Chicago Public Library

   

 Español | Polski | 


 
Search results for Last   
Refine your search
Photographer
Unknown (85)

Neighborhood
Loop (Chicago, Ill.) (85)
Michigan Avenue (Chica... (6)
Columbus Drive (Chicag... (5)
Monroe Street (Chicago... (5)

Subject.TGM
Construction Workers (54)
Skyscrapers (51)
Trees (34)
Hoisting Machinery (31)
Testing (28)
Show more...

results 1-20 of 85 item(s)  page 1 of 5 : ( <<  1  2  3  4  5  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, trial assembly in Oakland, California, steel plate, September 18, 2003 Cloud Gate, trial assembly in Oakland, California, steel plate, September 18, 2003 Steel; Dollies (Moving equipment); Hoisting machinery; Structural systems; Structural frames; An individual steel plate atop a cradle before its attachment to the structural steel during a trial assembly at Performance Structures, Inc. (PSI) in Oakland, California. PSI developed a procedure in...

2. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Tents; Flags The last remaining steel plate to be installed on the sculpture is hoisted into place by a crane.

3. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Construction workers; Tents; I-beams; Flags; Reflections; The last remaining steel plate to be installed on the sculpture is hoisted into place by a crane.

4. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Tents; Photographers; A photographer has climbed up the side of the tent for a better view of the last steel plate going into place on the sculpture.

5. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Construction workers; Tents; Flags; Reflections; Artist Anish Kapoor joins workers atop the sculpture as the last steel plate is fitted into place.

6. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Construction workers; Tents; Flags; Ethan Silva, president of Performance Structures, Inc. (PSI) (left), and artist Anish Kapoor (right) look on as a worker gestures to the crane operator, out of view, to lower the last plate into place....

7. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Hoisting machinery; Construction workers; Tents; I-beams; Flags; Reflections; Scaffolding; Close-up view of the last plate installed onto the sculpture.

8. Cloud Gate, attaching the final plate, June 28, 2004 Cloud Gate, attaching the final plate, June 28, 2004 Steel; Tents; Flags; Scaffolding; A United States flag sits atop the last plate installed onto the sculpture.

9. Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Industrial facilities; Structural frames; Fans (Machinery); Glass blocks; Construction workers Assembly of glass brick panels at Circle Redmont Inc., in Melbourne, Florida. The pink bricks were used during shipping to fill the empty spaces in the panels where the glass bricks were left out. The...

10. Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Industrial facilities; Construction workers; Structural frames; Fans (Machinery); Glass blocks; Assembly of glass brick panels at Circle Redmont Inc., in Melbourne, Florida. The pink bricks were used during shipping to fill the empty spaces in the panels where the glass bricks were left out. The...

11. Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Industrial facilities; Construction workers; Structural frames; Fans (Machinery); Glass blocks; Assembly of glass brick panels at Circle Redmont Inc., in Melbourne, Florida. The pink bricks were used during shipping to fill the empty spaces in the panels where the glass bricks were left out. The...

12. Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 17, 2004 Industrial facilities; Construction workers; Structural frames; Glass blocks; Fans (Machinery); Assembly of glass brick panels at Circle Redmont Inc., in Melbourne, Florida. The pink bricks were used during shipping to fill the empty spaces in the panels where the glass bricks were left out. The...

13. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

14. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

15. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

16. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

17. Crown Fountain, east perimeter of site, test of reservoir, March 4, 2004 Crown Fountain, east perimeter of site, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; Structural systems; Looking south along the east perimeter of the construction site during a test of the reservoir. The towers have been fitted with all but the last LED panels which will go behind the "gargoyle" nozzles....

18. Crown Fountain, south tower, test of reservoir, March 4, 2004 Crown Fountain, south tower, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction workers; Skyscrapers; Concrete; Reflections; Structural systems; Looking southwest toward the south tower during a test of the reservoir. The tower has been fitted with all but the last LED panel which will go behind the "gargoyle" nozzle. Buildings along South Michigan...

19. Crown Fountain, view of north tower, February 4, 2004 Crown Fountain, view of north tower, February 4, 2004 Structural systems; Skyscrapers; Trees; Lampposts; Hoisting machinery; Looking northeast toward the north tower of Crown Fountain. The Pritzker Pavilion and the Blue Cross-Blue Shield Tower are visible in the background. The north tower has been fitted with all but the last...

20. Crown Fountain, view of north tower, February 4, 2004 Crown Fountain, view of north tower, February 4, 2004 Tents; Skyscrapers; Trailers; Looking north toward the north tower of Crown Fountain. The north tower has been fitted with all but the last LED panel which will go behind the gargoyle nozzle.
select all : clear all : add to favorites
results 1-20 of 85 item(s)  page 1 of 5 : ( <<  1  2  3  4  5  >> ) :: previous : next