Chicago Public Library

   

 Español | Polski | 


 
Search results for 41.1   
Refine your search
Photographer
Unknown (31)

Neighborhood
Loop (Chicago, Ill.) (31)

Subject.TGM
Lighting (15)
Mock-ups (14)
Industrial Facilities (13)
Glass Blocks (11)
Structural Frames (11)
Show more...

results 1-20 of 31 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, architectural model, May 13, 2002 Crown Fountain, architectural model, May 13, 2002 Architectural models; Offices; An architectural model depicting Crown Fountain at the offices of Krueck + Sexton Architects.

2. Jay Pritzker Pavilion, cantilever and scaffolding, January 9, 2003 Jay Pritzker Pavilion, cantilever and scaffolding, January 9, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Skyscrapers; Construction workers; Looking northwest toward the Pavilion and the partially-built cantilever. Green scaffolding is visible supporting the cantilever. The Smurfit-Stone Building is visible in the background.

3. Jay Pritzker Pavilion, structural steel for the headdress, March 6, 2003 Jay Pritzker Pavilion, structural steel for the headdress, March 6, 2003 Cantilever construction; Scaffolding; Skyscrapers; Hoisting machinery; Snow; Looking northeast toward the construction site. Newly installed structural steel for the Pavilion's headdress is visible at left. A concrete column, which will support the overhead trellis, is visible...

4. Jay Pritzker Pavilion, rebar and formwork, concrete foundation, ca. October 2001 Jay Pritzker Pavilion, rebar and formwork, concrete foundation, ca. October 2001 Construction workers; Automobiles; Concrete; Rebar, or reinforcing bar, and formwork are visible as preparations were made to lay the concrete foundation of the Pavilion.

5. Crown Fountain, LED screen test in pink, south tower, April 1, 2004 Crown Fountain, LED screen test in pink, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Skyscrapers; A project team member views the south tower's newly installed LED screen, as it is lit in pink. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed.

6. BP Bridge, concrete foundation ramp, October 13, 2003 BP Bridge, concrete foundation ramp, October 13, 2003 Construction workers; Scaffolding; Skyscrapers; Hoisting machinery; Cantilever construction; A view of the concrete foundation ramp and the structural steel of the eastern approach span during the construction of BP Bridge. The Jay Pritzker Pavilion and trellis are under construction in the background,...

7. Crown Fountain, fountain preview, gargoyle spray, June 28, 2004 Crown Fountain, fountain preview, gargoyle spray, June 28, 2004 Fountains; Faces; Lighting; Skyscrapers; Children; Testing; Glass blocks; Testing the water of the gargoyle spray during a preview of Crown Fountain.

8. Crown Fountain, fountain preview, July 13, 2004 Crown Fountain, fountain preview, July 13, 2004 Fountains; Lighting; Mouths; Children; Reflecting pools; Reflections; Children play in the fountain as water sprays from the gargoyle nozzle on the south tower.

9. Jay Pritzker Pavilion, structural steel for the headdress, May 29, 2003 Jay Pritzker Pavilion, structural steel for the headdress, May 29, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Construction workers; Looking north toward the Pavilion where the structural steel for the headdress is being installed. Many times during construction there were as many as four or five large cranes on site, plus 18 aerial...

10. Cloud Gate, fabrication, Oakland landscape, December 17, 2002 Cloud Gate, fabrication, Oakland landscape, December 17, 2002 Industrial facilities; Fences; An industrial landscape near Performance Structures Inc. (PSI) in Oakland, California.

11. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Close-up view of a glass brick panel mock-up at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for the tower walls of...

12. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Interior view of a glass brick panel mock-up. The backs of LED screens can be seen to the right. Triangular spacers, visible here in rows behind the glass bricks, were eliminated from the final design....

13. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Close-up view of a glass brick panel mock-up in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

14. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Close-up view of a glass brick panel mock-up in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

15. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Arrows; Close-up view of two glass brick panel mock-ups sitting side by side in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

16. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Arrows; Close-up view of two glass brick panel mock-ups sitting side by side in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

17. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Cameras; Chief Operations Officer Kevin Sandor (center) of Circle Redmont Inc. during a viewing of two glass brick panel mock-ups at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

18. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Driveways; Trees; Lawns; Ladders; View from a distance of a glass brick panel mock-up outside of the Circle Redmont Inc. headquarters in Melbourne, Florida.

19. Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Eyes; Architect Mark Sexton (left) and artist Jaume Plensa view a glass brick panel mock-up, with an LED screen behind, at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

20. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Shelving; A sample glass brick panel in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The glass bricks selected for Crown Fountain had to be thin to retain clarity, making...
select all : clear all : add to favorites
results 1-20 of 31 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next