Chicago Public Library

   

 Español | Polski | 


 
Search results for 2240x1680   
Refine your search
Photographer
Unknown (220)

Neighborhood
Loop (Chicago, Ill.) (220)
Columbus Drive (Chicag... (11)
Michigan Avenue (Chica... (3)

Subject.TGM
Structural Systems (100)
Steel (99)
Industrial Facilities (72)
Mock-ups (51)
Lampposts (48)
Show more...

results 1-20 of 220 item(s)  page 1 of 11 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, airplane, December 17, 2003 Crown Fountain, airplane, December 17, 2003 Airplanes; Hangars; A small airplane flew the project team to Logan, Utah, where they viewed a full scale mock-up of Crown Fountain's LED screens.

2. Crown Fountain, airplane, December 17, 2003 Crown Fountain, airplane, December 17, 2003 Airplanes; Hangars; A small airplane flew the project team to Logan, Utah, where they viewed a full scale mock-up of Crown Fountain's LED screens.

3. Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 22, 2003 Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 22, 2003 Bolts & nuts; Structural systems; I-beams; Close-up view of a bolt connecting one of the large rings of the structural steel of the sculpture to an I-beam formation at its base during the trial assembly at PSI in Oakland, California.

4. Crown Fountain, "U.S. Equities" box, December 17, 2003 Crown Fountain, "U.S. Equities" box, December 17, 2003 Boxes; Offices; Close-up view of a box labeled "U.S. Equities" at Barco's Logan, Utah offices. U.S. Equities Realty was the construction manager for Crown Fountain. Barco manufactured the LED screens for Crown Fountain...

5. Cloud Gate, photograph of a construction drawing by Performance Structures, Inc. (PSI), April 22, 2003 Cloud Gate, photograph of a construction drawing by Performance Structures, Inc. (PSI), April 22, 2003 Computer-aided designs; Engineering drawings; A photograph of a construction drawing by PSI. PSI used CAD (Computer-aided design) software to create construction drawings for the piece.

6. Cloud Gate, trial assembly in Oakland, California, freight container with machinery, April 22, 2003 Cloud Gate, trial assembly in Oakland, California, freight container with machinery, April 22, 2003 Containers; Machinery; Industrial facilities; Interior view of a padded freight container filled with machinery at PSI in Oakland, California.

7. Cloud Gate, trial assembly in Oakland, California, freight container, April 22, 2003 Cloud Gate, trial assembly in Oakland, California, freight container, April 22, 2003 Containers; Shipping; Industrial facilities; Interior view of a padded freight container at PSI in Oakland, California.

8. Cloud Gate, trial assembly in Oakland, California, turnbuckle, September 18, 2003 Cloud Gate, trial assembly in Oakland, California, turnbuckle, September 18, 2003 Fasteners An example of a turnbuckle used in the rigging of the steel plates of the sculpture. A turnbuckle is a link with screw threads at either end; it is used to alter the tension of a cable or rope.

9. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Close-up view of the end of the center box girder for BP Bridge's span.

10. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Construction workers; Streets; Hoisting machinery; Scaffolding; Skyscrapers; Lining up the box girders of BP Bridge's span. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

11. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Streets; Skyscrapers; Fog; Looking north along Columbus Drive as a crane lifts the second box girder into place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

12. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Streets; Trucks; Scaffolding; A crane lifts the second box girder into place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

13. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Streets; Trucks; Scaffolding; Construction workers; Looking south on Columbus Drive as a crane lifts a second box girder into place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up...

14. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Trees; Skyscrapers; A box girder is lined up with the structural steel of the eastern approach span of BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up...

15. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Close-up view showing where a box girder is attached to the structural steel of the eastern approach span of BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three...

16. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Construction workers; Skyscrapers; Fog; Lining up the box girders of BP Bridge's span. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

17. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Streets; Hoisting machinery; Construction workers; A crane lifts the second box girder into place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

18. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Streets; Hoisting machinery; Construction workers; Skyscrapers; Scaffolding; Looking north along Columbus Drive as a crane lifts the second box girder into place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

19. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Streets; Trucks; Hoisting machinery; Scaffolding; Construction workers; Looking south along Columbus Drive as a crane lifts the second box girder into place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

20. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Streets; Trucks; Hoisting machinery; Scaffolding; Construction workers; Looking south along Columbus Drive as a crane lifts a box girder into its place on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up...
select all : clear all : add to favorites
results 1-20 of 220 item(s)  page 1 of 11 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next