Chicago Public Library

   

 Español | Polski | 


 
Search results for Pails > Construction Workers   
Refine your search
Photographer
Unknown (105)

Neighborhood
Loop (Chicago, Ill.) (105)

results 41-60 of 105 item(s)  page 3 of 6 : ( <<  1  2  3  4  5  6  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

41. Cloud Gate, attaching steel plates, May 27, 2004 Cloud Gate, attaching steel plates, May 27, 2004 Steel; Structural systems; Trusses; Tents; Construction workers; Hoisting machinery; Pails; Cables and rigging on the partially completed sculpture.

42. Cloud Gate, attaching steel plates, May 27, 2004 Cloud Gate, attaching steel plates, May 27, 2004 Steel; Construction workers; Scaffolding; Pails; Scaffolding below the omphalos of the sculpture.

43. Cloud Gate, attaching steel plates, May 27, 2004 Cloud Gate, attaching steel plates, May 27, 2004 Steel; Construction workers; Scaffolding; Pails; Scaffolding below the omphalos of the sculpture.

44. Cloud Gate, attaching steel plates, May 27, 2004 Cloud Gate, attaching steel plates, May 27, 2004 Steel; Construction workers; Scaffolding; Pails; Scaffolding below the omphalos of the sculpture.

45. Cloud Gate, attaching steel plates, June 5, 2004 Cloud Gate, attaching steel plates, June 5, 2004 Steel; Trusses; Structural systems; Tents; Construction workers; Pails; Inside view of the partially completed sculpture showing the structure of iron trusses, cables and rigging, that temporarily held the steel plates in place while the sculpture was assembled. A worker is...

46. Cloud Gate, attaching steel plates, cables and rigging, June 5, 2004 Cloud Gate, attaching steel plates, cables and rigging, June 5, 2004 Steel; Trusses; Construction workers; Pails; Close-up view of cables and rigging on the partially completed sculpture.

47. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Construction workers; Celebrations; Pails; Scaffolding; Drinking vessels; Artist Anish Kapoor sips champagne during celebrating the installation of the final steel plate with a traditional "topping off" party.

48. Crown Fountain, excavation and construction of reservoir, October 6, 2003 Crown Fountain, excavation and construction of reservoir, October 6, 2003 Excavation; Retaining walls; Concrete; Trailers; Construction workers; Construction equipment; Trees; Skyscrapers; Pails; Looking north toward the site during construction of Crown Fountain's reservoir. Buildings along East Randolph Street are visible in the background.

49. Crown Fountain, excavation and construction of reservoir, October 27, 2003 Crown Fountain, excavation and construction of reservoir, October 27, 2003 Excavation; Retaining walls; Concrete; Construction equipment; Construction workers; Pails; Trees; Looking south along the west edge of the construction site.

50. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Chisels & mallets; Trees; Pails; Installation of the pedestals during construction of Crown Fountain's reflecting pool. In the completed fountain, the pedestals hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

51. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Structural systems; Surveying equipment; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

52. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. The Michigan Avenue street wall is visible in the background.

53. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Pails; Chisels & mallets; Construction workers; Trucks; Trees; Close-up view of a granite tile atop four pedestals during the construction of Crown Fountain's reflecting pool.

54. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; A worker begins to build the surface of the reflecting pool. The surface is made of tiles of black, African granite that are 3 feet square and weigh around 250 pounds each. They sit almost 2 feet above...

55. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir. Getting the black granite tiles...

56. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches off the ground, creating a space for a reservoir of water just...

57. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Trucks; Skyscrapers; Concrete; Trees; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir, and the water for the reflecting...

58. Crown Fountain, installation of granite tiles and pedestals, March 11, 2004 Crown Fountain, installation of granite tiles and pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Trucks; Skyscrapers; Concrete; Trees; Installation of granite tiles and pedestals with a view of the south tower. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background.

59. Crown Fountain, installation of granite tiles and pedestals, March 11, 2004 Crown Fountain, installation of granite tiles and pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Trucks; Skyscrapers; Concrete; Trees; Looking south toward the reservoir and south tower as workers install the first granite tiles and pedestals. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background....

60. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Crates; Pails; Skyscrapers; Concrete; Trees; Workers lift a granite tile into place atop the pedestals.
select all : clear all : add to favorites
results 41-60 of 105 item(s)  page 3 of 6 : ( <<  1  2  3  4  5  6  >> ) :: previous : next