Chicago Public Library

   

 Español | Polski | 


 
Search results for 780   
Refine your search
Photographer
Unknown (10)

Neighborhood
Loop (Chicago, Ill.) (10)

Subject.TGM
Concrete (5)
Bolts & Nuts (4)
I-beams (4)
Construction Workers (3)
Structural Systems (3)
Show more...

results 1-10 of 10 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 21, 2003 Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 21, 2003 Structural systems; Structural frames; A close-up of one of the two 22-by-25-foot steel rings on either end of the structural steel of the sculpture.

2. Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Structural systems; Trusses; Steel; Industrial facilities; View of the structural steel of the sculpture during the trial assembly in Oakland, California.

3. Cloud Gate, SBC Plaza, March 10, 2004 Cloud Gate, SBC Plaza, March 10, 2004 Concrete; I-beams; Bolts & nuts; Wheelbarrows; Pouring concrete over part of the sculpture's anchoring system.

4. Cloud Gate, SBC Plaza, March 10, 2004 Cloud Gate, SBC Plaza, March 10, 2004 Concrete; I-beams; Bolts & nuts; Wheelbarrows; Construction workers View of newly-poured concrete covering part of the sculpture's anchoring system.

5. Cloud Gate, base plate, March 4, 2004 Cloud Gate, base plate, March 4, 2004 Concrete; I-beams; Bolts & nuts; View of the base plate for the sculpture's anchoring system before it was encased in concrete.

6. Cloud Gate, SBC Plaza, March 10, 2004 Cloud Gate, SBC Plaza, March 10, 2004 Concrete; I-beams; Bolts & nuts; Close-up view of freshly-poured concrete at the base of the sculpture.

7. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Trucks; Skyscrapers; Concrete; Trees; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir, and the water for the reflecting...

8. Crown Fountain, crates of granite tiles, March 11, 2004 Crown Fountain, crates of granite tiles, March 11, 2004 Pedestals; Tiles; Trees; Crates; Dollies (Moving equipment); Crates of black granite tiles and black pedestals are lined up along the temporary fence bordering the construction site. The Art Institute of Chicago is visible in the background.

9. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Structural systems; Tents; Sawhorses; Snow; Skyscrapers; Trailers; Looking north toward the structural steel and partially installed LED screen of the north tower of Crown Fountain. One Prudential Plaza is visible in the background.

10. BP Bridge, newly installed shingles, March 16, 2004 BP Bridge, newly installed shingles, March 16, 2004 Snow; Construction workers; Dirt; View of newly installed stainless steel shingles, or "scales", on a curve of the BP Bridge in the Daley Bicentennial Plaza. Paneling is visible where the shingles are not yet installed.
select all : clear all : add to favorites
results 1-10 of 10 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next