Chicago Public Library

   

 Español | Polski | 


 
Search results for Rock   
Refine your search
Photographer
Unknown (306)

Neighborhood
Loop (Chicago, Ill.) (306)
Michigan Avenue (Chica... (12)
Monroe Street (Chicago... (12)
Columbus Drive (Chicag... (1)

Subject.TGM
Trees (211)
Skyscrapers (199)
Lighting (165)
Construction Workers (124)
Testing (119)
Show more...

results 301-306 of 306 item(s)  page 16 of 16 : ( <<  11  12  13  14  15  16  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

301. Crown Fountain, tower view, July 23, 2004 Crown Fountain, tower view, July 23, 2004 Fountains; Reflecting pools; Glass blocks; Grilles; Light fixtures; Looking straight down from the top of one of the towers showing the glass bricks of the tower, the reflecting pool, and the lights surrounding the base of the tower.

302. Crown Fountain, tower view, gargoyle spray, July 23, 2004 Crown Fountain, tower view, gargoyle spray, July 23, 2004 Fountains; Reflecting pools; Glass blocks; Grilles; Light fixtures; Looking straight down from the top of one of the towers as water sprays from the tower's gargoyle nozzle.

303. BP Bridge, installing the micropiles, May 9, 2003 BP Bridge, installing the micropiles, May 9, 2003 Garages; Construction workers; Interior view of the garage below the BP Bridge as the surface was drilled to prepare for the installation of micropiles. The micropiles support the central pier on the median strip of Columbus Drive,...

304. BP Bridge, pile-driving rig, May 9, 2003 BP Bridge, pile-driving rig, May 9, 2003 Garages; Ladders; Pile drivers; Machinery used to drill micropiles into place to support the BP Bridge from the garage below. The micropiles support the central pier on the median strip of Columbus Drive and extend through the garage...

305. BP Bridge, installing the micropiles, June 6, 2003 BP Bridge, installing the micropiles, June 6, 2003 Garages; Construction workers; Construction equipment; Pile drivers; Micropiles are drilled into place to support the BP Bridge. The micropiles support the central pier on the median strip of Columbus Drive and extend through the garage to the bed rock below.

306. BP Bridge, installing the wooden planking, February 13, 2004 BP Bridge, installing the wooden planking, February 13, 2004 Construction workers; Streets; Hammers; Construction equipment; Skyscrapers; The 20-foot wide surface of the BP Bridge is decked with Pau Lope wood, a Brazilian hardwood similar to teak. It is extremely durable and was harvested using sustainable practices. A drawback to using...
select all : clear all : add to favorites
results 301-306 of 306 item(s)  page 16 of 16 : ( <<  11  12  13  14  15  16  >> ) :: previous : next