Chicago Public Library

   

 Español | Polski | 


 
Search results for Perfectly   
Refine your search
Photographer
Unknown (3)

Neighborhood
Loop (Chicago, Ill.) (3)

Subject.TGM
Hoisting Machinery (2)
Skyscrapers (2)
Concrete (2)
Construction Workers (2)
Girders (1)
Show more...

results 1-3 of 3 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; A worker begins to build the surface of the reflecting pool. The surface is made of tiles of black, African granite that are 3 feet square and weigh around 250 pounds each. They sit almost 2 feet above...

2. Jay Pritzker Pavilion, partially-built cantilever, ca. January 9, 2003 Jay Pritzker Pavilion, partially-built cantilever, ca. January 9, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Concrete; Skyscrapers; Looking northeast toward the construction site and the partially-built cantilever, which provides support for the headdress. The nature of the design demanded that the structural steel had to be perfectly...

3. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Construction workers; Girders; The central box girder is lowered into place on top of a central concrete pier in the median strip of Columbus Drive during a 12-hour period when the busy six-lane road was closed to traffic.
The...
select all : clear all : add to favorites
results 1-3 of 3 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next