Chicago Public Library

   

 Español | Polski | 


 
Search results for North   
Refine your search
Photographer
Unknown (738)

Neighborhood
Loop (Chicago, Ill.) (737)
Michigan Avenue (Chica... (46)
Monroe Street (Chicago... (36)
Lake Shore Drive (Chic... (18)
Columbus Drive (Chicag... (11)
Randolph Street (Chica... (4)

Subject.TGM
Skyscrapers (493)
Lighting (336)
Trees (306)
Faces (232)
Hoisting Machinery (210)
Show more...

results 1-20 of 738 item(s)  page 1 of 37 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Jay Pritzker Pavilion, structural steel and formwork, July 17, 2002 Jay Pritzker Pavilion, structural steel and formwork, July 17, 2002 Automobiles; Hoisting machinery; Skyscrapers; Concrete; Construction workers; Looking north toward the construction site of the Jay Pritzker Pavilion as structural steel was erected and formwork was put in place prior to concrete being poured.

2. General construction, Chase Promenade North, July 19, 2004 General construction, Chase Promenade North, July 19, 2004 Benches; Trees; Lampposts; Generators; Looking northwest toward Chase Promenade North as set up begins for the inaugural gala, held on July 24, 2004.

3. Crown Fountain, view south from north tower, May 27, 2004 Crown Fountain, view south from north tower, May 27, 2004 Business people; Hoisting machinery; Structural systems A visitor from U.S. Equities Realty's Argentina location stands at the top of Crown Fountain's north tower.

4. Jay Pritzker Pavilion, glass doors and seating area, June 30, 2004 Jay Pritzker Pavilion, glass doors and seating area, June 30, 2004 Cantilever construction; Control rooms; Stages (Platforms); Chairs; Construction workers; Looking north across the seating area toward the glass doors of the stage.

5. Jay Pritzker Pavilion, glass doors, ca. March 10, 2004 Jay Pritzker Pavilion, glass doors, ca. March 10, 2004 Cantilever construction; Hoisting machinery; Construction workers; Construction equipment; Looking north at the stage doors and headdress of the Jay Pritzker Pavilion. The stage area can be closed off by two massive sliding glass doors between performances or to create an intimate indoor space...

6. Jay Pritzker Pavilion, partially-built cantilever, January 9, 2003 Jay Pritzker Pavilion, partially-built cantilever, January 9, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Concrete; Skyscrapers; Construction workers; Looking north toward the construction site and the partially-built cantilever.

7. Jay Pritzker Pavilion, structural steel for the headdress, August 10, 2003 Jay Pritzker Pavilion, structural steel for the headdress, August 10, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Skyscrapers; Looking north toward the structural steel for the Pavilion's headdress at the east side of the stage. Concrete columns, which will support the overhead trellis, are visible in the foreground. One Prudential...

8. Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Skyscrapers; Construction workers; Looking north toward the Pavilion, where structural steel for the headdress is visible. The first steel plates have been attached to the west wings and the underside of the headdress.

9. Jay Pritzker Pavilion, stage, April 28, 2004 Jay Pritzker Pavilion, stage, April 28, 2004 Cantilever construction; Hoisting machinery; Stages (Platforms); Construction workers; Control rooms; Looking north toward the Pavilion's stage and the surrounding headdress.

10. Jay Pritzker Pavilion, constructing the stage, ca. August 10, 2003 Jay Pritzker Pavilion, constructing the stage, ca. August 10, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Construction workers; Ceilings; Looking north toward the partially constructed stage. The wooden panels of the ceiling are partially visible and the innermost ribbons of the headdress can be seen.

11. Jay Pritzker Pavilion, partially-built cantilever, January 9, 2003 Jay Pritzker Pavilion, partially-built cantilever, January 9, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Construction workers; Concrete; Skyscrapers; Flags; Looking north toward the construction site and the partially-built cantilever.

12. Jay Pritzker Pavilion, installing steel panels, August 7, 2003 Jay Pritzker Pavilion, installing steel panels, August 7, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Skyscrapers; Looking north toward the Pavilion, where steel panels are being installed on the underside of the headdress.

13. Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Skyscrapers; Construction workers; Looking north toward the Pavilion, where structural steel for the headdress is visible. The first steel plates have been attached to the west wings and the underside of the headdress.

14. Jay Pritzker Pavilion, structural steel for the headdress, March 6, 2003 Jay Pritzker Pavilion, structural steel for the headdress, March 6, 2003 Cantilever construction; Scaffolding; Skyscrapers; Snow; Looking north toward newly installed structural steel for the Pavilion's headdress.

15. Jay Pritzker Pavilion, structural steel for the headdress, March 6, 2003 Jay Pritzker Pavilion, structural steel for the headdress, March 6, 2003 Cantilever construction; Scaffolding; Snow; Skyscrapers; Looking north toward newly installed structural steel for the Pavilion's headdress.

16. Jay Pritzker Pavilion, stage, April 28, 2004 Jay Pritzker Pavilion, stage, April 28, 2004 Cantilever construction; Stages (Platforms); Hoisting machinery; Control rooms; Looking north toward the Pavilion's stage and the surrounding headdress.

17. Crown Fountain, view of north tower, ca. February 4, 2004 Crown Fountain, view of north tower, ca. February 4, 2004 Computer graphics; Marks (Symbols); Skyscrapers; Close-up view of the LED panels installed on the north tower of Crown Fountain. A red circle drawn over the photograph calls attention to a gap between two of the LED panels.

18. Crown Fountain, view of north tower, ca. February 4, 2004 Crown Fountain, view of north tower, ca. February 4, 2004 Computer graphics; Marks (Symbols); Tents; Skyscrapers; Snow; Trailers; View of the north tower of Crown Fountain with all but the last LED panel installed. A red circle drawn over the photograph calls attention to a gap between two of the LED panels.

19. Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Computer graphics; Structural systems; Tents; Skyscrapers; A digitally-altered photograph of the structural steel and partially installed LED screen of the north tower of Crown Fountain.

20. Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Computer graphics; Structural systems; Tents; Trees; Skyscrapers; A digitally-altered photograph of the structural steel and partially installed LED screen of the north tower of Crown Fountain.
select all : clear all : add to favorites
results 1-20 of 738 item(s)  page 1 of 37 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next