Chicago Public Library

   

 Español | Polski | 


 
Search results for Block > Loop (Chicago, Ill.)   
Refine your search
Photographer
Unknown (63)

Subject.TGM
Construction Workers (31)
Pipes (Conduits) (30)
Tiles (24)
Pedestals (23)
Parking Garages (23)
Show more...

results 1-20 of 63 item(s)  page 1 of 4 : ( <<  1  2  3  4  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Millennium Monument at Wrigley Square, looking north, July 22, 2002 Millennium Monument at Wrigley Square, looking north, July 22, 2002 Friezes (Entablature components); Cornices; Scaffolding; Walkways; Close-up of the frieze and cornice of the Millennium Monument at Wrigley Square. The vertical block designs on the frieze are known as triglyphs, and are a feature of the Doric order in classical architecture....

2. Millennium Monument at Wrigley Square, limestone block, July 22, 2002 Millennium Monument at Wrigley Square, limestone block, July 22, 2002 Entablatures; Peristyles; An individual limestone block prior to its attachment to the peristyle. This block will become part of the entablature of the peristyle, and shows egg-and-dart moulding and dentils.

3. Millennium Monument at Wrigley Square, limestone block, July 22, 2002 Millennium Monument at Wrigley Square, limestone block, July 22, 2002 Peristyles; An individual limestone block prior to its attachment to the peristyle.

4. Crown Fountain, tower wall mock-up, ca. July 18, 2002 Crown Fountain, tower wall mock-up, ca. July 18, 2002 Wood blocks; Close-up view showing a beveled edge on a wooden block. Wooden blocks representing glass bricks were used in early mock-ups to test possible structures for the walls of the fountain's towers. This tongue...

5. Crown Fountain, water feature tests, September 9, 2003 Crown Fountain, water feature tests, September 9, 2003 Tiles; Testing; Industrial facilities; Vices (Equipment); The load-bearing capacity of the reflecting pool's black granite tiles are tested using specialized equipment.

6. Crown Fountain, water feature tests, September 9, 2003 Crown Fountain, water feature tests, September 9, 2003 Tiles; Testing; Industrial facilities; Vices (Equipment); The load-bearing capacity of the reflecting pool's black granite tiles are tested using specialized equipment.

7. Crown Fountain, water feature tests, September 9, 2003 Crown Fountain, water feature tests, September 9, 2003 Tiles; Testing; Industrial facilities; Vices (Equipment); Signs (Notices); The load-bearing capacity of the reflecting pool's black granite tiles are tested using specialized equipment.

8. Crown Fountain, water feature tests, September 9, 2003 Crown Fountain, water feature tests, September 9, 2003 Tiles; Testing; Industrial facilities; Vices (Equipment); Signs (Notices); The load-bearing capacity of the reflecting pool's black granite tiles are tested using specialized equipment.

9. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Chisels & mallets; Trees; Pails; Installation of the pedestals during construction of Crown Fountain's reflecting pool. In the completed fountain, the pedestals hold the black granite tiles in place 1/4-inch below the surface of a reservoir...

10. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Structural systems; Surveying equipment; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

11. Crown Fountain, installation of pedestals, March 11, 2004 Crown Fountain, installation of pedestals, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Trees; Pails; Skyscrapers; Trucks; Installation of the pedestals during construction of Crown Fountain's reflecting pool. The Michigan Avenue street wall is visible in the background.

12. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Pails; Chisels & mallets; Installation of the pedestals during construction of Crown Fountain's reflecting pool. Getting the black granite tiles level was essential because of the minute 1/4-inch depth of the reflecting pool. The...

13. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Pails; Chisels & mallets; Construction workers; Trucks; Trees; Close-up view of a granite tile atop four pedestals during the construction of Crown Fountain's reflecting pool.

14. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Pails; Chisels & mallets; Close-up view of a granite tile atop four pedestals during the construction of Crown Fountain's reflecting pool.

15. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Pipes (Conduits); Construction workers; Skyscrapers; Concrete; Trees; Trailers; Piping and pedestals in the fountain's reservoir. In the finished fountain, the 20-inch deep reservoir supplies water for the reflecting pool and the fountain.

16. Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Crown Fountain, installation of pedestals and granite tiles, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; A worker begins to build the surface of the reflecting pool. The surface is made of tiles of black, African granite that are 3 feet square and weigh around 250 pounds each. They sit almost 2 feet above...

17. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir. Getting the black granite tiles...

18. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Pipes (Conduits); Tiles; Construction workers; Pails; Chisels & mallets; Skyscrapers; Concrete; Trees; Trucks; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches off the ground, creating a space for a reservoir of water just...

19. Crown Fountain, installing a granite tile, March 11, 2004 Crown Fountain, installing a granite tile, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Chisels & mallets; Trucks; Skyscrapers; Concrete; Trees; Installing the second granite tile. Granite tiles line the bottom of Crown Fountain's reflecting pool. Pedestals hold the tiles 20-inches above the floor of the reservoir, and the water for the reflecting...

20. Crown Fountain, installation of granite tiles and pedestals, March 11, 2004 Crown Fountain, installation of granite tiles and pedestals, March 11, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Trucks; Skyscrapers; Concrete; Trees; Installation of granite tiles and pedestals with a view of the south tower. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background.
select all : clear all : add to favorites
results 1-20 of 63 item(s)  page 1 of 4 : ( <<  1  2  3  4  >> ) :: previous : next