Chicago Public Library

   

 Español | Polski | 


 
Search results for Before   
Refine your search
Photographer
Unknown (270)

Neighborhood
Loop (Chicago, Ill.) (270)
Columbus Drive (Chicag... (12)
Michigan Avenue (Chica... (6)
Randolph Street (Chica... (3)
Monroe Street (Chicago... (2)
Show more...

Subject.TGM
Construction Workers (89)
Concrete (87)
I-beams (74)
Bolts & Nuts (71)
Skyscrapers (69)
Show more...

results 1-20 of 270 item(s)  page 1 of 14 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, south tower, fountain preview, July 13, 2004 Crown Fountain, south tower, fountain preview, July 13, 2004 Fountains; Lighting; Faces; Children; Reflecting pools; Reflections; A child plays in the reflecting pool during a preview of the fountain three days before the official opening of Millennium Park. The north tower is visible in the background.

2. Crown Fountain, fountain preview, July 13, 2004 Crown Fountain, fountain preview, July 13, 2004 Fountains; Children; Mouths; Lighting; Reflecting pools; Reflections; Skyscrapers; A child strides across the reflecting pool during a preview of Crown Fountain three days before the official opening of Millennium Park. The north tower is visible in the background.

3. Jay Pritzker Pavilion, constructing the trellis, June 19, 2003 Jay Pritzker Pavilion, constructing the trellis, June 19, 2003 Scaffolding; Skyscrapers; Construction workers; A close-up view of part of the trellis before it was installed over the Great Lawn. Inkeeping with Frank Gehry’s distinctive style, the trellis that spans the Great Lawn is not only attractive and adds...

4. Cloud Gate, transportation study, damaged tree, ca. August 21, 2002 Cloud Gate, transportation study, damaged tree, ca. August 21, 2002 Trees; Bark A damaged tree trunk. A plan was in place to photograph everything in the proposed path of the sculpture before the move, to document any damages resulting from the move. This is one of a series of photographs...

5. Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 24, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 24, 2003 Scaffolding; Hoisting machinery; A piece of the headdress's structural steel before it was installed.

6. Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Cantilever construction; Scaffolding; Skyscrapers; A piece of the headdress's structural steel before it was installed.

7. Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Scaffolding; Hoisting machinery; A piece of the headdress's structural steel before it was installed.

8. Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Scaffolding; Hoisting machinery; Skyscrapers; A piece of the headdress's structural steel before it was installed.

9. Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 17, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 17, 2003 Scaffolding; Hoisting machinery; A piece of the headdress's structural steel before it was installed. A concrete column, which will support the overhead trellis, is visible in the background.

10. Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Hoisting machinery; Skyscrapers; A piece of the headdress's structural steel before it was installed. Concrete columns, which will support the overhead trellis, are visible in the background.

11. Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 24, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 24, 2003 Skyscrapers; Construction workers; A piece of the headdress's structural steel before it was installed. The Michigan Avenue street wall is visible in the background.

12. Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 24, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, April 24, 2003 Hoisting machinery; Skyscrapers; Ladders; A piece of the headdress's structural steel before it was installed. The Michigan Avenue street wall is visible in the background.

13. Crown Fountain, assembly in Melbourne, Florida, ca. November 14, 2003 Crown Fountain, assembly in Melbourne, Florida, ca. November 14, 2003 Industrial facilities; Structural frames; A stack of steel grids fabricated by Circle Redmont Inc., in Melbourne, Florida, before glass bricks were added. Circle Redmont fabricated 5 feet-by-16 feet and 5 feet-by-23 feet stainless steel grids...

14. Crown Fountain, assembly in Melbourne, Florida, ca. October 31, 2003 Crown Fountain, assembly in Melbourne, Florida, ca. October 31, 2003 Industrial facilities; Structural frames; A steel grid fabricated by Circle Redmont Inc., in Melbourne, Florida, before glass bricks were inserted into the openings. Circle Redmont fabricated 5 feet-by-16 feet and 5 feet-by-23 feet stainless steel...

15. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

16. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

17. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

18. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

19. Jay Pritzker Pavilion, lights and speakers, May 27, 2004 Jay Pritzker Pavilion, lights and speakers, May 27, 2004 Cantilever construction; A view showing where the trellis connects with the headdress of the Jay Pritzker Pavilion. Taken around six weeks before Millennium Park opened to the public, this photograph shows where the trellis and...

20. BP Bridge, installing the subframing, February 13, 2004 BP Bridge, installing the subframing, February 13, 2004 Construction workers; Structural frames; Snow; A worker holds a piece of the subframing for the stainless steel shingles before it was installed onto the BP Bridge.
select all : clear all : add to favorites
results 1-20 of 270 item(s)  page 1 of 14 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next