Chicago Public Library

   

 Español | Polski | 


 
Search results for 2003.11.22.12   
Refine your search
Photographer
Unknown (7)

Neighborhood
Loop (Chicago, Ill.) (7)
Columbus Drive (Chicag... (2)

Subject.TGM
Skyscrapers (3)
Testing (3)
Hoisting Machinery (3)
Lighting (3)
Scaffolding (2)
Show more...

results 1-7 of 7 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, water feature tests, ca. November 5, 2002 Crown Fountain, water feature tests, ca. November 5, 2002 Fountains; Testing; Ladders; Industrial facilities; Water tanks; Hoses; Lighting; Testing the "waterfall" feature of the fountain at Crystal Fountains headquarters in Concord, Ontario, Canada. Water cascades down the sides of the towers of the finished fountain.

2. Crown Fountain, construction of underground control rooms, December 11, 2003 Crown Fountain, construction of underground control rooms, December 11, 2003 Control rooms; Marks (Symbols); Interior view of one of Crown Fountain's underground control rooms during construction.

3. Crown Fountain, Jaume Plensa, video test run, June 22, 2004 Crown Fountain, Jaume Plensa, video test run, June 22, 2004 Lighting; Testing; Faces; Reflections; Artist Jaume Plensa on site during a nighttime video screening. The south tower is visible in the background with an image of a face on its LED screen.

4. Crown Fountain, violet interior lighting, north tower, June 22, 2004 Crown Fountain, violet interior lighting, north tower, June 22, 2004 Lighting; Testing; Structural systems; Looking southwest toward the north tower as it is lit from within with violet lights.

5. BP Bridge, east entrance, November 12, 2003 BP Bridge, east entrance, November 12, 2003 Structural frames; Surveying equipment; Skyscrapers; Hoisting machinery; Cantilever construction; View of the eastern entrance to BP Bridge during construction. Subframing for the stainless steel shingles, or "scales", can be seen along its sides. The Michigan Avenue street wall and buildings along...

6. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Scaffolding; Streets; Construction workers; Skyscrapers; A crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's...

7. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...
select all : clear all : add to favorites
results 1-7 of 7 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next