Chicago Public Library

   

 Español | Polski | 


 
Search results for Place   
Refine your search
Photographer
Unknown (312)

Neighborhood
Loop (Chicago, Ill.) (312)
Columbus Drive (Chicag... (41)
Michigan Avenue (Chica... (3)
Monroe Street (Chicago... (1)
Randolph Street (Chica... (1)

Subject.TGM
Hoisting Machinery (228)
Construction Workers (222)
Steel (136)
Tents (128)
Structural Systems (113)
Show more...

results 161-180 of 312 item(s)  page 9 of 16 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

161. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Construction workers; Tents; I-beams; Flags; Reflections; Scaffolding; Workers remove ropes from the final plate, after it has been fit into place on the sculpture.

162. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Construction workers; Tents; I-beams; Reflections; Workers remove ropes from the final plate, after it has been fit into place on the sculpture.

163. Crown Fountain, meeting in Chicago, May 13, 2002 Crown Fountain, meeting in Chicago, May 13, 2002 Alleys; Glass blocks; Lighting; Architects' offices; Testing the LED display through different glass blocks in an alley in Chicago. One of the most important aspects of Crown Fountain that the project team worked on was the clarity of the images projected...

164. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; An LED screen is taken down from its place behind a glass brick panel mock-up at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support...

165. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Trees; Mark Sexton of Krueck + Sexton Architects looks on as Steve Simard of Barco (right) helps to take down an LED screen from its place behind a glass brick panel mock-up at the headquarters of Circle Redmont...

166. Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Industrial facilities; Structural frames; Glass blocks; Fans (Machinery); Pails; Shelving; Once the glass bricks were made by L.E. Smith in Mt. Pleasant, Pennsylvania, they were sent to the offices of Circle Redmont, Inc., to be assembled into steel grids, shown here.

In Plensa’s...

167. Crown Fountain, excavation and construction of reservoir, September 25, 2003 Crown Fountain, excavation and construction of reservoir, September 25, 2003 Excavation; Retaining walls; Construction workers; Concrete; Hammers; Goggles; A worker hammers rebar, or reinforcing bar, into place on the concrete base of the fountain's reservoir.

168. Crown Fountain, excavation and construction of reservoir, September 25, 2003 Crown Fountain, excavation and construction of reservoir, September 25, 2003 Excavation; Retaining walls; Construction workers; Concrete; Hammers; A worker hammers rebar, or reinforcing bar, into place on the concrete base of the fountain's reservoir.

169. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

170. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

171. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

172. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

173. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Chisels & mallets; Trees; Pails; Installation of the pedestals during construction of Crown Fountain's reflecting pool. In the completed fountain, the pedestals hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

174. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Crates; Pails; Skyscrapers; Concrete; Trees; Workers lift a granite tile into place atop the pedestals.

175. Crown Fountain, pedestal close-up, April 1, 2004 Crown Fountain, pedestal close-up, April 1, 2004 Pedestals; Tiles; Construction workers; Skyscrapers; Concrete; Trees; Dollies (Moving equipment); Automobiles; Close-up view of a pedestal atop newly installed granite tiles. The pedestals aren't visible in the completed fountain, but they hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

176. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Structural systems; Hoisting machinery; Automobiles; Street lights; Traffic signs & signals; Streets; Trees; View from across Michigan Avenue as the structural steel of the north tower is hoisted into place by a crane.

177. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Hoisting machinery; Structural systems; Trees; Street lights; A crane hoists structural steel into place on the north tower of Crown Fountain.

178. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Construction workers; Structural systems; Hoisting machinery; Skyscrapers; A worker atop a lift makes adjustments as a crane hoists structural steel into place on the north tower of Crown Fountain.

179. Crown Fountain, structural steel, construction of towers, December 11, 2003 Crown Fountain, structural steel, construction of towers, December 11, 2003 Structural systems; Hoisting machinery; Skyscrapers; A crane hoists a section of structural steel into place on the north tower of Crown Fountain.

180. Crown Fountain, structural steel, construction of towers, December 11, 2003 Crown Fountain, structural steel, construction of towers, December 11, 2003 Structural systems; Hoisting machinery; Concrete; Trailers; I-beams; Retaining walls; Trees; Skyscrapers; A crane hoists a section of structural steel into place on the north tower of Crown Fountain. The Michigan Avenue street wall is visible in the background.
select all : clear all : add to favorites
results 161-180 of 312 item(s)  page 9 of 16 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next