Chicago Public Library

   

 Español | Polski | 


 
Search results for Because   
Refine your search
Photographer
Unknown (14)

Neighborhood
Loop (Chicago, Ill.) (14)

Subject.TGM
Construction Workers (8)
Pedestals (6)
Skyscrapers (5)
Tiles (5)
Pails (5)
Show more...

results 1-14 of 14 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, attaching steel plates, April 29, 2004 Cloud Gate, attaching steel plates, April 29, 2004 Steel; Construction workers; Structural systems; Trusses; Tents; Project supervisor Nick Taylor (left) of Performance Structures, Inc. (PSI) adjusts a steel plate as it is attached to the sculpture. Nick Taylor was the only representative from Performance Structures,...

2. Cloud Gate, test weld, May 18, 2004 Cloud Gate, test weld, May 18, 2004 Steel; Welding; Close-up view of a test weld. Test welding was done in part for color matching, because material is added during welding.

3. Crown Fountain, glass brick sample, April 30, 2003 Crown Fountain, glass brick sample, April 30, 2003 Glass blocks; Offices; Desks; Chairs; A corner brick sample viewed from three feet away. Other glass brick samples are visible in the background. The glass bricks were used with steel grids to create the exterior walls of the towers of Crown...

4. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass blocks; Glassware; Shelving; Merchandise displays; Paneling; A glass brick in the center of shelves of objects produced by L.E. Smith Glass Company. The project team had precise specifications for the size and color of the glass bricks, and clarity was necessary...

5. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Structural systems; Surveying equipment; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

6. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Pails; Chisels & mallets; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

7. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir. Getting the black granite tiles...

8. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches off the ground, creating a space for a reservoir of water just...

9. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Trucks; Skyscrapers; Concrete; Trees; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir, and the water for the reflecting...

10. Crown Fountain, pedestal, May 27, 2004 Crown Fountain, pedestal, May 27, 2004 Pedestals; Tiles; Concrete; A close up of a screw-jack pedestal holding up two of the black, African tiles that form the surface of Crown Fountain’s reflecting pool. Great care was taken by workers when installing these tiles because...

11. Jay Pritzker Pavilion, installing structural steel for the headdress, May 13, 2003 Jay Pritzker Pavilion, installing structural steel for the headdress, May 13, 2003 Cantilever construction; Hoisting machinery; View from below of structural steel for the headdress being installed. Great skill was necessary to build the headdress: not only were there no straight lines to follow on from, but also because the builders...

12. BP Bridge, excavating Daley Bicentennial Plaza, June 18, 2003 BP Bridge, excavating Daley Bicentennial Plaza, June 18, 2003 Construction workers; Excavation; Close-up view of waterproofing uncovered when Daley Bicentennial Plaza was excavated. The Grant Park North Garage is located beneath the Daley Bicentennial Plaza. Because the Bridge's structure bears down...

13. BP Bridge, structural steel, November 12, 2003 BP Bridge, structural steel, November 12, 2003 Construction workers; Ladders; Surveying equipment; Skyscrapers; Work continues on the eastern approach ramp of the BP Bridge as the subframing for the stainless steel shingles transforms the structure to look like a rollercoaster! As was the case for constructing the...

14. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Construction workers; Girders; The central box girder is lowered into place on top of a central concrete pier in the median strip of Columbus Drive during a 12-hour period when the busy six-lane road was closed to traffic.
The...
select all : clear all : add to favorites
results 1-14 of 14 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next