Chicago Public Library

   

 Español | Polski | 


 
Search results for Place   
Refine your search
Photographer
Unknown (312)

Neighborhood
Loop (Chicago, Ill.) (312)
Columbus Drive (Chicag... (41)
Michigan Avenue (Chica... (3)
Monroe Street (Chicago... (1)
Randolph Street (Chica... (1)

Subject.TGM
Hoisting Machinery (228)
Construction Workers (222)
Steel (136)
Tents (128)
Structural Systems (113)
Show more...

results 221-240 of 312 item(s)  page 12 of 16 : ( <<  11  12  13  14  15  16  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

221. Crown Fountain, video still with notes, July 30, 2003 Crown Fountain, video still with notes, July 30, 2003 Film stills; Pens; Marks (Symbols); A printed out image of a face that will be included in Crown Fountain’s video bank, showing some of the considerations the film makers had to take into account.

The dimensions of Crown Fountain,...

222. Crown Fountain, video filming, May 20, 2004 Crown Fountain, video filming, May 20, 2004 Motion picture studios; Video recording; Ladders; Chairs; Behind the scenes on set as filming took place.

223. Crown Fountain, aerial view of construction site, March 10, 2004 Crown Fountain, aerial view of construction site, March 10, 2004 Lawns; Structural systems; Reservoirs; Pipes (Conduits); Construction equipment; Construction workers; Crates; Trees; Lampposts; Sidewalks; Streets; Automobiles; Aerial view of the site of Crown Fountain, under construction. In this photograph both towers have been constructed and the LED panels are in place. Work has begun on the reflecting, or skin, pool. The...

224. Jay Pritzker Pavilion, structural steel, July 17, 2002 Jay Pritzker Pavilion, structural steel, July 17, 2002 Hoisting machinery; Shrubs; Wheelbarrows; Concrete; Skyscrapers; Looking northeast toward the construction site of the Jay Pritzker Pavilion as structural steel was erected and formwork was put in place prior to concrete being poured. Buildings along East Randolph Street...

225. Jay Pritzker Pavilion, structural steel and formwork, July 17, 2002 Jay Pritzker Pavilion, structural steel and formwork, July 17, 2002 Automobiles; Hoisting machinery; Skyscrapers; Concrete; Construction workers; Looking north toward the construction site of the Jay Pritzker Pavilion as structural steel was erected and formwork was put in place prior to concrete being poured.

226. Jay Pritzker Pavilion, structural steel and formwork, July 17, 2002 Jay Pritzker Pavilion, structural steel and formwork, July 17, 2002 Concrete; Skyscrapers; Construction workers; Hoisting machinery; As structural steel was erected, formwork was put in place prior to concrete being poured.

227. Jay Pritzker Pavilion, structural steel and formwork, ca. July 17, 2002 Jay Pritzker Pavilion, structural steel and formwork, ca. July 17, 2002 Hoisting machinery; Skyscrapers; Automobiles; Looking north toward the construction site of the Jay Pritzker Pavilion as structural steel was erected and formwork was put in place prior to concrete being poured.

228. Jay Pritzker Pavilion, structural steel and formwork, ca. July 17, 2002 Jay Pritzker Pavilion, structural steel and formwork, ca. July 17, 2002 Concrete; Hoisting machinery; Skyscrapers; Looking northeast toward the construction site of the Jay Pritzker Pavilion as structural steel was erected and formwork was put in place prior to concrete being poured. Buildings along Randolph Street...

229. Jay Pritzker Pavilion, view with cranes, April 17, 2003 Jay Pritzker Pavilion, view with cranes, April 17, 2003 Hoisting machinery; Flags; Skyscrapers; Cantilever construction; Scaffolding; Trailers; Looking north toward two large cranes at the construction site. The cranes were used to lift structural steel into place on the Pavilion. Concrete columns, which will support the overhead trellis, are...

230. Jay Pritzker Pavilion, installation of structural steel for the headdress, May 13, 2003 Jay Pritzker Pavilion, installation of structural steel for the headdress, May 13, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Skyscrapers; Flowers; A crane lifts structural steel for the headdress into place on the Pavilion. The Blue Cross-Blue Shield Tower is visible in the background.

231. Jay Pritzker Pavilion, installation of structural steel for the headdress, May 13, 2003 Jay Pritzker Pavilion, installation of structural steel for the headdress, May 13, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Flowers; Traffic signs & signals; Streets; Skyscrapers; Lampposts; Looking east, the partially-built headdress is in profile as a crane lifts structural steel into place. The distance the headdress, or proscenium, extends from the stage provides a cover for most of the...

232. Jay Pritzker Pavilion, structural steel for the headdress, June 5, 2003 Jay Pritzker Pavilion, structural steel for the headdress, June 5, 2003 Hoisting machinery; Scaffolding; Cantilever construction; View from below of the Pavilion where the structural steel for the headdress is being installed. Two cranes are visible, used for hoisting the steel into place.

233. Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Close-up view of newly installed steel panels from behind, showing the structural steel that holds them in place.

234. Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Close-up view of newly installed steel panels from behind, showing the structural steel that holds them in place.

235. Jay Pritzker Pavilion, aerial view, installing steel panels, February 14, 2004 Jay Pritzker Pavilion, aerial view, installing steel panels, February 14, 2004 Hoisting machinery; Cantilever construction; Construction equipment; Streets; Snow; An aerial view of the Jay Pritzker Pavilion under construction. Five months before Millennium Park opened to the public, work continues on the Pavilion. Steel and aluminum panels are still being installed...

236. Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Hoisting machinery; Cantilever construction; Wheelbarrows; A profile view of the Pavilion as the steel panels were going up onto the headdress. A large crane was used to hoist the panels into place.

237. Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Hoisting machinery; Cantilever construction; Skyscrapers; Lampposts; A profile view of the Pavilion as the steel panels were going up onto the headdress. A large crane was used to hoist the panels into place.

238. Jay Pritzker Pavilion, constructing the trellis, July 1, 2003 Jay Pritzker Pavilion, constructing the trellis, July 1, 2003 Hoisting machinery; Scaffolding; Construction workers; A crane lifts a section of the trellis into its place atop a column.

239. Jay Pritzker Pavilion, constructing the trellis, July 1, 2003 Jay Pritzker Pavilion, constructing the trellis, July 1, 2003 Hoisting machinery; Scaffolding; Construction workers; A crane lifts a section of the trellis into its place atop a column.

240. Jay Pritzker Pavilion, constructing the trellis, July 1, 2003 Jay Pritzker Pavilion, constructing the trellis, July 1, 2003 Construction workers; Scaffolding; Flags; A worker guides a section of the trellis into its place as it is hoisted from above by a crane.
select all : clear all : add to favorites
results 221-240 of 312 item(s)  page 12 of 16 : ( <<  11  12  13  14  15  16  >> ) :: previous : next