Chicago Public Library

   

 Español | Polski | 


 
Search results for Highlight > Construction Workers   
Refine your search
Photographer
Unknown (59)

Neighborhood
Loop (Chicago, Ill.) (59)
Columbus Drive (Chicag... (3)
Michigan Avenue (Chica... (1)
Monroe Street (Chicago... (1)

results 21-40 of 59 item(s)  page 2 of 3 : ( <<  1  2  3  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

21. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Construction workers; Tents; I-beams; Reflections Ethan Silva, president of Performance Structures, Inc. (PSI) (top left), and artist Anish Kapoor (right) look on as workers guide the final steel plate into place on the sculpture. PSI fabricated the steel...

22. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Construction workers; Tents; I-beams; Flags; Reflections; Scaffolding; Close-up view of the last plate installed onto the sculpture.

23. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Construction workers; Scaffolding; Champagne (Wine); Drinking vessels; Celebrations; Artist Anish Kapoor pours champagne for the crew, celebrating the installation of the final steel plate with a traditional "topping off" party. During the party, Kapoor named the sculpture "Cloud Gate,"...

24. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Construction workers; Tents; Plywood; Photographs; Chairs; Celebrations; The crew that built Cloud Gate: in back row (left to right): Bob Truty, Paul Garcia, Dave Smith, Art Seroggin, Tony Krawczyk, Larry Truty, welder Matt Starzyk of MTH Industries, Bo Heidi, project manager...

25. Cloud Gate, polishing, May 19, 2005 Cloud Gate, polishing, May 19, 2005 Steel; Grinding; Scaffolding; Ladders; Construction workers; Tents; Reflections; A worker grinds the surface of the sculpture using a 15 pound air-driven belt sander (sometimes referred to as a road grader). Workers wore respirators and polyethylene jumpsuits for protection while polishing...

26. Cloud Gate, polishing, May 19, 2005 Cloud Gate, polishing, May 19, 2005 Steel; Scaffolding; Construction workers; Grinding; Tents; Reflections; Marks (Symbols); A worker grinds the sculpture using a platen sander (a.k.a an air-driven ten pound belt sander). After being ground with 40-grit sandpaper disks, the road grader was applied to the sculpture's surface,...

27. Cloud Gate, polishing, May 19, 2005 Cloud Gate, polishing, May 19, 2005 Steel; Scaffolding; Construction workers; Ladders; Reflections; Plywood; A worker refines the surface of the sculpture using a double action disk sander, rubbing out the fine scratches left from the platen sander. The official dedication ceremony for Cloud Gate occurred May...

28. Crown Fountain, excavation and construction of reservoir, September 25, 2003 Crown Fountain, excavation and construction of reservoir, September 25, 2003 Excavation; Construction workers; Retaining walls; Concrete; Concrete mixers; Trailers; Trees; Skyscrapers; Workmen are seen here pouring concrete into formwork for the retaining wall of Crown Fountain’s reservoir. The reflecting pool is 232 feet long by 48 feet wide and the reservoir below serves to gather...

29. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

30. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; A worker begins to build the surface of the reflecting pool. The surface is made of tiles of black, African granite that are 3 feet square and weigh around 250 pounds each. They sit almost 2 feet above...

31. Crown Fountain, granite tiles, April 1, 2004 Crown Fountain, granite tiles, April 1, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Dollies (Moving equipment); Automobiles; Surveying equipment; Looking south toward the south tower of Crown Fountain as construction of the reflecting pool continues. To ensure the correct spacing between each of the granite tiles small, semi-circular spacers, seen...

32. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Structural systems; Hoisting machinery; Construction workers; Pipes (Conduits); Concrete; I-beams; Trucks; Trailers; Skyscrapers; The north tower of Crown Fountain under construction. Each tower is 50 feet tall, 23 feet wide and 16 feet deep, separated by a 232 foot-long reflecting pool. At the bottom of this image the pipes that...

33. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Pipes (Conduits); A grid of glass bricks is lifted and hoisted into place on the north tower of Crown Fountain. LED panels are already in place on the tower and a gap shows where the “gargoyle” nozzle will be fitted....

34. Crown Fountain, Jaume Plensa and Mark Sexton visit the site, April 6, 2004 Crown Fountain, Jaume Plensa and Mark Sexton visit the site, April 6, 2004 Glass blocks; Structural frames; Construction workers; Ladders; Tiles; Trailers; Skyscrapers; Artist Jaume Plensa (left) and architect Mark Sexton view the north tower during Crown Fountain’s construction. The north tower has been fitted with all but the last LED panel which will go behind the...

35. Crown Fountain, aerial view of construction site, March 10, 2004 Crown Fountain, aerial view of construction site, March 10, 2004 Lawns; Structural systems; Reservoirs; Pipes (Conduits); Construction equipment; Construction workers; Crates; Trees; Lampposts; Sidewalks; Streets; Automobiles; Aerial view of the site of Crown Fountain, under construction. In this photograph both towers have been constructed and the LED panels are in place. Work has begun on the reflecting, or skin, pool. The...

36. Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Hoisting machinery; Construction workers; Skyscrapers; Concrete; Cantilever construction; Looking northeast toward the construction site as the steel skeleton of the Pavilion takes shape. The Jay Pritzker Pavilion shares some common space with its neighbor to the north, the Joan W. and Irving...

37. Jay Pritzker Pavilion, wrapping steel I-beams in rebar, October 15, 2002 Jay Pritzker Pavilion, wrapping steel I-beams in rebar, October 15, 2002 I-beams; Construction workers; Skyscrapers; Concrete; Steel I-beams were wrapped in rebar, or reinforcing bar, prior to their being cast in concrete. The Michigan Avenue street wall is visible in the background.

38. Jay Pritzker Pavilion, structural steel for the headdress, May 29, 2003 Jay Pritzker Pavilion, structural steel for the headdress, May 29, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Construction workers; Looking north toward the Pavilion where the structural steel for the headdress is being installed. Many times during construction there were as many as four or five large cranes on site, plus 18 aerial...

39. Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Hoisting machinery; Construction workers; Skyscrapers; Scaffolding; Looking northwest toward the newly installed steel and aluminum panels on the west side of the headdress. Once these steel and aluminum panels were installed onto the yellow back up structure, the final...

40. Jay Pritzker Pavilion, installing steel panels, July 1, 2003 Jay Pritzker Pavilion, installing steel panels, July 1, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Construction workers; Steel and aluminum panels are added to the underside of the headdress. The headdress, or proscenium, reaches a height of 120 feet above the stage and is an important part of the overall acoustical plan...
select all : clear all : add to favorites
results 21-40 of 59 item(s)  page 2 of 3 : ( <<  1  2  3  >> ) :: previous : next