| 1. |  | BP Bridge, spanning Columbus Drive, November 22, 2003 | Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; | On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into... |
| 2. |  | BP Bridge, spanning Columbus Drive, November 22, 2003 | Girders; Construction workers; Hoisting machinery; Streets; Scaffolding; Skyscrapers; Fog; | The final box girder is lowered into place by a crane as Columbus Drive is closed to traffic for a 12-hour period. The structural steel for the Bridge was made by Littell Steel of Pittsburgh, Pennsylvania,... |