Chicago Public Library

   

 Español | Polski | 


 
Search results for Center   
Refine your search
Photographer
Unknown (217)

Neighborhood
Loop (Chicago, Ill.) (217)
Columbus Drive (Chicag... (47)
Lake Shore Drive (Chic... (9)
Michigan Avenue (Chica... (6)
Monroe Street (Chicago... (3)
Show more...

Subject.TGM
Skyscrapers (141)
Hoisting Machinery (91)
Scaffolding (83)
Construction Workers (63)
Streets (58)
Show more...

results 61-80 of 217 item(s)  page 4 of 11 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

61. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mountains; Office buildings; Streets; Views; Mock-ups; Aerial view of Barco's Logan, Utah offices. A full scale mock-up of the LED component of Crown Fountain is visible in the center of the image.

62. Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Crown Fountain, excavation and construction of reservoir, ca. September 16, 2003 Excavation; Skyscrapers; Trailers; Retaining walls; Trees; As the reservoir was excavated, the formwork for a concrete retaining wall was added around its sides. The Chicago Cultural Center, formerly the Chicago Public Library, is visible in the background.

63. Crown Fountain, excavation and construction of reservoir, October 10, 2003 Crown Fountain, excavation and construction of reservoir, October 10, 2003 Excavation; Retaining walls; Concrete; Trailers; Construction equipment; Trees; Skyscrapers; Architect Mark Sexton (left) and artist Jaume Plensa (center) tour the construction site. Buildings along East Randolph Street are visible in the background.

64. Crown Fountain, excavation and construction of reservoir, November 26, 2003 Crown Fountain, excavation and construction of reservoir, November 26, 2003 Excavation; Retaining walls; Concrete; Construction equipment; Trees; Trailers; Skyscrapers; Looking north along the east side of the site. The Chicago Cultural Center, formerly the Chicago Public Library, and the buildings along East Randolph Street are visible in the background.

65. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

66. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

67. Crown Fountain, north tower, test of reservoir, March 4, 2004 Crown Fountain, north tower, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; Looking north toward the north tower during a test of the reservoir. The Chicago Cultural Center, formerly the Chicago Public Library, is visible in the background. Other visible buildings include the...

68. Crown Fountain, installation of granite tiles, March 18, 2004 Crown Fountain, installation of granite tiles, March 18, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Skyscrapers; Concrete; Trees; Trailers; Looking north toward granite tiles and exposed pipes at the base of the north tower during the construction of Crown Fountain. Horseshoe shims act as temporary spacers keeping the tiles separated during...

69. Crown Fountain, granite tiles, April 1, 2004 Crown Fountain, granite tiles, April 1, 2004 Tiles; Construction workers; Pails; Skyscrapers; Trees; Trailers; Dollies (Moving equipment); Ladders; Trucks; Crates; Looking north toward newly installed granite tiles and the north tower. Buildings visible in the background include the Chicago Cultural Center, formerly the Chicago Public Library, the Smurfit-Stone Building,...

70. Crown Fountain, granite tiles, April 1, 2004 Crown Fountain, granite tiles, April 1, 2004 Tiles; Construction workers; Pails; Skyscrapers; Trees; Trailers; Ladders; Trucks; Crates; Looking north toward newly installed granite tiles and the north tower. Buildings visible in the background include the Chicago Cultural Center, formerly the Chicago Public Library, the Smurfit-Stone Building,...

71. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 I-beams; Structural systems; Pipes (Conduits); Concrete; Retaining walls; Hoisting machinery; Bolts & nuts; Trees; Skyscrapers; Close-up view of the north tower's structural steel. The Aon Center and the Blue Cross-Blue Shield Tower are visible in the background.

72. Crown Fountain, tower construction, January 6, 2004 Crown Fountain, tower construction, January 6, 2004 Structural systems; Tents; Skyscrapers; Looking north toward the structural steel of the north tower of Crown Fountain. The Aon Center and other buildings along East Randolph Street are visible in the background.

73. Crown Fountain, structural steel, construction of towers, January 16, 2004 Crown Fountain, structural steel, construction of towers, January 16, 2004 Structural systems; Parks; Skating rinks; Trailers; Trees; Skyscrapers; Streets; A view of the McCormick Tribune Plaza and Ice Rink framed by the structural steel of Crown Fountain's north tower. The Chicago Cultural Center, formerly the Chicago Public Library, is visible in the background....

74. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Structural systems; Tents; Skyscrapers; Snow; Looking northeast toward the structural steel and partially installed LED screen of the north tower. The weatherproof tent that partially covered the construction site during the winter months is visible...

75. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Structural systems; Tents; Sawhorses; Snow; Skyscrapers; Trailers; Looking north toward the structural steel and partially installed LED screen of the north tower of Crown Fountain. One Prudential Plaza and the Aon Center are visible in the background.

76. Crown Fountain, view of north tower, ca. February 4, 2004 Crown Fountain, view of north tower, ca. February 4, 2004 Tents; Snow; Trailers; Skyscrapers; The north tower of Crown Fountain has been fitted with all but the last LED panel which will go behind the gargoyle nozzle. A weatherproof tent is visible around the base of the site, allowing work to...

77. Crown Fountain, view from south, April 15, 2004 Crown Fountain, view from south, April 15, 2004 Structural systems; Pipes (Conduits); Skyscrapers; Concrete; Trailers; Looking north toward the structural steel of the south tower of Crown Fountain. The north tower, the Aon Center, and Pritzker Pavilion can be seen in the background.

78. Crown Fountain, construction of north tower, May 20, 2004 Crown Fountain, construction of north tower, May 20, 2004 Structural systems; Hoisting machinery; Faces; Lighting; Trailers; Trees; Skyscrapers; Steel is hoisted from above prior to its installation atop Crown Fountain's north tower. The Chicago Cultural Center, formerly the Chicago Public Library and the Smurfit-Stone Building are visible in the...

79. Crown Fountain, inside one of the towers May 27, 2004 Crown Fountain, inside one of the towers May 27, 2004 Structural systems; Glass blocks; Structural frames; Business people; Paul Wojdyla (left) and Roark Frankel (center) of U.S. Equities Realty, accompanied by a visitor from U.S. Equities Realty's Argentina location, inside one of Crown Fountain's towers.

80. Crown Fountain, construction of south tower, May 27, 2004 Crown Fountain, construction of south tower, May 27, 2004 Structural systems; Hoisting machinery; Construction workers; Business people; Crates; Trees; Skyscrapers; Roark Frankel (left) and Paul Wojdyla (center) of U.S. Equities Realty, accompanied by a visitor from U.S. Equities Realty's Argentina location, look on as steel is hoisted from above prior to its installation...
select all : clear all : add to favorites
results 61-80 of 217 item(s)  page 4 of 11 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next