Chicago Public Library

   

 Español | Polski | 


 
Search results for Structure   
Refine your search
Photographer
Unknown (160)

Neighborhood
Loop (Chicago, Ill.) (160)
Columbus Drive (Chicag... (1)

Subject.TGM
Structural Frames (101)
Industrial Facilities (96)
Glass Blocks (93)
Mock-ups (88)
Lighting (47)
Show more...

results 121-140 of 160 item(s)  page 7 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

121. Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Hoisting machinery; Construction workers; Skyscrapers; Scaffolding; Looking northwest toward the newly installed steel and aluminum panels on the west side of the headdress. Once these steel and aluminum panels were installed onto the yellow back up structure, the final...

122. Millennium Monument at Wrigley Square, ramp, October 15, 2002 Millennium Monument at Wrigley Square, ramp, October 15, 2002 Inclined planes; Peristyles; Cultural facilities; Looking west toward the Chicago Cultural Center, formerly the Chicago Public Library, from the ramp behind the peristyle. The rusticated stone along the base of the peristyle is a strong contrast to the...

123. Crown Fountain, LED test in Millennium Park, October 3, 2002 Crown Fountain, LED test in Millennium Park, October 3, 2002 Mock-ups; Glass blocks; Scaffolding; Construction equipment; Skyscrapers; Flags; Fog; Eyes; Lighting; On a gloomy, overcast day in Chicago a second LED test was conducted on site. Glass brick panels and LED panels were temporarily erected in Millennium Park at the approximate height of the towers to check...

124. Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Industrial facilities; Structural frames; Glass blocks; Fans (Machinery); Pails; Shelving; Once the glass bricks were made by L.E. Smith in Mt. Pleasant, Pennsylvania, they were sent to the offices of Circle Redmont, Inc., to be assembled into steel grids, shown here.

In Plensa’s...

125. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Glass blocks; Structural frames; Trees; Panels of glass blocks on an outdoor lot at the headquarters of Circle Redmont Inc. in Melbourne, Florida. Circle Redmont, a pre-fabricated glass panel company, engineered and fabricated a hidden support...

126. Jay Pritzker Pavilion, pieces of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, pieces of structural steel for the headdress, February 6, 2003 Hoisting machinery; Construction workers; Concrete; Scaffolding; Pieces of structural steel on site before they were attached to form part of the support structure of the headdress.

127. Cloud Gate, attaching steel plates, April 29, 2004 Cloud Gate, attaching steel plates, April 29, 2004 Steel; Construction workers; Structural systems; Trusses; Tents; Project supervisor Nick Taylor (left) of Performance Structures, Inc. (PSI) adjusts a steel plate as it is attached to the sculpture. Nick Taylor was the only representative from Performance Structures,...

128. Jay Pritzker Pavilion, rebar and formwork, October 15, 2002 Jay Pritzker Pavilion, rebar and formwork, October 15, 2002 Concrete; Cantilever construction; Scaffolding; Rebar and formwork are visible as the basic structure was taking shape.

129. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Tents; Goggles; Side view of a glass brick panel mock-up at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for the tower walls of Crown...

130. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

131. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

132. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

133. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

134. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

135. Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

136. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

137. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a sample glass brick panel and an LED screen. The sample was created to test a possible steel support structure for the tower walls of Crown Fountain.

138. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a sample glass brick panel and an LED screen. The sample was created to test a possible steel support structure for the tower walls of Crown Fountain.

139. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Side view of a sample glass brick panel and an LED screen. The sample was created to test a possible steel support structure for the tower walls of Crown Fountain. Triangular spacers, visible here in rows...

140. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Girders; Tents; Automobiles; Barrels; Steel beams on an outdoor lot at the headquarters of Circle Redmont Inc. in Melbourne, Florida. Circle Redmont engineered and fabricated a hidden support structure for the glass brick walls of Crown Fountain....
select all : clear all : add to favorites
results 121-140 of 160 item(s)  page 7 of 8 : ( <<  1  2  3  4  5  6  7  8  >> ) :: previous : next