Chicago Public Library

   

 Español | Polski | 


 
Search results for is   
Refine your search
Photographer
Unknown (1355)

Neighborhood
Loop (Chicago, Ill.) (1354)
Columbus Drive (Chicag... (93)
Monroe Street (Chicago... (91)
Michigan Avenue (Chica... (81)
Lake Shore Drive (Chic... (29)
Show more...

Subject.TGM
Skyscrapers (713)
Hoisting Machinery (468)
Construction Workers (444)
Trees (443)
Lighting (429)
Show more...

results 81-100 of 1355 item(s)  page 5 of 68 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

81. Jay Pritzker Pavilion, pouring concrete, December 19, 2001 Jay Pritzker Pavilion, pouring concrete, December 19, 2001 Construction workers; Concrete; Skyscrapers; Ladders; In spite of rainy weather, workers pour concrete into formwork for a wall. Green rebar, or reinforcing bar, is visible nearby.

82. Cloud Gate, attaching steel plates, March 21, 2004 Cloud Gate, attaching steel plates, March 21, 2004 Construction workers; Dollies (Moving equipment); Hoisting machinery; Trucks; Ladders; Two workers prepare to unload a wrapped steel plate from a truck. The trellis of Pritzker Pavilion is visible in the background.

83. BP Bridge, excavating Daley Bicentennial Plaza, June 18, 2003 BP Bridge, excavating Daley Bicentennial Plaza, June 18, 2003 Construction workers; Excavation; Close-up view of waterproofing uncovered when Daley Bicentennial Plaza was excavated. The Grant Park North Garage is located beneath the Daley Bicentennial Plaza. Because the Bridge's structure bears down...

84. Crown Fountain, north tower, May 20, 2004 Crown Fountain, north tower, May 20, 2004 Construction workers; Faces; Lighting; Hoisting machinery; Glass blocks; Structural frames; Rest periods; Trailers; Skyscrapers; Trees; Looking north toward the north tower of Crown Fountain during construction. The image of a face is visible on the LED screen. The south tower is visible to the right.

85. BP Bridge, concrete foundation ramp, September 12, 2003 BP Bridge, concrete foundation ramp, September 12, 2003 Construction workers; Flags; Trees; Skyscrapers; Looking southwest toward the concrete foundation ramp during construction. A worker adjusts a temporary flag pole displaying a United States flag and a Minnesota Vikings flag. The top of the CNA Center...

86. Jay Pritzker Pavilion, formwork, March 4, 2004 Jay Pritzker Pavilion, formwork, March 4, 2004 Construction workers; Hoisting machinery; Formwork along the eastern edge of the site. The BP Bridge is visible in the background.

87. Cloud Gate, attaching steel plates, steel plate, March 29, 2004 Cloud Gate, attaching steel plates, steel plate, March 29, 2004 Construction workers; Hoisting machinery; Dollies (Moving equipment); Steel; Workers guide a steel plate and cradle as it is lifted by a crane.

88. Jay Pritzker Pavilion, construction of Great Lawn, October 17, 2003 Jay Pritzker Pavilion, construction of Great Lawn, October 17, 2003 Construction workers; Hoisting machinery; Scaffolding; Skyscrapers; Construction equipment Workers add layers of green roofing material to the future site of the Great Lawn. Built atop two stories of parking garages and railroad tracks, Millennium Park is one of the largest intensive green roofs...

89. Jay Pritzker Pavilion, construction of Great Lawn, October 17, 2003 Jay Pritzker Pavilion, construction of Great Lawn, October 17, 2003 Construction workers; Hoisting machinery; Scaffolding; Skyscrapers; Construction equipment With the trellis in place, workers begin constructing the Great Lawn. Built atop two stories of parking garages and railroad tracks, Millennium Park, at 24 ½ acres, is one of the largest green roofs in...

90. Jay Pritzker Pavilion, headdress and trellis, November 12, 2003 Jay Pritzker Pavilion, headdress and trellis, November 12, 2003 Construction workers; Hoisting machinery; Skyscrapers; Cantilever construction; Looking west toward the headdress and trellis of the Pavilion. The BP Bridge is visible in the foreground.

91. Jay Pritzker Pavilion, headdress and trellis, November 12, 2003 Jay Pritzker Pavilion, headdress and trellis, November 12, 2003 Construction workers; Hoisting machinery; Skyscrapers; Cantilever construction; Looking west toward the headdress and trellis of the Pavilion. The BP Bridge is visible in the foreground.

92. BP Bridge, installing the shingles, March 22, 2004 BP Bridge, installing the shingles, March 22, 2004 Construction workers; Ladders; Less than four months before the opening of Millennium Park, workers continue to install the stainless steel shingles, or “scales” onto the paneling over the subframe of the Bridge. Protected by a...

93. Jay Pritzker Pavilion, assembling the trellis, April 21, 2003 Jay Pritzker Pavilion, assembling the trellis, April 21, 2003 Construction workers; Ladders; Sawhorses; Skyscrapers; Beginning to assemble the trellis. The Michigan Avenue street wall is visible in the background.

94. BP Bridge, installing the shingles, March 22, 2004 BP Bridge, installing the shingles, March 22, 2004 Construction workers; Ladders; Scaffolding; Skyscrapers; A worker installs stainless steel shingles, or "scales", on a curve of the BP Bridge. The headdress of the Jay Pritzker Pavilion is visible in the background.

95. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Pipes (Conduits); Trees; Skyscrapers; Project team members view a test pattern on the south tower's newly installed LED screen. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The Michigan Avenue street wall is visible...

96. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Retaining walls; Construction equipment; Trees; Skyscrapers; Looking south toward the newly-installed LED screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The partially-installed reflecting...

97. Crown Fountain, LED screen test in pink, south tower, April 1, 2004 Crown Fountain, LED screen test in pink, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Skyscrapers; A project team member views the south tower's newly installed LED screen, as it is lit in pink. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed.

98. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Trees; Skyscrapers; Looking south toward the newly-installed LED screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The Michigan Avenue street wall...

99. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Pipes (Conduits); Retaining walls; Pedestals; Trees; Close-up view of the base of the south tower as a project team member views it from the side. The tower's LED screen is lit up in a test pattern.

100. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Retaining walls; Automobiles; Pipes (Conduits); Trees; Skyscrapers; The newly installed light-emitting diode (LED) screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The partially-installed reflecting...
select all : clear all : add to favorites
results 81-100 of 1355 item(s)  page 5 of 68 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next