobiles; Trees; Freshly-poured concrete on-site during construction of Crown Fountain's reservoir.

56. Crown Fountain, installing granite tiles, April 1, 2004 Crown Fountain, installing granite tiles, April 1, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Trees; Dollies (Moving equipment); Automobiles; Looking south toward the partially completed reflecting pool and south tower as a worker takes measurements. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background....

57. Crown Fountain, granite tiles, April 1, 2004 Crown Fountain, granite tiles, April 1, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Dollies (Moving equipment); Automobiles; Surveying equipment; Looking south toward the south tower of Crown Fountain as construction of the reflecting pool continues. To ensure the correct spacing between each of the granite tiles small, semi-circular spacers, seen...

58. Crown Fountain, installing granite tiles, April 1, 2004 Crown Fountain, installing granite tiles, April 1, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Concrete; Automobiles; Workers prepare to install another granite tile during construction of Crown Fountain.

59. Crown Fountain, surveying equipment, April 1, 2004 Crown Fountain, surveying equipment, April 1, 2004 Pedestals; Pipes (Conduits); Construction workers; Concrete; Surveying equipment; Automobiles; View of surveying equipment on the southwest corner of the site. The Art Institute of Chicago is visible in the background.

60. Crown Fountain, pedestal close-up, April 1, 2004 Crown Fountain, pedestal close-up, April 1, 2004 Pedestals; Tiles; Construction workers; Skyscrapers; Concrete; Trees; Dollies (Moving equipment); Automobiles; Close-up view of a pedestal atop newly installed granite tiles. The pedestals aren't visible in the completed fountain, but they hold the black granite tiles in place 1/4-inch below the surface of a reservoir...
select all : clear all : add to favorites
results 41-60 of 406 item(s)  page 3 of 21 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next