Chicago Public Library

   

 Español | Polski | 


 
Search results for Wall   
Refine your search
Photographer
Unknown (363)

Neighborhood
Loop (Chicago, Ill.) (363)
Columbus Drive (Chicag... (40)
Michigan Avenue (Chica... (16)
Monroe Street (Chicago... (6)
Washington Street (Chi... (1)

Subject.TGM
Skyscrapers (299)
Trees (170)
Construction Workers (141)
Hoisting Machinery (101)
Lighting (87)
Show more...

results 61-80 of 363 item(s)  page 4 of 19 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

61. Crown Fountain, early site test, May 19, 2001 Crown Fountain, early site test, May 19, 2001 Mock-ups; Structural frames; Trees; Skyscrapers; Dirt; An on-site mock-up shows the scale and impact of one tower. The Michigan Avenue street wall is visible in the background.

62. Crown Fountain, early site test, May 19, 2001 Crown Fountain, early site test, May 19, 2001 Trees; Skyscrapers; Construction equipment; Construction workers;Dirt; View of the north end of the site. The outline of the skin pool is marked out in tape along the ground. Buildings along the Michigan Avenue street wall and East Randolph Street are visible in the background....

63. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Looking northwest from Monroe Street at the site of Crown Fountain before construction began. The Michigan Avenue street wall is visible in the background.

64. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Looking northwest toward the site from terrace level. The Michigan Avenue street wall is visible in the background.

65. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Lawns; Retaining walls; Detailed view of a partially installed pre-cast concrete retaining wall along the eastern edge of the site.

66. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; View south from the approximate location of the north tower before construction began. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background.

67. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; View south from the approximate location of the north tower before construction began. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background.

68. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Lawns; Stairways; Retaining walls; Detailed view of a partially installed pre-cast concrete retaining wall along the eastern edge of the site.

69. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; A close up view of an LED panel behind a mock-up of the glass brick wall. Each pixel is made up of five light emitting diodes, or LEDs, two red, two green and one blue, which can be manipulated into almost...

70. Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Cross-section of the inside of one of Crown Fountain’s towers showing the LED units and the glass brick walls. The space between the LEDs and the glass brick wall allows for ventilation and permits the...

71. Crown Fountain, site excavation, September 2, 2003 Crown Fountain, site excavation, September 2, 2003 Lawns; Trees; Excavation; Skyscrapers; The site of Crown Fountain as construction was underway. Located at the southwest corner of Millennium Park, the Crown Fountain enjoys very high visibility with pedestrians on Michigan Avenue and with...

72. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Skyscrapers; Trailers; Construction workers; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. Buildings along East Randolph Street are visible in the background.

73. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Skyscrapers; Trailers; Construction workers; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. Buildings along East Randolph Street are visible in the background.

74. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Skyscrapers; Trailers; Construction workers; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides.

75. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Skyscrapers; Trailers; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. The Chicago Cultural Center, formerly the Chicago Public Library, is visible in the background.

76. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Skyscrapers; Construction workers; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. The Michigan Avenue street wall is visible in the background.

77. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides.

78. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Retaining walls; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides.

79. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides.

80. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Construction workers; Automobiles; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. The Art Institute of Chicago is visible in the background.
select all : clear all : add to favorites
results 61-80 of 363 item(s)  page 4 of 19 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next