Chicago Public Library

   

 Español | Polski | 


 
Search results for Structure   
Refine your search
Photographer
Unknown (160)

Neighborhood
Loop (Chicago, Ill.) (160)
Columbus Drive (Chicag... (1)

Subject.TGM
Structural Frames (101)
Industrial Facilities (96)
Glass Blocks (93)
Mock-ups (88)
Lighting (47)
Show more...

results 141-160 of 160 item(s)  page 8 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

141. Crown Fountain, tower wall mock-up, ca. July 18, 2002 Crown Fountain, tower wall mock-up, ca. July 18, 2002 Architectural models; Wood blocks An early mock-up using wooden blocks representing glass bricks to test possible structures for the walls of the fountain's towers. This tongue and groove grid was not adopted in the finished fountain....

142. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Elevations; Fountains; Faces; An elevation showing a proposed structure for the glass brick walls of the fountain's towers using compression strap frame panels.

143. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Elevations; Fountains; An elevation showing a proposed structure for the glass brick walls of the fountain's towers using compression strap frame panels.

144. Jay Pritzker Pavilion, close-up view of steel skeleton, October 15, 2002 Jay Pritzker Pavilion, close-up view of steel skeleton, October 15, 2002 I-beams; Cantilever construction; Close-up view of the steel I-beams forming the skeletal structure of the Pavilion's roof.

145. Jay Pritzker Pavilion, constructing the glass doors, ca. October 30, 2003 Jay Pritzker Pavilion, constructing the glass doors, ca. October 30, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Stages (Platforms); The stage area of the Jay Pritzker Pavilion showing construction of the steel structure for the glass stage doors. Two massive glass and steel doors were built for the stage area of the Jay Pritzker Pavilion...

146. Jay Pritzker Pavilion, formwork and rebar, ca. May 2002 Jay Pritzker Pavilion, formwork and rebar, ca. May 2002 Concrete; Skyscrapers; Construction workers; Trees; Concrete formwork and rebar, or reinforcing bar, are visible as the basic structure begins to take shape. The Michigan Avenue street wall is visible in the background.

147. Jay Pritzker Pavilion, formwork, rebar and structural steel, ca. May 2002 Jay Pritzker Pavilion, formwork, rebar and structural steel, ca. May 2002 Concrete; Skyscrapers; Construction workers; Hoisting machinery; Ladders; Concrete formwork and rebar, or reinforcing bar, as well as structural steel, are visible as the basic structure begins to take shape.

148. Jay Pritzker Pavilion, headdress with blue lighting, March 22, 2004 Jay Pritzker Pavilion, headdress with blue lighting, March 22, 2004 Testing; Lighting; Skyscrapers; Looking north toward the Pavilion at night as it was illuminated in blue during a lighting test. The ribbons and the headdress of the Jay Pritzker Pavilion are even more dramatic at night when they are...

149. Jay Pritzker Pavilion, model, ca. 1999 Jay Pritzker Pavilion, model, ca. 1999 Architectural models; An oblique view of Frank Gehry’s architectural model for the Jay Pritzker Music Pavilion in Millennium Park. Gehry produced several models with alternate designs. The most elaborate model, shown here,...

150. Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Hoisting machinery; Construction workers; Skyscrapers; Scaffolding; Looking northwest toward the newly installed steel and aluminum panels on the west side of the headdress. Once these steel and aluminum panels were installed onto the yellow back up structure, the final...

151. Jay Pritzker Pavilion, pieces of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, pieces of structural steel for the headdress, February 6, 2003 Hoisting machinery; Construction workers; Concrete; Scaffolding; Pieces of structural steel on site before they were attached to form part of the support structure of the headdress.

152. Jay Pritzker Pavilion, rebar and formwork, October 15, 2002 Jay Pritzker Pavilion, rebar and formwork, October 15, 2002 Concrete; Cantilever construction; Scaffolding; Rebar and formwork are visible as the basic structure was taking shape.

153. Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Hoisting machinery; Cantilever construction; I-beams; Skyscrapers; View from below of the steel I-beams forming the skeletal structure of the Pavilion’s roof. In designing the stage area, Frank Gehry took great care to ensure that the sense of intimacy enjoyed by those...

154. Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Hoisting machinery; Cantilever construction; Skyscrapers; Concrete; I-beams; View from below of the steel I-beams forming the skeletal structure of the Pavilion's roof.

155. Jay Pritzker Pavilion, steel skeleton, October 15, 2002 Jay Pritzker Pavilion, steel skeleton, October 15, 2002 I-beams; Cantilever construction; View from below of the steel I-beams forming the skeletal structure of the Pavilion's roof.

156. Jay Pritzker Pavilion, steel skeleton, September 18, 2002 Jay Pritzker Pavilion, steel skeleton, September 18, 2002 Hoisting machinery; I-beams; View from below of the steel I-beams forming the skeletal structure of the Pavilion's roof.

157. Jay Pritzker Pavilion, structural steel, July 17, 2002 Jay Pritzker Pavilion, structural steel, July 17, 2002 Hoisting machinery; Trees; Lampposts; Skyscrapers; Concrete; Looking northeast toward the construction site of the Jay Pritzker Pavilion. Structural steel is visible as the basic structure begins to take shape. Buildings along East Randolph Street are visible in...

158. Jay Pritzker Pavilion, structural steel, rebar, July 17, 2002 Jay Pritzker Pavilion, structural steel, rebar, July 17, 2002 Hoisting machinery; Skyscrapers; Concrete; Shrubs; Looking northeast toward the construction site of the Jay Pritzker Pavilion. Structural steel and rebar, or reinforcing bar, are visible as the basic structure begins to take shape. Buildings along East...

159. Millennium Monument at Wrigley Square, entablature under construction, July 22, 2002 Millennium Monument at Wrigley Square, entablature under construction, July 22, 2002 Friezes (Entablature components); Construction workers; Construction; Construction equipment; Pails; The top of the frieze of Millennium Monument at Wrigley Square during construction, showing some of the support structure beneath the limestone.

160. Millennium Monument at Wrigley Square, ramp, October 15, 2002 Millennium Monument at Wrigley Square, ramp, October 15, 2002 Inclined planes; Peristyles; Cultural facilities; Looking west toward the Chicago Cultural Center, formerly the Chicago Public Library, from the ramp behind the peristyle. The rusticated stone along the base of the peristyle is a strong contrast to the...
select all : clear all : add to favorites
results 141-160 of 160 item(s)  page 8 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next