Chicago Public Library

   

 Español | Polski | 


 
Search results for Place   
Refine your search
Photographer
Unknown (312)

Neighborhood
Loop (Chicago, Ill.) (312)
Columbus Drive (Chicag... (41)
Michigan Avenue (Chica... (3)
Monroe Street (Chicago... (1)
Randolph Street (Chica... (1)

Subject.TGM
Hoisting Machinery (228)
Construction Workers (222)
Steel (136)
Tents (128)
Structural Systems (113)
Show more...

results 121-140 of 312 item(s)  page 7 of 16 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

121. Crown Fountain, video filming, May 20, 2004 Crown Fountain, video filming, May 20, 2004 Motion picture studios; Video recording; Ladders; Chairs; Behind the scenes on set as filming took place.

122. Crown Fountain, pedestal close-up, April 1, 2004 Crown Fountain, pedestal close-up, April 1, 2004 Pedestals; Tiles; Construction workers; Skyscrapers; Concrete; Trees; Dollies (Moving equipment); Automobiles; Close-up view of a pedestal atop newly installed granite tiles. The pedestals aren't visible in the completed fountain, but they hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

123. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Chisels & mallets; Trees; Pails; Installation of the pedestals during construction of Crown Fountain's reflecting pool. In the completed fountain, the pedestals hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

124. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Crates; Pails; Skyscrapers; Concrete; Trees; Workers lift a granite tile into place atop the pedestals.

125. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

126. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

127. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

128. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

129. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of rebar at SBC Plaza during its construction. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger and more durable than...

130. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of rebar at SBC Plaza during its construction. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger and more durable than...

131. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of a tape measure next to rebar during the construction of SBC Plaza. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger...

132. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of a tape measure next to rebar during the construction of SBC Plaza. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger...

133. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of a tape measure next to rebar during the construction of SBC Plaza. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger...

134. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of a tape measure next to rebar during the construction of SBC Plaza. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger...

135. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of a tape measure next to rebar during the construction of SBC Plaza. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger...

136. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Close-up view of rebar at SBC Plaza during its construction. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger and more durable than...

137. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Construction workers; Skyscrapers; Structural systems; Looking southwest toward SBC Plaza during its construction. Rebar, or reinforcing bar, latticework is in place at SBC Plaza, in preparation for pouring the concrete. SBC Plaza is located atop the roof...

138. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Marks (Symbols); Close-up view of rebar at SBC Plaza during its construction. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger and more durable than...

139. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Marks (Symbols); Close-up view of rebar at SBC Plaza during its construction. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger and more durable than...

140. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Snow; Marks (Symbols); Close-up view of rebar at SBC Plaza during its construction. Rebar, or reinforcing bar, is put in place before the concrete is poured. The resulting reinforced concrete is stronger and more durable than...
select all : clear all : add to favorites
results 121-140 of 312 item(s)  page 7 of 16 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next