Chicago Public Library

   

 Español | Polski | 


 
Search results for 2004.3.4.1   
Refine your search
Photographer
Unknown (189)

Neighborhood
Loop (Chicago, Ill.) (189)
Columbus Drive (Chicag... (38)
Randolph Street (Chica... (32)
Michigan Avenue (Chica... (4)
Monroe Street (Chicago... (3)
Show more...

Subject.TGM
Skyscrapers (123)
Hoisting Machinery (104)
Scaffolding (94)
Cantilever Constructio... (81)
Trees (50)
Show more...

results 1-20 of 189 item(s)  page 1 of 10 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Millennium Monument at Wrigley Square, scaffolding and columns, ca. March 14, 2002 Millennium Monument at Wrigley Square, scaffolding and columns, ca. March 14, 2002 Columns; Scaffolding; Peristyles; Construction Columns and scaffolding during construction of the Millennium Monument at Wrigley Square. The monument was designed by architects David Dillon and Michael Patrick Sullivan of O'Donnell, Wicklund, Pigozzi...

2. Millennium Monument at Wrigley Square, scaffolding and columns, March 14, 2002 Millennium Monument at Wrigley Square, scaffolding and columns, March 14, 2002 Scaffolding; Columns; Peristyles; Construction; Columns and scaffolding during construction of the Millennium Monument at Wrigley Square. The peristyle is made up of 12 pairs of Doric columns on a semicircular pedestal. Each of the 24 columns has 24...

3. Cloud Gate, transportation study, Buckingham Fountain, ca. August 21, 2002 Cloud Gate, transportation study, Buckingham Fountain, ca. August 21, 2002 Plazas; Fountains; Skyscrapers; Looking west at the concrete pavement near Buckingham Fountain in Chicago. Buildings visible in the background include the Harrison Hotel Electric Garage, the Congress Hotel, the Auditorium Building, the...

4. Cloud Gate, assembly in Chicago, structural steel, March 2, 2004 Cloud Gate, assembly in Chicago, structural steel, March 2, 2004 Hoisting machinery; Structural systems; Trusses; Steel; Skyscrapers; A crane tilts at a precarious angle during the construction of the sculpture's structural steel in Chicago.

5. Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Structural systems; Trusses; Steel; Hoisting machinery; Skyscrapers; Scaffolding; View from the south of the sculpture's structural steel in one-point perspective. The 110-ton sculpture sits atop a load-bearing wall which separates the Park Grill café from an underground parking garage....

6. Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Structural systems; Trusses; Steel; Hoisting machinery; Skyscrapers; Scaffolding; View from the south of the sculpture's structural steel in one-point perspective. The 110-ton sculpture sits atop a load-bearing wall which separates the Park Grill café from an underground parking garage....

7. Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Structural systems; Trusses; Steel; Hoisting machinery; Skyscrapers; Scaffolding; Looking northeast at the structural steel and base of the sculpture. The "headdress" of the Pritzker Pavilion, still under construction, is visible in the background.

8. Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Structural systems; Steel; Trusses; Scaffolding; Skyscrapers; Looking southwest at the structural steel and base of the sculpture.

9. Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Structural systems; Steel; Trusses; Scaffolding; Skyscrapers; Looking southwest at the structural steel and base of the sculpture.

10. Cloud Gate, SBC Plaza, March 4, 2004 Cloud Gate, SBC Plaza, March 4, 2004 Concrete; I-beams; Construction workers; Bolts & nuts; Nails & spikes; Close-up view of an I-beam and rebar below the base of the sculpture.

11. Cloud Gate, SBC Plaza, March 4, 2004 Cloud Gate, SBC Plaza, March 4, 2004 Structural systems; Trusses; Construction workers; Construction equipment; Skyscrapers; Looking northwest toward the partially built sculpture. SBC Plaza is under construction. The Chicago Cultural Center and the Smurfit-Stone Building are visible in the background.

12. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Structural systems; Trusses; Steel; Restaurants; Pickup trucks; Trees; Looking east at the Park Grill restaurant and the partially built sculpture above.

13. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Structural systems; Trusses; Steel; Restaurants; Pickup trucks; Trees; Looking east at the Park Grill restaurant and the partially built sculpture above.

14. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Steel; Reflections; Trusses; View of the omphalos, or navel, from below. The omphalos was the first plate to be attached to the structural steel.

15. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Steel; Trusses; Reflections; View of the omphalos, or navel, from below. The omphalos was the first plate to be attached to the structural steel.

16. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Steel; Trusses; Reflections; View of the omphalos, or navel, from below. The omphalos was the first plate to be attached to the structural steel.

17. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Structural systems; Trusses; Steel; Skyscrapers; Looking southwest at the structural steel of the sculpture with the omphalos in place. The Michigan Avenue street wall is visible in the background.

18. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Structural systems; Trusses; Steel; Looking southeast at the structural steel of the sculpture. The first plate attached was the omphalos of the sculpture.

19. Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Cloud Gate, attaching steel plates, omphalos, March 4, 2004 Logos; Signs (Notices); The logo of MTH Industries, the architectural glass and metal contracting company of Villa Park, Illinois, that assembled and completed the sculpture on site in Chicago.

20. Cloud Gate, attaching steel plates, April 1, 2004 Cloud Gate, attaching steel plates, April 1, 2004 Steel; Structural systems; Trusses; Construction workers; Ladders; Barrels; Dollies (Moving equipment); Skyscrapers; Looking northwest toward the partially completed sculpture.
select all : clear all : add to favorites
results 1-20 of 189 item(s)  page 1 of 10 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next