Chicago Public Library

   

 Español | Polski | 


 
Search results for 807 > Unknown   
Refine your search
Neighborhood
Loop (Chicago, Ill.) (8)

Subject.TGM
Steel (4)
Industrial Facilities (4)
Structural Systems (2)
Tents (2)
Reflections (2)
Show more...

results 1-8 of 8 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Cloud Gate, fabrication, rolling, April 22, 2003 Cloud Gate, fabrication, rolling, April 22, 2003 Steel; Machinery; Machine shops; Industrial facilities; A worker positioning a flat steel plate into a roller. A custom made roller, similar to an English roller, was built by PSI to roll the steel plates into their curved shapes. The plates are shaped by moving...

2. Cloud Gate, fabrication, September 18, 2003 Cloud Gate, fabrication, September 18, 2003 Steel; Reflections; Industrial facilities; Close-up of a semi-polished steel surface.

3. Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Cloud Gate, trial assembly in Oakland, California, September 18, 2003 Steel; Reflections; Industrial facilities; Close-up of the polished steel surface of the sculpture during the trial assembly in Oakland, California.

4. Cloud Gate, base plate, March 10, 2004 Cloud Gate, base plate, March 10, 2004 Concrete; I-beams; Bolts & nuts; View of the base plate for the sculpture's anchoring system before it was encased in concrete.

5. Cloud Gate, attaching steel plates, Anish Kapoor's visit, May 10, 2004 Cloud Gate, attaching steel plates, Anish Kapoor's visit, May 10, 2004 Steel; Plywood; Tents; Ladders; Dollies (Moving equipment); Artist Anish Kapoor inspects the partially completed sculpture. Kapoor took a hands-off approach to the physical assembly of the sculpture, visiting the site only five times during construction.

6. Crown Fountain, water feature tests, January 12, 2002 Crown Fountain, water feature tests, January 12, 2002 Fountains; Testing; Hoses; Water tanks;Industrial facilities; The first round of fountain testing at the Crystal Fountains headquarters in Concord, Ontario, Canada.

7. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Structural systems; Tents; Skyscrapers; Hoisting machinery; Looking northeast toward the structural steel and partially installed LED screen of the north tower. The weatherproof tent that partially covered the construction site during the winter months is visible...

8. Crown Fountain, LED installation, construction of towers, February 2, 2004 Crown Fountain, LED installation, construction of towers, February 2, 2004 Structural systems; Construction workers; Trees; Side view of the structural steel and partially installed LED screen of the north tower of Crown Fountain.
select all : clear all : add to favorites
results 1-8 of 8 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next