Chicago Public Library

   

 Español | Polski | 


 
Search results for 21   
Refine your search
Photographer
Unknown (259)

Neighborhood
Loop (Chicago, Ill.) (259)
Lake Shore Drive (Chic... (18)
Columbus Drive (Chicag... (11)
Monroe Street (Chicago... (11)
Randolph Street (Chica... (10)
Show more...

Subject.TGM
Skyscrapers (97)
Trees (72)
Lighting (68)
Industrial Facilities (59)
Testing (57)
Show more...

results 1-20 of 259 item(s)  page 1 of 13 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 21, 2003 Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 21, 2003 Structural systems; Structural frames; Industrial facilities; A close-up of one of the two 22-by-25-foot steel rings on either end of the structural steel of the sculpture during a trial assembly in Oakland, California.

2. Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 21, 2003 Cloud Gate, trial assembly in Oakland, California, close-up of structural steel, April 21, 2003 Structural systems; Structural frames; A close-up of one of the two 22-by-25-foot steel rings on either end of the structural steel of the sculpture.

3. BP Bridge, concrete of the western approach ramp, October 17, 2003 BP Bridge, concrete of the western approach ramp, October 17, 2003 Structural frames; Trailers; Construction workers; Skyscrapers; A close-up view of the concrete surface of the western approach span prior to the installation of the wooden deck. The trellis of the Jay Pritzker Pavilion and the Michigan Avenue street wall are visible...

4. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Hoisting machinery; Structural systems; Trees; Street lights; A crane hoists structural steel into place on the north tower of Crown Fountain.

5. Jay Pritzker Pavilion, assembling the trellis, April 21, 2003 Jay Pritzker Pavilion, assembling the trellis, April 21, 2003 Scaffolding; Construction workers; Hoisting machinery; Sawhorses; A crane is used to lift pipes as the assembly of the trellis begins.

6. Cloud Gate, trial assembly in Oakland, California, structural steel, ca. April 21, 2003 Cloud Gate, trial assembly in Oakland, California, structural steel, ca. April 21, 2003 Steel; Hoisting machinery; Industrial facilities; Structural systems; A crane lifts one of the structural steel rings of the sculpture off of a pallet in Oakland, California. The structural steel was fabricated by Advanced Building and Metal Fabrication in Chico, California,...

7. BP Bridge, structural steel, October 1, 2003 BP Bridge, structural steel, October 1, 2003 Hoisting machinery; Construction workers; Streets; Skyscrapers; Abutments; A crane lifts structural steel for the eastern approach span into place atop a concrete abutment. Lightweight poly-foam blocks, visible at right, were used to to fill in the landscape surrounding the BP...

8. Millennium Monument at Wrigley Square, dedication, October 30, 2002 Millennium Monument at Wrigley Square, dedication, October 30, 2002 Peristyles; Fountains; Spectators; Dedications; Banners; A crowd of people in front of the Millennium Monument at Wrigley Square during the dedication ceremony.

9. Cloud Gate, fabrication, steel plate, December 17, 2002 Cloud Gate, fabrication, steel plate, December 17, 2002 Steel; Dollies (Moving equipment); Hoisting machinery; A curved steel plate under a tarp at the Performance Structures Inc. (PSI) facility in Oakland, California.

10. Cloud Gate, transportation study, damaged tree, ca. August 21, 2002 Cloud Gate, transportation study, damaged tree, ca. August 21, 2002 Trees; Bark A damaged tree trunk. A plan was in place to photograph everything in the proposed path of the sculpture before the move, to document any damages resulting from the move. This is one of a series of photographs...

11. Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Computer graphics; Structural systems; Tents; Skyscrapers; A digitally-altered photograph of the structural steel and partially installed LED screen of the north tower of Crown Fountain.

12. Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Mock-ups; Office buildings; Structural systems; Fences; Faces; Lighting; Lampposts; Concrete; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

13. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Office buildings; Structural systems; Fences; Concrete; Lighting; Faces; Lampposts; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

14. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass blocks; Glassware; Shelving; Merchandise displays; Paneling; A glass brick in the center of shelves of objects produced by L.E. Smith Glass Company. The project team had precise specifications for the size and color of the glass bricks, and clarity was necessary...

15. Crown Fountain, testing in Melbourne, Florida, ca. January 17, 2003 Crown Fountain, testing in Melbourne, Florida, ca. January 17, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; A glass brick panel mock-up with red lighting in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

16. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass industry; Industrial facilities; Glassworking; Glassworkers; A glass worker at the L.E. Smith Glass Company in Mt. Pleasant, Pennsylvania, the company that made over 22,000 glass bricks for the Crown Fountain. At the height of production L.E. Smith was able to make...

17. Crown Fountain, LED screen test in green and red, south tower, June 21, 2004 Crown Fountain, LED screen test in green and red, south tower, June 21, 2004 Glass blocks; Structural frames; Lighting; Testing; Reflections; A green and red test pattern lights up the south tower at night. The north tower is visible at right.

18. Crown Fountain, LED screen test in green, north tower, June 21, 2004 Crown Fountain, LED screen test in green, north tower, June 21, 2004 Lighting; Testing; Reflections; A green test pattern lights up the north tower at night. In the background, the diamond-shaped roof of the Smurfit-Stone Building is outlined in lights.

19. Jay Pritzker Pavilion, hallway, February 6, 2003 Jay Pritzker Pavilion, hallway, February 6, 2003 Passageways; Boxes; A hallway backstage during construction.

20. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Kilns; Glass industry; Industrial facilities; Ladders; A kiln at the L.E. Smith Glass Company in Mount Pleasant, Pennsylvania. L.E. Smith Glass Company fabricated 22,000 five- by ten- by two-inch glass bricks for the towers of Crown Fountain.
select all : clear all : add to favorites
results 1-20 of 259 item(s)  page 1 of 13 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next