Chicago Public Library

   

 Español | Polski | 


 
Search results for Another   
Refine your search
Photographer
Unknown (5)

Neighborhood
Loop (Chicago, Ill.) (5)
Columbus Drive (Chicag... (1)

Subject.TGM
Construction Workers (4)
Scaffolding (3)
Hoisting Machinery (2)
Ladders (2)
Concrete (1)
Show more...

results 1-5 of 5 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, attaching steel plates, April 15, 2004 Cloud Gate, attaching steel plates, April 15, 2004 Steel; Structural frames; Structural systems; Trusses; Construction workers; Ladders; Scaffolding; Wood blocks; A worker climbs a ladder to join another worker atop the partially assembled sculpture.

2. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Elevations; Fountains; Faces; Elevations of the towers showing the front glass tile elevation to scale with another showing how it would look in front of an image.

3. Crown Fountain, installing granite tiles, April 1, 2004 Crown Fountain, installing granite tiles, April 1, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Concrete; Automobiles; Workers prepare to install another granite tile during construction of Crown Fountain.

4. Jay Pritzker Pavilion, stage with glass doors, March 4, 2004 Jay Pritzker Pavilion, stage with glass doors, March 4, 2004 Scaffolding; Hoisting machinery; Construction workers; Ceilings; Ladders; Stages (Platforms); Finishing the stage of the Jay Pritzker Pavilion. Always with an eye to the quality of the sound, architect Frank Gehry designed the stage to enhance the acoustics for the performers without sacrificing...

5. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...
select all : clear all : add to favorites
results 1-5 of 5 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next