Chicago Public Library

   

 Español | Polski | 


 
Search results for 2002.3.14.1   
Refine your search
Photographer
Unknown (61)

Neighborhood
Loop (Chicago, Ill.) (61)
Monroe Street (Chicago... (16)
Michigan Avenue (Chica... (15)
Columbus Drive (Chicag... (12)
Randolph Street (Chica... (11)
Show more...

Subject.TGM
Trees (33)
Streets (29)
Skyscrapers (25)
Hoisting Machinery (23)
Scaffolding (23)
Show more...

results 41-60 of 61 item(s)  page 3 of 4 : ( <<  1  2  3  4  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

41. Crown Fountain, LED test in Millennium Park, October 2, 2002 Crown Fountain, LED test in Millennium Park, October 2, 2002 Mock-ups; Glass blocks; Lighting; Scaffolding; Skyscrapers; Hoisting machinery; Construction equipment; Fog; Flags; Eyes; During the second LED test, LED screens and glass brick panels were temporarily erected in Millennium Park at the approximate height of the fountain's towers. Pritzker Pavilion is under construction in...

42. Crown Fountain, LED test in Millennium Park, October 2, 2002 Crown Fountain, LED test in Millennium Park, October 2, 2002 Mock-ups; Glass blocks; Lighting; Scaffolding; Skyscrapers; Fog; Eyes; Construction equipment; Hoisting machinery; Flags; During the second LED test, LED screens and glass brick panels were temporarily erected in Millennium Park at the approximate height of the fountain's towers. Pritzker Pavilion is under construction in...

43. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Structural systems; Tents; Skyscrapers Equipment for pumping concrete on-site during Crown Fountain's construction. The Michigan Avenue street wall is visible in the background.

44. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Chisels & mallets; Trees; Pails; Installation of the pedestals during construction of Crown Fountain's reflecting pool. In the completed fountain, the pedestals hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

45. Jay Pritzker Pavilion, installing steel panels, November 14, 2003 Jay Pritzker Pavilion, installing steel panels, November 14, 2003 Hoisting machinery; Installing the steel "scales" onto the surface of the headdress.

46. Crown Fountain, installation of granite tiles, March 18, 2004 Crown Fountain, installation of granite tiles, March 18, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Skyscrapers; Concrete; Trees; Trailers; Looking north toward granite tiles and exposed pipes at the base of the north tower during the construction of Crown Fountain. Horseshoe shims act as temporary spacers keeping the tiles separated during...

47. Jay Pritzker Pavilion, construction of Great Lawn, March 22, 2004 Jay Pritzker Pavilion, construction of Great Lawn, March 22, 2004 Skyscrapers; Looking northeast across the future site of the Great Lawn, which has been covered with gravel. Newly installed speakers are visible on the overhead trellis, and the Pavilion's stage, glass doors, and...

48. Jay Pritzker Pavilion, installing steel panels, ca. November 14, 2003 Jay Pritzker Pavilion, installing steel panels, ca. November 14, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Looking northwest toward the headdress as its steel panels were being installed.

49. Millennium Monument at Wrigley Square, scaffolding and partially built columns, March 14, 2002 Millennium Monument at Wrigley Square, scaffolding and partially built columns, March 14, 2002 Scaffolding; Columns; Peristyles; Construction; Looking south at partially built columns and scaffolding during construction of the Millennium Monument at Wrigley Square.

50. Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Cloud Gate, assembly in Chicago, structural steel, ca. March 3, 2004 Structural systems; Steel; Trusses; Scaffolding; Skyscrapers; Looking southwest at the structural steel and base of the sculpture.

51. Crown Fountain, structural steel, April 1, 2004 Crown Fountain, structural steel, April 1, 2004 Construction workers; Structural systems; Marks (Symbols); Looking west toward the structural steel and workers inside the south tower of Crown Fountain.

52. Jay Pritzker Pavilion, newly installed panels, June 5, 2003 Jay Pritzker Pavilion, newly installed panels, June 5, 2003 Scaffolding; Cantilever construction; Hoisting machinery; Newly installed steel panels on the underside of the Pavilion's headdress.

53. Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Crown Fountain, assembly in Melbourne, Florida, ca. March 24, 2004 Industrial facilities; Structural frames; Glass blocks; Fans (Machinery); Pails; Shelving; Once the glass bricks were made by L.E. Smith in Mt. Pleasant, Pennsylvania, they were sent to the offices of Circle Redmont, Inc., to be assembled into steel grids, shown here.

In Plensa’s...

54. BP Bridge, wooden planking, November 14, 2003 BP Bridge, wooden planking, November 14, 2003 Structural frames; Cantilever construction; Hoisting machinery; Skyscrapers; Pieces of subframing for the BP Bridge are stacked on the waterproofed concrete foundation ramp, and an area of wooden planking is visible behind. The trellis and headdress of the Jay Pritzker Pavilion,...

55. Jay Pritzker Pavilion, pieces of structural steel for the headdress, April 17, 2003 Jay Pritzker Pavilion, pieces of structural steel for the headdress, April 17, 2003 Hoisting machinery; Scaffolding; Skyscrapers; Pieces of the headdress's structural steel prior to their installation. The Michigan Avenue street wall is visible in the background.

56. Crown Fountain, meeting in Chicago, May 13, 2002 Crown Fountain, meeting in Chicago, May 13, 2002 Alleys; Glass blocks; Lighting; Architects' offices; Faces; Puddles; Reflections; Puddles of water reflect LED test panels in the alley behind the offices of Krueck + Sexton Architects at 221 West Erie Street in Chicago.

57. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Side view of a glass brick panel mock-up showing the space between the glass brick façade and the LED screens behind. The mock-up was created to test a possible steel support structure for the tower walls...

58. Crown Fountain, LED test in Millennium Park, October 3, 2002 Crown Fountain, LED test in Millennium Park, October 3, 2002 Mock-ups; Scaffolding; Lighting; Glass blocks; Hoisting machinery; Skyscrapers; Steve Crown of the Crown Foundation and Jennifer Jacoby Hurd, Executive Director of Arie and Ida Crown Memorial, view the second LED test for Crown Fountain from a lift in Millennium Park. Two Prudential...

59. Jay Pritzker Pavilion, constructing the trellis, September 25, 2003 Jay Pritzker Pavilion, constructing the trellis, September 25, 2003 Hoisting machinery; Scaffolding; View from below of the partially-built trellis, supported in the center by scaffolding.

60. Cloud Gate, transportation study, Lake Shore Drive, ca. August 21, 2002 Cloud Gate, transportation study, Lake Shore Drive, ca. August 21, 2002 Streets; Street lights; Automobiles; Trees; Skyscrapers; View northwest from Lake Shore Drive just south of East Jackson Drive in Chicago. Buildings along east Randolph Street are visible in the background, including Two Prudential Plaza, the Aon Center, and...