Chicago Public Library

   

 Español | Polski | 


 
Search results for Inside   
Refine your search
Photographer
Unknown (78)

Neighborhood
Loop (Chicago, Ill.) (78)

Subject.TGM
Construction Workers (36)
Steel (31)
Tents (31)
Structural Systems (22)
Hoisting Machinery (21)
Show more...

results 1-20 of 78 item(s)  page 1 of 4 : ( <<  1  2  3  4  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, water feature tests, ca. November 5, 2002 Crown Fountain, water feature tests, ca. November 5, 2002 Airplane cockpits; Airplanes; Hangars; Jaume Plensa (right) inside the Crown family's private plane while traveling to Concord, Ontario, Canada to view fountain tests at the headquarters of Crystal Fountains.

2. Crown Fountain, water feature tests, ca. November 5, 2002 Crown Fountain, water feature tests, ca. November 5, 2002 Airplane cockpits; Airplanes; Hangars; Jaume Plensa (right) inside the Crown family's private plane while traveling to Concord, Ontario, Canada to view fountain tests at the headquarters of Crystal Fountains.

3. Crown Fountain, architectural model, ca. October 4, 2002 Crown Fountain, architectural model, ca. October 4, 2002 Architectural models; Structural systems; Fountains; A model of one of Crown Fountain’s towers, showing the internal structure. Each tower is 50 feet tall, with a rectangular footprint of 23 feet by 16 feet. Inside each tower is a basic structure with...

4. Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Bolts & nuts; Close-up view of structural steel inside the Pavilion's headdress.

5. Crown Fountain, structural steel, April 1, 2004 Crown Fountain, structural steel, April 1, 2004 Construction workers; Structural systems; Marks (Symbols); Looking west toward the structural steel and workers inside the south tower of Crown Fountain.

6. General construction, landscaping materials, June 1, 2004 General construction, landscaping materials, June 1, 2004 Construction workers; Trees; Inside Millennium Park, young trees are transported to the sites where they will be planted using construction equipment.

7. Crown Fountain, construction of underground control rooms, January 6, 2004 Crown Fountain, construction of underground control rooms, January 6, 2004 Control rooms; Electrical apparatus; Electrical panels and controls inside an underground control room.

8. Crown Fountain, ventilation equipment, underground control rooms, February 4, 2004 Crown Fountain, ventilation equipment, underground control rooms, February 4, 2004 Control rooms; Ventilation Ventilation equipment inside one of Crown Fountain's underground control rooms during construction.

9. Crown Fountain, ventilation equipment, underground control rooms, February 4, 2004 Crown Fountain, ventilation equipment, underground control rooms, February 4, 2004 Control rooms; Ventilation Ventilation equipment inside one of Crown Fountain's underground control rooms during construction.

10. Crown Fountain, ventilation equipment, underground control rooms, February 4, 2004 Crown Fountain, ventilation equipment, underground control rooms, February 4, 2004 Control rooms; Ventilation; Fans (Machinery) Ventilation equipment inside one of Crown Fountain's underground control rooms during construction.

11. Jay Pritzker Pavilion, electrical controls, November 14, 2003 Jay Pritzker Pavilion, electrical controls, November 14, 2003 Electrical apparatus; Scaffolding; Electrical theater controls inside the Pavilion's headdress.

12. Cloud Gate, attaching steel plates, June 10, 2004 Cloud Gate, attaching steel plates, June 10, 2004 Engineering drawings; An engineering drawing for the sculpture is displayed inside the weatherproof tent.

13. Cloud Gate, attaching steel plates, June 10, 2004 Cloud Gate, attaching steel plates, June 10, 2004 Engineering drawings; An engineering drawing for the sculpture is displayed inside the weatherproof tent.

14. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Structural systems; Tents; Construction equipment; Concrete; Fire extinguishers; Formwork constructed around the base of one of the towers inside the weatherproof tent that was erected over part of the site so that work could continue in cold weather.

15. BP Bridge, spanning Columbus Drive, ca. November 22, 2003 BP Bridge, spanning Columbus Drive, ca. November 22, 2003 Girders; Construction workers; Skyscrapers; A worker joins two box girders together from inside, forming part of BP Bridge's span. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's...

16. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Construction workers; A worker prepares to weld two box girders together from inside. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

17. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Welding; Construction workers; Scaffolding; A worker welds two box girders together from inside. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

18. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Welding; Construction workers; Scaffolding; A worker welds two box girders together from inside. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

19. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Welding; Construction workers; Scaffolding; A worker welds two box girders together from inside. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

20. Crown Fountain, Jaume Plensa and Mark Sexton visit the site, April 6, 2004 Crown Fountain, Jaume Plensa and Mark Sexton visit the site, April 6, 2004 Glass blocks; Structural frames; Construction workers; Ladders; Tiles; Trailers; Skyscrapers; Artist Jaume Plensa (left) and architect Mark Sexton view the north tower during Crown Fountain’s construction. The north tower has been fitted with all but the last LED panel which will go behind the...
select all : clear all : add to favorites
results 1-20 of 78 item(s)  page 1 of 4 : ( <<  1  2  3  4  >> ) :: previous : next