Chicago Public Library

   

 Español | Polski | 


 
Search results for Nozzle > Trees   
Refine your search
Photographer
Unknown (56)

Neighborhood
Loop (Chicago, Ill.) (56)
Michigan Avenue (Chica... (10)
Monroe Street (Chicago... (9)

results 1-20 of 56 item(s)  page 1 of 3 : ( <<  1  2  3  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

2. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Trailers; Construction workers; Skyscrapers; Concrete; Trees; Structural systems; Trusses; A test run of Crown Fountain’s reservoir to check for leaks before the smooth, granite tiles were installed. In the completed fountain, the black granite tiles of the reflecting pool are held in place...

3. Crown Fountain, test of reservoir, ca. March 3, 2004 Crown Fountain, test of reservoir, ca. March 3, 2004 Reservoirs; Testing; Construction equipment; Construction workers; Skyscrapers; Concrete; Trees; Reflections; A test-run of the reservoir portion of Crown Fountain before installation of the granite tiles. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

4. Crown Fountain, test of reservoir, March 4, 2004 Crown Fountain, test of reservoir, March 4, 2004 Reservoirs; Testing; Construction equipment; Skyscrapers; Concrete; Trees; Reflections; Trailers; A test-run of the reservoir portion of Crown Fountain before installation of the reflecting pool. In the completed fountain, the black granite tiles of the reflecting pool are held in place 1/4-inch below...

5. Crown Fountain, view of north tower, February 4, 2004 Crown Fountain, view of north tower, February 4, 2004 Structural systems; Skyscrapers; Trees; Lampposts; Hoisting machinery; Looking northeast toward the north tower of Crown Fountain. The Pritzker Pavilion and the Blue Cross-Blue Shield Tower are visible in the background. The north tower has been fitted with all but the last...

6. Crown Fountain, view of north tower, ca. February 11, 2004 Crown Fountain, view of north tower, ca. February 11, 2004 Tents; Skyscrapers; Snow; Trailers; Trees; Looking north toward the north tower of Crown Fountain. The tower has been fitted with all but the last LED panel which will go behind the gargoyle nozzle. Buildings along north Michigan Avenue and East...

7. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Fountains; Hoisting machinery; Skyscrapers; Trees; Looking south toward the south tower of Crown Fountain. The tower has been fitted with all but the last LED panel which will go behind the gargoyle nozzle, and installation of the granite tiles in the...

8. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Tiles; Pipes (Conduits); Concrete; Trees; Skyscrapers; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane. The north tower has been fitted with all but the last LED panel which will go behind...

9. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Pipes (Conduits); Trees; Skyscrapers; Concrete; Workers guide a glass panel into place on Crown Fountain's north tower as it is hoisted from above by a crane. The north tower has been fitted with all but the last LED panel which will go behind the gargoyle...

10. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Tiles; Pipes (Conduits); Concrete; Trees; Skyscrapers; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane. The north tower has been fitted with all but the last LED panel which will go behind...

11. Crown Fountain, installing glass brick panels, April 15, 2004 Crown Fountain, installing glass brick panels, April 15, 2004 Glass blocks; Structural frames; Tiles; Hoisting machinery; Construction workers; Trailers; Skyscrapers; Trees; Looking northwest toward the north tower of Crown Fountain as glass panels were being installed. The north tower has been fitted with all but the last LED panel which will go behind the gargoyle nozzle....

12. Crown Fountain, north tower, April 15, 2004 Crown Fountain, north tower, April 15, 2004 Glass blocks; Structural frames; Hoisting machinery; Tiles; Pedestals; Structural frames; Construction workers; Trailers; Trees; Skyscrapers; Looking north toward the north tower of Crown Fountain during construction. The north tower has been fitted with all but the last LED panel which will go behind the gargoyle nozzle, and the glass brick...

13. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Retaining walls; Automobiles; Pipes (Conduits); Trees; Skyscrapers; The newly installed light-emitting diode (LED) screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The partially-installed reflecting...

14. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Trees; Skyscrapers; Looking south toward the newly-installed LED screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The partially-installed reflecting...

15. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Trees; Skyscrapers; Automobiles; Project team members view a test pattern on the south tower's newly installed LED screen. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The Art Institute of Chicago and the...

16. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Pipes (Conduits); Trees; Skyscrapers; Project team members view a test pattern on the south tower's newly installed LED screen. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The Michigan Avenue street wall is visible...

17. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Retaining walls; Construction equipment; Trees; Skyscrapers; Looking south toward the newly-installed LED screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The partially-installed reflecting...

18. Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Crown Fountain, LED screen test pattern, south tower, April 1, 2004 Construction workers; Lighting; Testing; Automobiles; Trees; Skyscrapers; Looking south toward the newly-installed LED screen on the south tower, lit up in a test pattern. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The Michigan Avenue street wall...

19. Crown Fountain, LED screen test in blue, south tower, April 1, 2004 Crown Fountain, LED screen test in blue, south tower, April 1, 2004 Lighting; Construction workers; Testing; Automobiles; Construction equipment; Skyscrapers; Trees; Looking south toward the south tower as its newly installed LED screen is lit up in blue. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed. The Michigan Avenue street wall is visible...

20. Crown Fountain, LED screen test in yellow, south tower, April 1, 2004 Crown Fountain, LED screen test in yellow, south tower, April 1, 2004 Sidewalks; Trees; Lawns; Fences; Structural systems; Lighting; Testing; Pedestrians; Looking southeast from Michigan Avenue and Madison Street toward the south tower as its newly installed LED screen is lit up in yellow. The last LED tile, behind the "gargoyle" nozzle, has yet to be installed....
select all : clear all : add to favorites
results 1-20 of 56 item(s)  page 1 of 3 : ( <<  1  2  3  >> ) :: previous : next