Chicago Public Library

   

 Español | Polski | 


 
Search results for 816 > Unknown   
Refine your search
Neighborhood
Loop (Chicago, Ill.) (7)

Subject.TGM
Steel (3)
Industrial Facilities (3)
Trusses (2)
Structural Systems (2)
Cantilever Constructio... (1)
Show more...

results 1-7 of 7 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, fabrication, April 22, 2003 Cloud Gate, fabrication, April 22, 2003 Steel; Structural frames; Machine shops; Industrial facilities; An untrimmed steel plate in the process of being attached to its sub-frame grid.

2. Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Steel; Trusses; Structural systems; Industrial facilities; Close-up the sculpture's structural steel with a view of industrial buildings in the background.

3. Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Structural systems; Trusses; Steel; Industrial facilities; View of the structural steel of the sculpture during the trial assembly in Oakland, California.

4. Crown Fountain, underground control room, March 4, 2004 Crown Fountain, underground control room, March 4, 2004 Control rooms; Pipes (Conduits); Pumps; Ladders; Barrels; Interior view of one of Crown Fountain's underground control rooms during construction.

5. Crown Fountain, video test run, June 22, 2004 Crown Fountain, video test run, June 22, 2004 Lighting; Testing; Faces; Reflections; Looking toward the south tower during a nighttime video screening. An image of a face is visible on the tower's LED screen.

6. Crown Fountain, reflecting pool, opening day, July 16, 2004 Crown Fountain, reflecting pool, opening day, July 16, 2004 Reflecting pools; Crowds; View from above of Crown Fountain's crowded reflecting pool on the opening day of Millennium Park.

7. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Cantilever construction; Skyscrapers; Construction workers; The base of a crane at left and a newly installed box girder at right frame a view of the headdress of the Jay Pritzker Pavilion, still under construction. The top of the Smurfit-Stone Building is visible...
select all : clear all : add to favorites
results 1-7 of 7 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next