Chicago Public Library

   

 Español | Polski | 


 
Search results for Huge   
Refine your search
Subject.TGM
Hoisting Machinery (3)
Skyscrapers (3)
Scaffolding (2)
Streets (2)
Construction Workers (2)
Show more...

Photographer
Unknown (3)

Neighborhood
Loop (Chicago, Ill.) (3)
Columbus Drive (Chicag... (2)

results 1-3 of 3 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Hoisting machinery; Cantilever construction; I-beams; Skyscrapers; View from below of the steel I-beams forming the skeletal structure of the Pavilion’s roof. In designing the stage area, Frank Gehry took great care to ensure that the sense of intimacy enjoyed by those...

2. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...

3. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Construction workers; Hoisting machinery; Streets; Scaffolding; Skyscrapers; Fog; The final box girder is lowered into place by a crane as Columbus Drive is closed to traffic for a 12-hour period.
The structural steel for the Bridge was made by Littell Steel of Pittsburgh, Pennsylvania,...
select all : clear all : add to favorites
results 1-3 of 3 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next