Chicago Public Library

   

 Español | Polski | 


 
Search results for Site.   
Refine your search
Photographer
Unknown (690)

Neighborhood
Loop (Chicago, Ill.) (689)
Columbus Drive (Chicag... (272)
Randolph Street (Chica... (268)
Monroe Street (Chicago... (94)
Michigan Avenue (Chica... (86)
Show more...

Subject.TGM
Trees (491)
Skyscrapers (462)
Streets (381)
Construction Equipment (373)
Hoisting Machinery (372)
Show more...

results 61-80 of 690 item(s)  page 4 of 35 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

61. Crown Fountain, early site test, May 19, 2001 Crown Fountain, early site test, May 19, 2001 Trees; Skyscrapers; Construction equipment;Dirt; View of the northeast corner of the site. The Blue Cross-Blue Shield Tower is visible in the background.

62. Crown Fountain, early site test, May 19, 2001 Crown Fountain, early site test, May 19, 2001 Trees; Skyscrapers; Construction equipment; Construction workers;Dirt; View of the north end of the site. The outline of the skin pool is marked out in tape along the ground. Buildings along the Michigan Avenue street wall and East Randolph Street are visible in the background....

63. Crown Fountain, early site test, ca. May 19, 2001 Crown Fountain, early site test, ca. May 19, 2001 Mock-ups; Structural frames; Trees; Construction equipment; Dirt; An on-site mock-up shows the scale and impact of one tower.

64. Crown Fountain, early site test, ca. May 19, 2001 Crown Fountain, early site test, ca. May 19, 2001 Trees; Skyscrapers; Construction equipment; Construction workers; Dirt; Tape outlines on a dirt field in May, 2001 showed the future perimeter of Crown Fountain. Buildings along East Randolph Street are visible in the background.

65. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Looking northwest from Monroe Street at the site of Crown Fountain before construction began. The Michigan Avenue street wall is visible in the background.

66. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Looking north along the eastern edge of the site of Crown Fountain before construction began. Buildings along East Randolph Street are visible in the background.

67. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Construction equipment; View of the exit stair enclosure at the east edge of the site. The Blue Cross-Blue Shield Tower is visible in the background.

68. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Looking north at terrace level above the site.

69. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Looking northwest toward the site from terrace level. The Michigan Avenue street wall is visible in the background.

70. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Lawns; Retaining walls; Detailed view of a partially installed pre-cast concrete retaining wall along the eastern edge of the site.

71. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; View south from the approximate location of the north tower before construction began. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background.

72. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; View south from the approximate location of the north tower before construction began. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background.

73. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Lawns; Stairways; Retaining walls; Detailed view of a partially installed pre-cast concrete retaining wall along the eastern edge of the site.

74. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Lawns; Dirt; Lampposts; Stairways; Automobiles; Looking southeast from the approximate north entry point off Michigan Avenue before construction began.

75. Crown Fountain, LED test in Millennium Park, October 3, 2002 Crown Fountain, LED test in Millennium Park, October 3, 2002 Mock-ups; Glass blocks; Scaffolding; Construction equipment; Skyscrapers; Flags; Fog; Eyes; Lighting; On a gloomy, overcast day in Chicago a second LED test was conducted on site. Glass brick panels and LED panels were temporarily erected in Millennium Park at the approximate height of the towers to check...

76. Crown Fountain, assembly in Melbourne, Florida, ca. October 15, 2003 Crown Fountain, assembly in Melbourne, Florida, ca. October 15, 2003 Industrial facilities; Warehouses; Shelving; Chief Operations Officer Kevin Sandor (left) and Jeff Barrett of Circle Redmont Inc. in a warehouse at the headquarters of Circle Redmont Inc. in Melbourne, Florida, where panels for the tower walls of...

77. Crown Fountain, assembly in Melbourne, Florida, ca. October 31, 2003 Crown Fountain, assembly in Melbourne, Florida, ca. October 31, 2003 Industrial facilities; Structural frames; A steel grid fabricated by Circle Redmont Inc., in Melbourne, Florida, before glass bricks were inserted into the openings. Circle Redmont fabricated 5 feet-by-16 feet and 5 feet-by-23 feet stainless steel...

78. Crown Fountain, assembly in Melbourne, Florida, ca. November 14, 2003 Crown Fountain, assembly in Melbourne, Florida, ca. November 14, 2003 Industrial facilities; Structural frames; A stack of steel grids fabricated by Circle Redmont Inc., in Melbourne, Florida, before glass bricks were added. Circle Redmont fabricated 5 feet-by-16 feet and 5 feet-by-23 feet stainless steel grids...

79. Crown Fountain, assembly in Melbourne, Florida, ca. January 29, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. January 29, 2004 Industrial facilities; Structural frames; Glass blocks; Fans (Machinery); Pails; A glass brick panel fabricated and assembled by Circle Redmont Inc., in Melbourne, Florida. The panel is made up of a steel grid with glass bricks in each of the openings. The bricks were adhered to their...

80. Crown Fountain, site excavation, September 2, 2003 Crown Fountain, site excavation, September 2, 2003 Lawns; Trees; Trailers; The southwest corner of Millennium Park was fenced off in September, 2003 as preparation for the construction of Crown Fountain began.
select all : clear all : add to favorites
results 61-80 of 690 item(s)  page 4 of 35 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next