Chicago Public Library

   

 Español | Polski | 


 
Search results for Before   
Refine your search
Photographer
Unknown (270)

Neighborhood
Loop (Chicago, Ill.) (270)
Columbus Drive (Chicag... (12)
Michigan Avenue (Chica... (6)
Randolph Street (Chica... (3)
Monroe Street (Chicago... (2)
Show more...

Subject.TGM
Construction Workers (89)
Concrete (87)
I-beams (74)
Bolts & Nuts (71)
Skyscrapers (69)
Hoisting Machinery (57)
Trees (55)
Structural Systems (43)
Steel (39)
Construction Equipment (32)

results 1-20 of 270 item(s)  page 1 of 14 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. BP Bridge, aerial view during construction, ca. December 3, 2003 BP Bridge, aerial view during construction, ca. December 3, 2003 Streets; Tennis courts; Automobiles; Construction equipment; Structural frames; Boxes; An aerial view of the BP Bridge under construction. Taken in December 2003, seven months before Millennium Park opened, the span across Columbus Drive is in place and the substructure for the stainless...

2. BP Bridge, aerial view during construction, ca. May 15, 2004 BP Bridge, aerial view during construction, ca. May 15, 2004 Streets; Automobiles; Trucks; Trees; Tennis courts; Hoisting machinery; An aerial view of the BP Bridge designed by architect Frank Gehry, taken a week before the dedication, showing all of its sinuous curves. As Roark Frankel, vice president of US Equities Realty, said, “I...

3. BP Bridge, aerial view during construction, March 11, 2004 BP Bridge, aerial view during construction, March 11, 2004 Streets; Automobiles; Structural frames; Tennis courts; Trees; Construction equipment; Scaffolding; An aerial view of the BP Bridge under construction less than three months before its completion. In this photograph most of the stainless steel shingles have been installed and part of the Pau Lope deck...

4. BP Bridge, filling in Daley Bicentennial Plaza, March 22, 2004 BP Bridge, filling in Daley Bicentennial Plaza, March 22, 2004 Excavation; Dirt; Trailers; Ladders; View of the area adjacent to the BP Bridge before it was filled in with landscaping materials. Stainless steel shingles or "scales" on the Bridge are visible in the foreground at right.

5. BP Bridge, installing the shingles, March 22, 2004 BP Bridge, installing the shingles, March 22, 2004 Construction workers; Ladders; Less than four months before the opening of Millennium Park, workers continue to install the stainless steel shingles, or “scales” onto the paneling over the subframe of the Bridge. Protected by a...

6. BP Bridge, installing the subframing, February 13, 2004 BP Bridge, installing the subframing, February 13, 2004 Construction workers; Structural frames; Snow; A worker holds a piece of the subframing for the stainless steel shingles before it was installed onto the BP Bridge.

7. BP Bridge, landscaping, March 16, 2004 BP Bridge, landscaping, March 16, 2004 Construction equipment; Skyscrapers; Pipes (Conduits); View of part of the BP Bridge and the area nearby before it was filled in with landscaping materials. Stainless steel shingles or "scales" are visible on the side of the Bridge.

8. BP Bridge, landscaping, March 16, 2004 BP Bridge, landscaping, March 16, 2004 Pipes (Conduits); Skyscrapers; View of part of the BP Bridge and the adjacent area before it was filled in with landscaping materials. Stainless steel shingles or "scales" are visible on the side of the Bridge. The area on the Bridge...

9. BP Bridge, rebar for western approach span, October 13, 2003 BP Bridge, rebar for western approach span, October 13, 2003 Structural frames; Skyscrapers; Trailers; Construction workers; Streets; Rebar is visible on the western approach span of BP Bridge, before it was cast in concrete. Subframing for the stainless steel shingles, or "scales", is visible to the left. The trellis of Pritzker Pavilion,...

10. BP Bridge, rebar for western approach span, October 13, 2003 BP Bridge, rebar for western approach span, October 13, 2003 Skyscrapers; Trees; Rebar and structural steel are visible on the western approach span of BP Bridge, before it was cast in concrete. The top of Lake Point Tower is visible in the background.

11. BP Bridge, rebar, concrete foundation ramp, September 12, 2003 BP Bridge, rebar, concrete foundation ramp, September 12, 2003 Construction workers; Looking east toward Daley Bicentennial Plaza as the construction of the BP Bridge continues. Here, reinforcing bar, or rebar, is in place before a top layer of concrete is added.

12. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Scaffolding; Girders; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

13. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Girders; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

14. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...

15. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Girders; Scaffolding; Skyscrapers; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

16. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Girders; Streets; Scaffolding; Skyscrapers; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

17. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Construction workers; Welding; Streets; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

18. BP Bridge, structural steel, November 12, 2003 BP Bridge, structural steel, November 12, 2003 Streets; Trees; Skyscrapers; Surveying equipment; Looking west toward the structural steel of the approach spans of BP Bridge, before the center span was added. Lightweight poly-foam blocks, visible at right, were used to to fill in the landscape surrounding...

19. BP Bridge, structural steel, November 12, 2003 BP Bridge, structural steel, November 12, 2003 Streets; Surveying equipment; Skyscrapers; View of the western approach span taken from the eastern approach span of BP Bridge before the center span was added. Some of the stainless steel shingles, or "scales" have been installed on the Bridge...

20. Cloud Gate, anchoring system, March 10, 2004 Cloud Gate, anchoring system, March 10, 2004 Concrete; Bolts & nuts; Close-up view of part of the sculpture's anchoring system before it was encased in concrete.
select all : clear all : add to favorites
results 1-20 of 270 item(s)  page 1 of 14 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next