Chicago Public Library

   

 Español | Polski | 


 
Search results for During   
Refine your search
Photographer
Unknown (778)

Neighborhood
Loop (Chicago, Ill.) (778)
Columbus Drive (Chicag... (41)
Monroe Street (Chicago... (17)
Lake Shore Drive (Chic... (13)
Randolph Street (Chica... (13)
Show more...

Subject.TGM
Skyscrapers (225)
Construction Workers (201)
Lighting (191)
Hoisting Machinery (148)
Testing (139)
Trees (133)
Faces (128)
Structural Frames (124)
Scaffolding (116)
Glass Blocks (104)

results 1-20 of 778 item(s)  page 1 of 39 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. BP Bridge, concrete foundation ramp, September 12, 2003 BP Bridge, concrete foundation ramp, September 12, 2003 Close-up view of part of the concrete foundation ramp during construction.

2. BP Bridge, concrete foundation ramp, September 12, 2003 BP Bridge, concrete foundation ramp, September 12, 2003 Close-up view of part of the concrete foundation ramp during construction.

3. BP Bridge, concrete foundation ramp, September 12, 2003 BP Bridge, concrete foundation ramp, September 12, 2003 Close-up view of part of the concrete foundation ramp and the surrounding landscaping during construction.

4. Jay Pritzker Pavilion, close-up view of stainless steel, August 7, 2003 Jay Pritzker Pavilion, close-up view of stainless steel, August 7, 2003 Close-up view of stainless steel panels during construction of the Pavilion's headdress.

5. Jay Pritzker Pavilion, close-up view of stainless steel panels with blue plastic covering, August 7, Jay Pritzker Pavilion, close-up view of stainless steel panels with blue plastic covering, August 7, 2003 Close-up view of stainless steel panels with a protective blue plastic covering during construction of the Pavilion's headdress.

6. Crown Fountain, meeting in Chicago, May 13, 2002 Crown Fountain, meeting in Chicago, May 13, 2002 Alleys; Architects' offices; Steve Crown, representing the Crown family, Alan Schachtman of U.S. Equities Realty, artist Jaume Plensa, architect Mark Sexton of Krueck + Sexton Architects, and others in the alley behind the offices...

7. Crown Fountain, meeting in Chicago, May 13, 2002 Crown Fountain, meeting in Chicago, May 13, 2002 Alleys; Glass blocks; Lighting; Architects' offices; Faces; Glass brick panels in front of LED displays show a range of possibilities for the fountain during the first LED test for the project.

8. Crown Fountain, meeting in Chicago, ca. April 10, 2002 Crown Fountain, meeting in Chicago, ca. April 10, 2002 Architects' offices; An LED test panel during an early meeting at the offices of Krueck + Sexton Architects at 221 West Erie Street in Chicago.

9. Jay Pritzker Pavilion, materials on-site, April 24, 2003 Jay Pritzker Pavilion, materials on-site, April 24, 2003 Automobiles; Construction workers; Skyscrapers; Construction equipment; Pipes for the trellis and other building materials on-site during construction of the Pavilion

10. Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 22, 2003 Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 22, 2003 Bolts & nuts; Structural systems; I-beams; Close-up view of a bolt connecting one of the large rings of the structural steel of the sculpture to an I-beam formation at its base during the trial assembly at PSI in Oakland, California.

11. Crown Fountain, LED screen test, April 28, 2004 Crown Fountain, LED screen test, April 28, 2004 Business people; I-beams; Project superintendent Chris Smith (left front) and Herb Dawson (right) of W.E. O’Neil Construction Company and Roark Frankel of U.S. Equities Realty (center) on site during an LED screen test.

12. Jay Pritzker Pavilion, side view with cantilever, January 9, 2003 Jay Pritzker Pavilion, side view with cantilever, January 9, 2003 Cantilever construction; Concrete; Hoisting machinery; Construction workers; Skyscrapers; Scaffolding; Looking west toward the Pavilion during the cantilever's construction. A concrete pylon for support of the trellis is visible in the foreground. The tops of several tall buildings can be seen in the background,...

13. Jay Pritzker Pavilion, glass doors, ca. March 10, 2004 Jay Pritzker Pavilion, glass doors, ca. March 10, 2004 Cantilever construction; Hoisting machinery; Construction workers; Construction equipment; Looking north at the stage doors and headdress of the Jay Pritzker Pavilion. The stage area can be closed off by two massive sliding glass doors between performances or to create an intimate indoor space...

14. Jay Pritzker Pavilion, stage with glass doors, March 4, 2004 Jay Pritzker Pavilion, stage with glass doors, March 4, 2004 Cantilever construction; Hoisting machinery; Construction workers; Scaffolding; Looking toward the stage, glass doors and headdress of the Pavilion during construction.

15. Jay Pritzker Pavilion, view with steel panels, May 13, 2003 Jay Pritzker Pavilion, view with steel panels, May 13, 2003 Cantilever construction; Hoisting machinery; Scaffolding; View of newly installed steel panels on the underside of the headdress during construction.

16. Jay Pritzker Pavilion, constructing the trellis and headdress, October 17, 2003 Jay Pritzker Pavilion, constructing the trellis and headdress, October 17, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Skyscrapers; Looking northeast toward the trellis and headdress of the Pavilion during construction.

17. Jay Pritzker Pavilion, cantilever and scaffolding, January 9, 2003 Jay Pritzker Pavilion, cantilever and scaffolding, January 9, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Skyscrapers; Side view of the cantilever from below during its construction. Green scaffolding is visible supporting the cantilever.

18. Jay Pritzker Pavilion, cantilever, April 24, 2003 Jay Pritzker Pavilion, cantilever, April 24, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Skyscrapers; Concrete; Looking northeast toward the cantilever and scaffolding during construction. Yellow piping was assembled nearby as construction of the trellis was beginning.

19. Jay Pritzker Pavilion, constructing the ceiling, November 14, 2003 Jay Pritzker Pavilion, constructing the ceiling, November 14, 2003 Ceilings; Close-up view of the wooden ceiling during construction. The smaller circles in the wood are for the acoustics on stage.

20. Jay Pritzker Pavilion, constructing the ceiling, November 14, 2003 Jay Pritzker Pavilion, constructing the ceiling, November 14, 2003 Ceilings; Close-up view of the wooden ceiling during construction. The circular openings in the wood are for the acoustics on stage.
select all : clear all : add to favorites
results 1-20 of 778 item(s)  page 1 of 39 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next