Chicago Public Library

   

 Español | Polski | 


 
Search results for Level   
Refine your search
Photographer
Unknown (23)

Neighborhood
Loop (Chicago, Ill.) (23)
Columbus Drive (Chicag... (6)
Michigan Avenue (Chica... (2)
Randolph Street (Chica... (1)

Subject.TGM
Trees (14)
Construction Workers (11)
Concrete (9)
Skyscrapers (8)
Pedestals (7)
Show more...

results 1-20 of 23 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, fabrication, milling, April 21, 2003 Cloud Gate, fabrication, milling, April 21, 2003 Steel; Milling machines; Machine shops; Structural frames; Industrial facilities; A milling machine is used to remove excess material from a steel plate. In order for the steel plates forming the sculpture to fit together, the dimensions and curvature of each plate had to be exact to...

2. Cloud Gate, SBC Plaza, March 10, 2004 Cloud Gate, SBC Plaza, March 10, 2004 Concrete; I-beams; Bolts & nuts; Construction workers; Shovels; A worker uses a screed board to level wet concrete at the base of the sculpture.

3. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Concrete; Construction workers; Snow; Shovels; Trees; Lampposts; Workers level wet concrete over the rebar as it is pumped into SBC Plaza.

4. Cloud Gate, SBC Plaza, March 16, 2004 Cloud Gate, SBC Plaza, March 16, 2004 Concrete; Construction workers; Trees; Workers use various tools to level and smooth wet concrete at SBC Plaza.

5. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Looking north at terrace level above the site.

6. Crown Fountain, early site documentation, August 27, 2001 Crown Fountain, early site documentation, August 27, 2001 Trees; Skyscrapers; Lawns; Stairways; Looking northwest toward the site from terrace level. The Michigan Avenue street wall is visible in the background.

7. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Structural systems; Surveying equipment; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

8. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Pails; Chisels & mallets; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

9. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; A worker begins to build the surface of the reflecting pool. The surface is made of tiles of black, African granite that are 3 feet square and weigh around 250 pounds each. They sit almost 2 feet above...

10. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir. Getting the black granite tiles...

11. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches off the ground, creating a space for a reservoir of water just...

12. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Trucks; Skyscrapers; Concrete; Trees; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir, and the water for the reflecting...

13. Crown Fountain, pedestal, May 27, 2004 Crown Fountain, pedestal, May 27, 2004 Pedestals; Tiles; Concrete; A close up of a screw-jack pedestal holding up two of the black, African tiles that form the surface of Crown Fountain’s reflecting pool. Great care was taken by workers when installing these tiles because...

14. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Structural systems; Hoisting machinery; Construction workers; Pipes (Conduits); Concrete; I-beams; Trucks; Trailers; Skyscrapers; The north tower of Crown Fountain under construction. Each tower is 50 feet tall, 23 feet wide and 16 feet deep, separated by a 232 foot-long reflecting pool. At the bottom of this image the pipes that...

15. Jay Pritzker Pavilion, headdress, March 23, 2004 Jay Pritzker Pavilion, headdress, March 23, 2004 Cantilever construction; Construction equipment; Streets; Automobiles; An aerial view of the Jay Pritzker Pavilion’s headdress under construction. The finished stainless steel plates have been installed onto the ribbons of the headdress, or proscenium, and work continues...

16. BP Bridge, interior view of garage, May 9, 2003 BP Bridge, interior view of garage, May 9, 2003 Garages; Automobiles; Construction workers; Interior view of the garage below the projected path of the BP Bridge, as the support structure for the Bridge was installed at ground level.

17. BP Bridge, interior view of garage, June 6, 2003 BP Bridge, interior view of garage, June 6, 2003 Garages; Interior view of the garage below the projected path of the BP Bridge, as the support structure for the Bridge was installed at ground level.

18. BP Bridge, excavating Daley Bicentennial Plaza, June 18, 2003 BP Bridge, excavating Daley Bicentennial Plaza, June 18, 2003 Construction workers; Excavation; Close-up view of waterproofing uncovered when Daley Bicentennial Plaza was excavated. The Grant Park North Garage is located beneath the Daley Bicentennial Plaza. Because the Bridge's structure bears down...

19. BP Bridge, span, June 22, 2004 BP Bridge, span, June 22, 2004 Streets; Trees; Lawns; Looking east from ground level toward the span and concrete pier of the BP Bridge.

20. BP Bridge, span, June 22, 2004 BP Bridge, span, June 22, 2004 Streets; Trees; Stairways; Looking east from ground level toward the span and concrete pier of the BP Bridge.
select all : clear all : add to favorites
results 1-20 of 23 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next