Chicago Public Library

   

 Español | Polski | 


 
Search results for Back   
Refine your search
Photographer
Unknown (45)

Neighborhood
Loop (Chicago, Ill.) (45)
Columbus Drive (Chicag... (1)
Randolph Street (Chica... (1)

Subject.TGM
Construction Workers (16)
Hoisting Machinery (15)
Structural Systems (12)
Skyscrapers (11)
Scaffolding (9)
Show more...

results 21-40 of 45 item(s)  page 2 of 3 : ( <<  1  2  3  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

21. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Structural systems; Office buildings; Concrete; Fences; Back view of a full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system....

22. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Structural systems; Construction workers; Structural steel at the back of the north tower during the installation of LED panels.

23. Crown Fountain, installing a tie back, April 5, 2004 Crown Fountain, installing a tie back, April 5, 2004 Structural systems; Construction workers; Fasteners; Pipes (Conduits); Pedestals; Installing one of the tie backs that provide support for the panels of glass bricks that form the tower's exterior.

24. Crown Fountain, installing a tie back, April 5, 2004 Crown Fountain, installing a tie back, April 5, 2004 Structural systems; Construction workers; Fasteners Installing one of the tie backs that provide support for the panels of glass bricks that form the tower's exterior.

25. Crown Fountain, chemical feed for water treatment, February 4, 2004 Crown Fountain, chemical feed for water treatment, February 4, 2004 Control rooms; Equipment used for water treatment in Crown Fountain's pump room. After water travels through the fountain and is gathered in the reservoir, it travels through sand filters, strainers, and then chemicals...

26. Crown Fountain, north tower, white exterior lighting, June 28, 2004 Crown Fountain, north tower, white exterior lighting, June 28, 2004 Fountains; Lighting; Reflecting pools; Reflections; Skyscrapers; Looking toward the back of the north tower at night, as it was lit up in white during a preview of the fountain. Water is visible cascading from the sides of the tower.

27. Crown Fountain, north tower, white exterior lighting, June 28, 2004 Crown Fountain, north tower, white exterior lighting, June 28, 2004 Fountains; Lighting; Reflecting pools; Reflections; Skyscrapers; Looking toward the back of the north tower at night, as it was lit up in white during a preview of the fountain. Water is visible cascading from the sides of the tower.

28. Crown Fountain, south tower, July 23, 2004 Crown Fountain, south tower, July 23, 2004 Fountains; Reflecting pools; Crowds; Skyscrapers; Trees; Hoisting machinery; Looking toward the back of the south tower. The Smurfit-Stone Building and Two Prudential Plaza are visible in the background.

29. Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Hoisting machinery; Cantilever construction; I-beams; Skyscrapers; View from below of the steel I-beams forming the skeletal structure of the Pavilion’s roof. In designing the stage area, Frank Gehry took great care to ensure that the sense of intimacy enjoyed by those...

30. Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Jay Pritzker Pavilion, steel skeleton, ca. August 26, 2002 Hoisting machinery; Construction workers; Skyscrapers; Concrete; Cantilever construction; Looking northeast toward the construction site as the steel skeleton of the Pavilion takes shape. The Jay Pritzker Pavilion shares some common space with its neighbor to the north, the Joan W. and Irving...

31. Jay Pritzker Pavilion, formwork and rebar, ca. December 6, 2002 Jay Pritzker Pavilion, formwork and rebar, ca. December 6, 2002 Concrete; Construction workers; Hoisting machinery; Looking southwest toward the back of the Pavilion during its construction. Formwork and rebar are visible where concrete had not yet been cast.

32. Jay Pritzker Pavilion, rear view with bundles of rebar, ca. January 9, 2003 Jay Pritzker Pavilion, rear view with bundles of rebar, ca. January 9, 2003 Concrete; Hoisting machinery; Ladders; Looking southeast toward the back of the Pavilion during its construction. Steel rebar, or reinforcing bar, is lined up in bundles alongside the Pavilion.

33. Jay Pritzker Pavilion, structural steel for the headdress, June 5, 2003 Jay Pritzker Pavilion, structural steel for the headdress, June 5, 2003 Hoisting machinery; Cantilever construction; Lawns; Trees; Looking southeast toward the back of the Pavilion where the structural steel for the headdress is being installed. Two large cranes are visible on-site.

34. Jay Pritzker Pavilion, structural steel for the headdress, June 5, 2003 Jay Pritzker Pavilion, structural steel for the headdress, June 5, 2003 Hoisting machinery; Cantilever construction; Trees; Looking southeast toward the back of the Pavilion where the structural steel for the headdress is being installed.

35. Jay Pritzker Pavilion, structural steel for the headdress, June 17, 2003 Jay Pritzker Pavilion, structural steel for the headdress, June 17, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Skyscrapers; Looking southwest toward the back of the structural steel for the Pavilion's headdress. The Michigan Avenue street wall and the top of the Sears Tower are visible in the background.

36. Jay Pritzker Pavilion, structural steel for the headdress, September 25, 2003 Jay Pritzker Pavilion, structural steel for the headdress, September 25, 2003 Skyscrapers; Lampposts; Looking west across the structural steel at the back of the headdress. The Sears Tower is visible in the background.

37. Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Jay Pritzker Pavilion, newly installed steel panels, May 13, 2003 Hoisting machinery; Construction workers; Skyscrapers; Scaffolding; Looking northwest toward the newly installed steel and aluminum panels on the west side of the headdress. Once these steel and aluminum panels were installed onto the yellow back up structure, the final...

38. Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Close-up view of newly installed steel panels from behind, showing the structural steel that holds them in place.

39. Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Jay Pritzker Pavilion, back view of newly installed panels, May 29, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Close-up view of newly installed steel panels from behind, showing the structural steel that holds them in place.

40. Jay Pritzker Pavilion, trellis with speakers, June 30, 2004 Jay Pritzker Pavilion, trellis with speakers, June 30, 2004 Lawns; Skyscrapers; Trees; Hoisting machinery; Cantilever construction; Looking northwest from the back of the Great Lawn toward the stage and headdress of the Jay Pritzker Pavilion. With a little over two weeks left before Millennium Park opened to the public this photograph...
select all : clear all : add to favorites
results 21-40 of 45 item(s)  page 2 of 3 : ( <<  1  2  3  >> ) :: previous : next