Chicago Public Library

   

 Español | Polski | 


 
Search results for Ribbons   
Refine your search
Photographer
Unknown (23)

Neighborhood
Loop (Chicago, Ill.) (23)
Columbus Drive (Chicag... (1)
Michigan Avenue (Chica... (1)
Randolph Street (Chica... (1)
Washington Street (Chi... (1)

Subject.TGM
Skyscrapers (15)
Hoisting Machinery (14)
Cantilever Constructio... (13)
Scaffolding (13)
Construction Workers (6)
Show more...

results 1-20 of 23 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Jay Pritzker Pavilion, headdress, March 4, 2004 Jay Pritzker Pavilion, headdress, March 4, 2004 A view of the underside of the ribbons on the headdress. A worker’s yellow hard hat is visible between the folds of steel.

2. Jay Pritzker Pavilion, lights and speakers, May 27, 2004 Jay Pritzker Pavilion, lights and speakers, May 27, 2004 Cantilever construction; A view showing where the trellis connects with the headdress of the Jay Pritzker Pavilion. Taken around six weeks before Millennium Park opened to the public, this photograph shows where the trellis and...

3. Jay Pritzker Pavilion, headdress, March 23, 2004 Jay Pritzker Pavilion, headdress, March 23, 2004 Cantilever construction; Construction equipment; Streets; Automobiles; An aerial view of the Jay Pritzker Pavilion’s headdress under construction. The finished stainless steel plates have been installed onto the ribbons of the headdress, or proscenium, and work continues...

4. Jay Pritzker Pavilion, partially-built cantilever, ca. January 9, 2003 Jay Pritzker Pavilion, partially-built cantilever, ca. January 9, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Concrete; Skyscrapers; Looking northeast toward the construction site and the partially-built cantilever, which provides support for the headdress. The nature of the design demanded that the structural steel had to be perfectly...

5. Jay Pritzker Pavilion, constructing the stage, ca. August 10, 2003 Jay Pritzker Pavilion, constructing the stage, ca. August 10, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Construction workers; Ceilings; Looking north toward the partially constructed stage. The wooden panels of the ceiling are partially visible and the innermost ribbons of the headdress can be seen.

6. Jay Pritzker Pavilion, view of partially constructed headdress, ca. August 10, 2003 Jay Pritzker Pavilion, view of partially constructed headdress, ca. August 10, 2003 Construction workers; Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Looking north toward the western ribbons of the headdress. Concrete columns, part of the trellis support system, are visible in the foreground.

7. McCormick Tribune Plaza and Ice Rink, dedication, December 20, 2001 McCormick Tribune Plaza and Ice Rink, dedication, December 20, 2001 Dedications; Mayors; Actors; Business people; Ribbons; The opening of the McCormick Tribune Plaza and Ice Rink, the first major enhancement of Millennium Park to be completed. Left to right, Mayor Richard M. Daley, actress Bonnie Hunt, Millennium Park Inc....

8. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Looking northeast toward the Pavilion as crane lifts a section of trellis into place in between ribbons of the headdress.

9. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Looking northeast toward the Pavilion as a crane lifts a section of trellis into place in between ribbons of the headdress. Blue Cross-Blue Shield Tower is visible in the background.

10. Jay Pritzker Pavilion, installing steel panels, November 12, 2003 Jay Pritzker Pavilion, installing steel panels, November 12, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Construction workers; Workers atop a lift install the final layer of steel panels onto one of the ribbons of the headdress.

11. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Cantilever construction; Skyscrapers; Scaffolding; A crane lifts a section of the trellis into place in between ribbons of the headdress.

12. Jay Pritzker Pavilion, installing steel panels, November 12, 2003 Jay Pritzker Pavilion, installing steel panels, November 12, 2003 Hoisting machinery; Construction workers; Workers atop a lift install the final layer of steel panels onto one of the ribbons of the headdress.

13. Jay Pritzker Pavilion, installing steel panels, November 12, 2003 Jay Pritzker Pavilion, installing steel panels, November 12, 2003 Hoisting machinery; Scaffolding; Workers atop a lift install steel panels onto one of the ribbons of the headdress. The overhead trellis is also visible.

14. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Scaffolding; Cantilever construction; A section of the trellis is lifted into place in between ribbons of the headdress.

15. Jay Pritzker Pavilion, installing structural steel for the headdress, May 13, 2003 Jay Pritzker Pavilion, installing structural steel for the headdress, May 13, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Construction workers; Sawhorses; Structural steel for the headdress was hoisted from above by a crane during installation. The first steel panels had been added as the ribbons of the headdress began to take shape.

16. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Ladders; A section of the trellis is lifted into place in between ribbons of the headdress.

17. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Skyscrapers; A section of the partially-built trellis is bolted to a concrete column. One of the headdress's ribbons is visible in the background.

18. Jay Pritzker Pavilion, trellis with speakers, June 30, 2004 Jay Pritzker Pavilion, trellis with speakers, June 30, 2004 Lawns; Skyscrapers; Trees; Hoisting machinery; Cantilever construction; Looking northwest from the back of the Great Lawn toward the stage and headdress of the Jay Pritzker Pavilion. With a little over two weeks left before Millennium Park opened to the public this photograph...

19. Crown Fountain, LED test in Millennium Park, October 3, 2002 Crown Fountain, LED test in Millennium Park, October 3, 2002 Mock-ups; Glass blocks; Scaffolding; Construction equipment; Skyscrapers; Flags; Fog; Eyes; Lighting; On a gloomy, overcast day in Chicago a second LED test was conducted on site. Glass brick panels and LED panels were temporarily erected in Millennium Park at the approximate height of the towers to check...

20. Jay Pritzker Pavilion, constructing the trellis, June 19, 2003 Jay Pritzker Pavilion, constructing the trellis, June 19, 2003 Scaffolding; Skyscrapers; Construction workers; A close-up view of part of the trellis before it was installed over the Great Lawn. Inkeeping with Frank Gehry’s distinctive style, the trellis that spans the Great Lawn is not only attractive and adds...
select all : clear all : add to favorites
results 1-20 of 23 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next