Chicago Public Library

   

 Español | Polski | 


 
Search results for Place   
Refine your search
Photographer
Unknown (312)

Neighborhood
Loop (Chicago, Ill.) (312)
Columbus Drive (Chicag... (41)
Michigan Avenue (Chica... (3)
Monroe Street (Chicago... (1)
Randolph Street (Chica... (1)

Subject.TGM
Hoisting Machinery (228)
Construction Workers (222)
Steel (136)
Tents (128)
Structural Systems (113)
Show more...

results 41-60 of 312 item(s)  page 3 of 16 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

41. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Tents; Photographers; A photographer has climbed up the side of the tent for a better view of the last steel plate going into place on the sculpture.

42. Cloud Gate, attaching steel plates, April 1, 2004 Cloud Gate, attaching steel plates, April 1, 2004 Steel; Trusses; Structural systems; Construction workers; Hoisting machinery; Dollies (Moving equipment); A pole is looped through the back of a steel plate, and used to maneuver the plate into place.

43. Crown Fountain, video still with notes, July 30, 2003 Crown Fountain, video still with notes, July 30, 2003 Film stills; Pens; Marks (Symbols); A printed out image of a face that will be included in Crown Fountain’s video bank, showing some of the considerations the film makers had to take into account.

The dimensions of Crown Fountain,...

44. Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Hoisting machinery; Cantilever construction; Wheelbarrows; A profile view of the Pavilion as the steel panels were going up onto the headdress. A large crane was used to hoist the panels into place.

45. Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Jay Pritzker Pavilion, installing steel panels, February 27, 2004 Hoisting machinery; Cantilever construction; Skyscrapers; Lampposts; A profile view of the Pavilion as the steel panels were going up onto the headdress. A large crane was used to hoist the panels into place.

46. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Scaffolding; Cantilever construction; A section of the trellis is lifted into place in between ribbons of the headdress.

47. Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Jay Pritzker Pavilion, constructing the trellis, August 10, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Ladders; A section of the trellis is lifted into place in between ribbons of the headdress.

48. Cloud Gate, attaching steel plates, May 3, 2004 Cloud Gate, attaching steel plates, May 3, 2004 Steel; Structural systems; Trusses; Plywood; Tents; Construction workers; Hoisting machinery; Ladders; A stand is moved out of the way as workers guide a steel plate, hoisted from above by a crane, into place on the sculpture.

49. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

50. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

51. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

52. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

53. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Construction workers; Structural systems; Hoisting machinery; Skyscrapers; A worker atop a lift makes adjustments as a crane hoists structural steel into place on the north tower of Crown Fountain.

54. Cloud Gate, attaching steel plates, May 3, 2004 Cloud Gate, attaching steel plates, May 3, 2004 Steel; Tents; Construction workers; Dollies (Moving equipment); Ladders; Structural frames; A worker attaches an eyelet to a steel plate. Poles were threaded through the eyelets to help hoist the plate into place.

55. Cloud Gate, attaching steel plates, May 3, 2004 Cloud Gate, attaching steel plates, May 3, 2004 Steel; Construction workers; Dollies (Moving equipment); Structural frames; Marks (Symbols); A worker attaches an eyelet to a steel plate. Poles were threaded through the eyelets to help hoist the plate into place.

56. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Trees; Crates; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane.

57. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Trees; Crates; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane.

58. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Structural systems; Construction workers; Pipes (Conduits); Concrete; Trailers; Footprints; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane.

59. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Structural systems; Construction workers; Trailers; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane.

60. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Structural systems; Construction workers; Pipes (Conduits); Ladders; Concrete; Trees; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane.
select all : clear all : add to favorites
results 41-60 of 312 item(s)  page 3 of 16 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next