Chicago Public Library

   

 Español | Polski | 


 
Search results for 2002.12.16.1   
Refine your search
Photographer
Unknown (24)

Neighborhood
Loop (Chicago, Ill.) (24)

Subject.TGM
Skyscrapers (8)
Lighting (7)
Trees (5)
Scaffolding (4)
Structural Systems (4)
Show more...

results 1-20 of 24 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Millennium Monument at Wrigley Square, scaffolding and columns, March 14, 2002 Millennium Monument at Wrigley Square, scaffolding and columns, March 14, 2002 Scaffolding; Columns; Peristyles; Construction; Columns and scaffolding during construction of the Millennium Monument at Wrigley Square. The peristyle is made up of 12 pairs of Doric columns on a semicircular pedestal. Each of the 24 columns has 24...

2. Millennium Monument at Wrigley Square, frieze detail, July 22, 2002 Millennium Monument at Wrigley Square, frieze detail, July 22, 2002 Friezes (Entablature components); Construction workers; Scaffolding; Close-up of the frieze on the back of the peristyle.

3. Millennium Monument at Wrigley Square, October 15, 2002 Millennium Monument at Wrigley Square, October 15, 2002 Columns; Entablatures; Peristyles; Towers; Looking up at the columns and entablature of the peristyle from the ramp side. The top of Willoughby Tower on Michigan Avenue is visible in the background.

4. Millennium Monument at Wrigley Square, dedication, October 30, 2002 Millennium Monument at Wrigley Square, dedication, October 30, 2002 Peristyles; Fountains; Dedications; Spectators; A crowd of people watch as water sprays from the fountain during the dedication of the Millennium Monument at Wrigley Square.

5. Cloud Gate, photograph of a computer rendering by Performance Structures, Inc. (PSI), December 16, 2002 Cloud Gate, photograph of a computer rendering by Performance Structures, Inc. (PSI), December 16, 2002 Computer graphics; Public sculpture; A photograph of a computer rendering by PSI showing the internal structure of the sculpture. Ethan Silva of PSI created the digitized computer model of the sculpture, and divided the shape into 168 plates....

6. Cloud Gate, fabrication, December 17, 2002 Cloud Gate, fabrication, December 17, 2002 Industrial facilities; Offices; Machinery; Machine shops Looking through an office window at the fabrication shop at Performance Structures Inc. (PSI).

7. Cloud Gate, fabrication, ca. December 17, 2002 Cloud Gate, fabrication, ca. December 17, 2002 Industrial facilities; Machinery; Steel; Machine shops View from above of workers shaping a curved steel plate in the fabrication shop at Performance Structures Inc. (PSI). After plasma cutting the steel plates, a custom made roller, similar to an English...

8. Cloud Gate, fabrication, heating equipment, December 17, 2002 Cloud Gate, fabrication, heating equipment, December 17, 2002 Machinery; Close-up view of heating equipment at the Oakland, California offices of Performance Structures Inc. (PSI), where the steel plates for the sculpture were fabricated.

9. Cloud Gate, fabrication, December 17, 2002 Cloud Gate, fabrication, December 17, 2002 Steel; Marks (Symbols) Close-up of a steel plate marked with grids and notations at Performance Structures Inc. (PSI).

10. Cloud Gate, assembly complete, July 12, 2004 Cloud Gate, assembly complete, July 12, 2004 Public sculpture; Skyscrapers; Reflections; Construction equipment; Plazas; Looking southwest toward Cloud Gate and SBC Plaza four days before the park was opened to the public. Crown Fountain and the Michigan Avenue street wall are visible in the background. The surface of Cloud...

11. Cloud Gate, assembly complete, view from above, July 16, 2004 Cloud Gate, assembly complete, view from above, July 16, 2004 Plazas; Crowds; Public sculpture; Parks; Trees; Reflections; Skyscrapers; View from above of Cloud Gate during opening weekend. It was estimated that about 300,000 people visited Millennium Park during its opening weekend, July 16-18, 2004. In the years leading up to the Park's...

12. Crown Fountain, architectural model, ca. October 4, 2002 Crown Fountain, architectural model, ca. October 4, 2002 Architectural models; Structural systems; Fountains; A model of one of Crown Fountain’s towers, showing the internal structure. Each tower is 50 feet tall, with a rectangular footprint of 23 feet by 16 feet. Inside each tower is a basic structure with...

13. Crown Fountain, meeting in Chicago, May 13, 2002 Crown Fountain, meeting in Chicago, May 13, 2002 Glass blocks; Lighting; Close-up view of an LED test panel during a meeting in Chicago at the offices of Krueck + Sexton Architects.

14. Crown Fountain, LED test in Millennium Park, October 2, 2002 Crown Fountain, LED test in Millennium Park, October 2, 2002 Mock-ups; Glass blocks; Lighting; Scaffolding; Skyscrapers; Fog; Eyes; Construction equipment; Hoisting machinery; During the second LED test, LED screens and glass brick panels were temporarily erected in Millennium Park at the approximate height of the fountain's towers. Pritzker Pavilion is under construction in...

15. Crown Fountain, LED test in Millennium Park, October 3, 2002 Crown Fountain, LED test in Millennium Park, October 3, 2002 Mock-ups; Scaffolding; Lighting; Glass blocks; Hoisting machinery; Skyscrapers; Steve Crown of the Crown Foundation and Jennifer Jacoby Hurd, Executive Director of Arie and Ida Crown Memorial, view the second LED test for Crown Fountain from a lift in Millennium Park.

16. Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Mock-ups; Office buildings; Structural systems; Fences; Faces; Lighting; Lampposts; Concrete; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

17. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Office buildings; Structural systems; Fences; Concrete; Lighting; Faces; Lampposts; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

18. Crown Fountain, excavation and construction of reservoir, January 6, 2004 Crown Fountain, excavation and construction of reservoir, January 6, 2004 Excavation; Retaining walls; Structural systems; Snow; Tents; Skyscrapers; Trees; A weatherproof tent was erected over part of the site so that work could continue in cold weather. The structural steel of the north tower can be seen in the background.

19. Crown Fountain, excavation and construction of reservoir, January 16, 2004 Crown Fountain, excavation and construction of reservoir, January 16, 2004 Excavation; Retaining walls; Construction workers; Concrete; Shovels; Freshly-poured concrete on-site during construction of Crown Fountain's reservoir.

20. Crown Fountain, gargoyle spray, fountain preview, north tower, June 28, 2004 Crown Fountain, gargoyle spray, fountain preview, north tower, June 28, 2004 Fountains; Faces; Lighting; Reflecting pools; Reflections; Trees; Skyscrapers; Looking toward the north tower of Crown Fountain. Water sprays from the tower's gargoyle nozzle, appearing to emanate from lips on a face on the tower's LED video screen.
select all : clear all : add to favorites
results 1-20 of 24 item(s)  page 1 of 2 : ( <<  1  2  >> ) :: previous : next