Chicago Public Library

   

 Español | Polski | 


 
Search results for Each   
Refine your search
Photographer
Unknown (68)

Neighborhood
Loop (Chicago, Ill.) (68)
Monroe Street (Chicago... (5)
Michigan Avenue (Chica... (4)

Subject.TGM
Construction Workers (22)
Steel (16)
Structural Systems (16)
Structural Frames (14)
Industrial Facilities (12)
Show more...

results 1-20 of 68 item(s)  page 1 of 4 : ( <<  1  2  3  4  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Close-up view of newly installed light-emitting diode (LED) screens at Crown Fountain. Each LED pixel, made up of 5 individual LEDs, is capable of displaying a range of 4.4 trillion colors. Small black...

2. Crown Fountain, architectural model, ca. October 4, 2002 Crown Fountain, architectural model, ca. October 4, 2002 Architectural models; Structural systems; Fountains; A model of one of Crown Fountain’s towers, showing the internal structure. Each tower is 50 feet tall, with a rectangular footprint of 23 feet by 16 feet. Inside each tower is a basic structure with...

3. Jay Pritzker Pavilion, glass doors, ca. March 10, 2004 Jay Pritzker Pavilion, glass doors, ca. March 10, 2004 Cantilever construction; Hoisting machinery; Construction workers; Construction equipment; Looking north at the stage doors and headdress of the Jay Pritzker Pavilion. The stage area can be closed off by two massive sliding glass doors between performances or to create an intimate indoor space...

4. Millennium Monument at Wrigley Square, column, ca. March 14, 2002 Millennium Monument at Wrigley Square, column, ca. March 14, 2002 Columns; Scaffolding; Close-up of a column and scaffolding at the Millennium Monument at Wrigley Square. Each column is made up of five 2200 pound segments carved from 300 million year old limestone from the quarries of northwest...

5. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Computer graphics; Structural frames; A detailed plan for a steel grid frame glass brick panel. On the finished fountain, the tower walls consist of steel grids with glass bricks in each opening. This provides the necessary strength without...

6. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Computer graphics; Structural frames; A detailed plan for a steel grid frame glass brick panel. On the finished fountain, the tower walls consist of steel grids with glass bricks in each opening. This provides the necessary strength without...

7. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Computer graphics; Structural frames; A detailed plan for a compression strap frame glass brick panel. This was one of several wall structures that was proposed and ultimately rejected. On the finished fountain, the towers consist of steel...

8. Crown Fountain, tower wall rendering, ca. August 1, 2002 Crown Fountain, tower wall rendering, ca. August 1, 2002 Computer graphics; Structural frames; A detailed plan for a compression strap frame glass brick panel. This was one of several wall structures that was proposed and ultimately rejected. On the finished fountain, the towers consist of steel...

9. BP Bridge, installing the shingles, March 22, 2004 BP Bridge, installing the shingles, March 22, 2004 Construction workers; Ladders; Less than four months before the opening of Millennium Park, workers continue to install the stainless steel shingles, or “scales” onto the paneling over the subframe of the Bridge. Protected by a...

10. BP Bridge, installing the shingles, January 9, 2004 BP Bridge, installing the shingles, January 9, 2004 Construction workers; Snow; Scaffolding; Skyscrapers; Looking northeast toward the BP Bridge as workers continue to install the stainless steel shingles, or scales” onto the Bridge. If you look closely at the ladders the workers are using, you’ll see...

11. Crown Fountain, excavation and construction of reservoir, November 26, 2003 Crown Fountain, excavation and construction of reservoir, November 26, 2003 Excavation; Retaining walls; Close-up view of part of the grounding system of Crown Fountain. The copper cables run from the ground up to the top each of the towers.

12. Crown Fountain, meeting in Chicago, ca. April 10, 2002 Crown Fountain, meeting in Chicago, ca. April 10, 2002 Faces; Architects' offices; Alan Schachtman of U.S. Equities Realty (left) and artist Jaume Plensa view LED test panels at the offices of Krueck + Sexton Architects at 221 West Erie Street in Chicago. U.S. Equities Realty was the...

13. Crown Fountain, video still with notes, July 30, 2003 Crown Fountain, video still with notes, July 30, 2003 Film stills; Pens; Marks (Symbols); A printed out image of a face that will be included in Crown Fountain’s video bank, showing some of the considerations the film makers had to take into account.

The dimensions of Crown Fountain,...

14. Crown Fountain, water feature tests, August 25, 2002 Crown Fountain, water feature tests, August 25, 2002 Fountains; Testing; Hoses; Water tanks;Industrial facilities; Testing the "gargoyle" feature of the fountain at Crystal Fountains headquarters in Concord, Ontario, Canada. The finished fountain is made up of two glass brick towers, facing each other across a reflecting...

15. Crown Fountain, water feature tests, June 12, 2002 Crown Fountain, water feature tests, June 12, 2002 Fountains; Testing; Hoses; Water tanks;Industrial facilities; Testing for the "waterfall" feature of the fountain at Crystal Fountains headquarters in Concord, Ontario, Canada. In the finished fountain, water cascades down all sides of each of the towers.

16. Crown Fountain, glass brick sample, April 30, 2003 Crown Fountain, glass brick sample, April 30, 2003 Glass blocks; A sample of glass brick showing a corner joint. In addition to selecting the clearest glass bricks, the project team worked together to devise how the corner bricks would be constructed, making sure the...

17. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass blocks; Posters; Tables; Paneling; Artist Jaume Plensa (right) views glass brick samples showing different clarity and texture possibilities at the offices of the L.E. Smith Glass Company in Mt. Pleasant, Pennsylvania. Each of the finished...

18. Crown Fountain, Jaume Plensa and Mark Sexton visit the site, April 6, 2004 Crown Fountain, Jaume Plensa and Mark Sexton visit the site, April 6, 2004 Glass blocks; Structural frames; Construction workers; Ladders; Tiles; Trailers; Skyscrapers; Artist Jaume Plensa (left) and architect Mark Sexton view the north tower during Crown Fountain’s construction. The north tower has been fitted with all but the last LED panel which will go behind the...

19. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Pipes (Conduits); A grid of glass bricks is lifted and hoisted into place on the north tower of Crown Fountain. LED panels are already in place on the tower and a gap shows where the “gargoyle” nozzle will be fitted....

20. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass industry; Industrial facilities; Glassworking; Glassworkers; A glass worker at the L.E. Smith Glass Company in Mt. Pleasant, Pennsylvania, the company that made over 22,000 glass bricks for the Crown Fountain. At the height of production L.E. Smith was able to make...
select all : clear all : add to favorites
results 1-20 of 68 item(s)  page 1 of 4 : ( <<  1  2  3  4  >> ) :: previous : next