Chicago Public Library

   

 Español | Polski | 


 
Search results for 2002.12.17.17   
Refine your search
Photographer
Unknown (174)

Neighborhood
Loop (Chicago, Ill.) (174)
Columbus Drive (Chicag... (3)
Monroe Street (Chicago... (2)
Randolph Street (Chica... (2)

Subject.TGM
Mock-ups (80)
Lighting (76)
Structural Systems (68)
Office Buildings (62)
Lampposts (55)
Show more...

results 161-174 of 174 item(s)  page 9 of 9 : ( <<  1  2  3  4  5  6  7  8  9  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

161. Crown Fountain, fountain preview, gargoyle spray, June 28, 2004 Crown Fountain, fountain preview, gargoyle spray, June 28, 2004 Fountains; Faces; Lighting; Reflecting pools; Reflections; Skyscrapers; Trees; Children; Testing; View of the north tower of Crown Fountain as its gargoyle nozzle sprays water during a preview of the fountain.

162. Crown Fountain, north tower, fountain preview, June 29, 2004 Crown Fountain, north tower, fountain preview, June 29, 2004 Fountains; Lighting; Reflecting pools; Reflections; Skyscrapers; A view of the north tower with water cascading down its sides, as its LED screen is lit up in red, and it is lit from below in white.

163. Crown Fountain, fountain preview, July 13, 2004 Crown Fountain, fountain preview, July 13, 2004 Fountains; Lighting; Children; Children play in the reflecting pool as an image of nature is visible on one of the towers.

164. Crown Fountain, fountain preview, south tower, July 13, 2004 Crown Fountain, fountain preview, south tower, July 13, 2004 Fountains; Faces; Lighting; Reflecting pools; Reflections; Looking toward the south tower. An image of a face is visible on the tower's LED screen.

165. Crown Fountain, aerial view of early construction, ca. October 17, 2003 Crown Fountain, aerial view of early construction, ca. October 17, 2003 Lawns; Trailers; Construction equipment; Retaining walls; Trees; Street lights; Lampposts; Pedestrians; Sidewalks; Streets; Railroads; Aerial view of the construction site. Concrete walls are visible as Crown Fountain's tower foundations and reservoir begin to take shape.

166. Jay Pritzker Pavilion, pieces of structural steel for the headdress, April 17, 2003 Jay Pritzker Pavilion, pieces of structural steel for the headdress, April 17, 2003 Hoisting machinery; Skyscrapers; Pieces of the headdress's structural steel prior to their installation. The Michigan Avenue street wall is visible in the background.

167. Jay Pritzker Pavilion, structural steel for the headdress, June 17, 2003 Jay Pritzker Pavilion, structural steel for the headdress, June 17, 2003 Cantilever construction; Hoisting machinery; Scaffolding; Skyscrapers; Looking southwest toward the back of the structural steel for the Pavilion's headdress. The Michigan Avenue street wall and the top of the Sears Tower are visible in the background.

168. Jay Pritzker Pavilion, constructing the trellis and headdress, ca. October 17, 2003 Jay Pritzker Pavilion, constructing the trellis and headdress, ca. October 17, 2003 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Looking north toward the Jay Pritzker Pavilion as work continues on the headdress, the stage and the trellis. The trellis, which delivers the sound system to the audience on the Great Lawn, is comprised...

169. Jay Pritzker Pavilion, aerial view of the construction site, ca. December 17, 2002 Jay Pritzker Pavilion, aerial view of the construction site, ca. December 17, 2002 Hoisting machinery; Scaffolding; Cantilever construction; Skyscrapers; Parks; Trees; Streets; Construction equipment; Christmas trees; Aerial view of the Jay Pritzker Pavilion under construction. Some of the buildings along East Randolph Street are visible in the background.

170. BP Bridge, concrete foundation ramp, September 12, 2003 BP Bridge, concrete foundation ramp, September 12, 2003 Close-up view of part of the concrete foundation ramp during construction.

171. BP Bridge, newly installed shingles, October 17, 2003 BP Bridge, newly installed shingles, October 17, 2003 Structural frames; Construction workers; Boxes; Skyscrapers; Cantilever construction; View of the newly installed stainless steel shingles, or "scales", and subframing on a curve of the BP Bridge. The headdress and trellis of the Jay Pritzker Pavilion, still under construction, are visible...

172. BP Bridge, subframing, November 12, 2003 BP Bridge, subframing, November 12, 2003 Structural frames; Skyscrapers; Surveying equipment; Hoisting machinery; Slats of subframing on the serpentine curves of the BP Bridge during construction.

173. BP Bridge, aerial view during construction, December 17, 2003 BP Bridge, aerial view during construction, December 17, 2003 Streets; Snow; Automobiles; Trees; Structural frames; Construction equipment; Boxes; Aerial view of the construction of the BP Bridge. The trellis of the Jay Pritzker Pavilion is visible in the lower left corner of the photograph, and Daley Bicentennial Plaza can be seen in the background....

174. Full Park, construction, December 17, 2003 Full Park, construction, December 17, 2003 Streets; Snow; Hoisting machinery; Construction equipment; Aerial view looking south over Millennium Park showing the Jay Pritzker Pavilion and trellis, the BP Bridge, and the Lurie Garden during construction. Daley Bicentennial Plaza is visible in the background....
select all : clear all : add to favorites
results 161-174 of 174 item(s)  page 9 of 9 : ( <<  1  2  3  4  5  6  7  8  9  >> ) :: previous : next