Chicago Public Library

   

 Español | Polski | 


 
Search results for 1.35   
Refine your search
Photographer
Unknown (47)

Neighborhood
Loop (Chicago, Ill.) (47)
Michigan Avenue (Chica... (2)
Randolph Street (Chica... (2)
Columbus Drive (Chicag... (1)
Monroe Street (Chicago... (1)

Subject.TGM
Skyscrapers (18)
Industrial Facilities (14)
Lighting (11)
Scaffolding (11)
Construction Workers (10)
Show more...

results 21-40 of 47 item(s)  page 2 of 3 : ( <<  1  2  3  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

21. Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Eyes; A glass brick panel mock-up, with an LED screen behind, at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for the tower...

22. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Tents; A glass brick panel mock-up at the headquarters of Circle Redmont Inc. in Melbourne, Florida, with a space for the nozzle. The mock-up was created to test a possible steel support structure for the tower...

23. Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Mock-ups; Office buildings; Structural systems; Faces; Lighting; Lampposts; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

24. Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, November 16, 2003 Mock-ups; Structural systems; Lighting; Money; Numerals; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

25. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Retaining walls; Construction equipment; Trees; Skyscrapers; Looking south toward the newly-installed LED screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The partially-installed reflecting...

26. Crown Fountain, fountain preview, gargoyle spray, June 28, 2004 Crown Fountain, fountain preview, gargoyle spray, June 28, 2004 Fountains; Faces; Lighting; Reflecting pools; Reflections; Skyscrapers; Trees; Children; Testing; View of the north tower of Crown Fountain as its gargoyle nozzle sprays water during a preview of the fountain.

27. Crown Fountain, gargoyle spray, north tower, fountain preview, June 28, 2004 Crown Fountain, gargoyle spray, north tower, fountain preview, June 28, 2004 Fountains; Faces; Lighting; Looking toward the north tower of Crown Fountain at night. Water sprays from the tower's gargoyle nozzle, appearing to emanate from lips on a face on the tower's LED video screen.

28. Crown Fountain, south tower, fountain preview, June 29, 2004 Crown Fountain, south tower, fountain preview, June 29, 2004 Fountains; Faces; Lighting; Looking toward the south tower. An image of a face is visible on the tower's LED screen.

29. Jay Pritzker Pavilion, formwork and rebar, ca. May 2002 Jay Pritzker Pavilion, formwork and rebar, ca. May 2002 Concrete; Skyscrapers; Construction workers; Trees; Concrete formwork and rebar, or reinforcing bar, are visible as the basic structure begins to take shape. The Michigan Avenue street wall is visible in the background.

30. Jay Pritzker Pavilion, concrete formwork, October 15, 2002 Jay Pritzker Pavilion, concrete formwork, October 15, 2002 Construction workers; Concrete; Skyscrapers; Concrete formwork alongside the eastern edge of the Pavilion.

31. Jay Pritzker Pavilion, partially-built cantilever, January 9, 2003 Jay Pritzker Pavilion, partially-built cantilever, January 9, 2003 Cantilever construction; Columns; Scaffolding; Hoisting machinery; Concrete; Skyscrapers; Automobiles; Looking northeast toward the construction site and the partially-built cantilever. Concrete columns which will support the overhead trellis are visible in the foreground.

32. Jay Pritzker Pavilion, cantilever and scaffolding, April 24, 2003 Jay Pritzker Pavilion, cantilever and scaffolding, April 24, 2003 Cantilever construction; Scaffolding; Skyscrapers; View from below of the cantilever and scaffolding. A platform has been attached to the cantilever.

33. Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Jay Pritzker Pavilion, a piece of structural steel for the headdress, February 6, 2003 Scaffolding; Hoisting machinery; Skyscrapers; A piece of the headdress's structural steel before it was installed.

34. Jay Pritzker Pavilion, pieces of structural steel for the headdress, April 24, 2003 Jay Pritzker Pavilion, pieces of structural steel for the headdress, April 24, 2003 Hoisting machinery; Cantilever construction; Scaffolding; Skyscrapers; Construction workers; Pieces of the headdress's structural steel prior to their installation. The Pavilion is under construction in the background.

35. Jay Pritzker Pavilion, structural steel for the headdress, April 24, 2003 Jay Pritzker Pavilion, structural steel for the headdress, April 24, 2003 Skyscrapers; Lawns; Streets; Close-up view of structural steel for the Pavilion's headdress. The Michigan Avenue street wall is visible in the background.

36. Jay Pritzker Pavilion, newly installed panels, May 29, 2003 Jay Pritzker Pavilion, newly installed panels, May 29, 2003 Scaffolding; Hoisting machinery; Cantilever construction; Newly installed steel panels on the underside of the Pavilion's headdress.

37. Jay Pritzker Pavilion, newly installed panels, May 29, 2003 Jay Pritzker Pavilion, newly installed panels, May 29, 2003 Hoisting machinery; Scaffolding; Skyscrapers; Construction workers; Looking northwest toward the newly installed steel panels on the west side of the headdress. The top of the Smurfit-Stone Building is visible in the background.

38. Jay Pritzker Pavilion, steel panels from above before installation, August 10, 2003 Jay Pritzker Pavilion, steel panels from above before installation, August 10, 2003 Scaffolding; Hoisting machinery; Trailers; Looking down toward the future site of the Great Lawn, where steel panels were lined up before being installed on the Pavilion's headdress.

39. Jay Pritzker Pavilion, construction of Great Lawn, March 22, 2004 Jay Pritzker Pavilion, construction of Great Lawn, March 22, 2004 Sand; Skyscrapers; Construction of the Great Lawn continues as layers of gravel and sand are spread out before being topped with sod. The layers help the Lawn to drain quickly after a heavy rain, for both concert-goers and...

40. Jay Pritzker Pavilion, interior view, January 9, 2003 Jay Pritzker Pavilion, interior view, January 9, 2003 Ladders; Construction equipment; Interior view of the Pavilion during construction.
select all : clear all : add to favorites
results 21-40 of 47 item(s)  page 2 of 3 : ( <<  1  2  3  >> ) :: previous : next