Chicago Public Library

   

 Español | Polski | 


 
Search results for 22 > Unknown   
Refine your search
Neighborhood
Loop (Chicago, Ill.) (561)
Columbus Drive (Chicag... (94)
Randolph Street (Chica... (8)
Monroe Street (Chicago... (6)
Michigan Avenue (Chica... (4)
Show more...

Subject.TGM
Skyscrapers (209)
Construction Workers (168)
Hoisting Machinery (142)
Scaffolding (135)
Girders (113)
Show more...

results 141-160 of 561 item(s)  page 8 of 29 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

141. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass industry; Offices; Office workers; Desks; Chairs; Clocks & watches; Interior of an office at L.E. Smith Glass Company, a pressed-glass fabricating company that specializes in decorative objects, fabricated 22,000 five- by ten- by two-inch glass bricks for the towers of...

142. Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Crown Fountain, testing in Melbourne, Florida, January 17, 2003 Industrial facilities; Girders; Tents; Automobiles; Barrels; Steel beams on an outdoor lot at the headquarters of Circle Redmont Inc. in Melbourne, Florida. Circle Redmont engineered and fabricated a hidden support structure for the glass brick walls of Crown Fountain....

143. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Close-up view of a glass brick panel mock-up in front of an LED screen at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

144. Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Crown Fountain, testing in Melbourne, Florida, March 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Steve Simard of Barco sets up an LED display at the headquarters of Circle Redmont Inc. in Melbourne, Florida.

145. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Trees; Tents; Lawns; View from a distance of a glass brick panel mock-up outside the Circle Redmont Inc. headquarters in Melbourne, Florida.

146. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Close-up view of a glass brick panel mock-up showing the nozzle at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for...

147. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Close-up view of a glass brick panel mock-up at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for the tower walls of...

148. Crown Fountain, a computer at Barco's Logan, Utah offices, November 16, 2003 Crown Fountain, a computer at Barco's Logan, Utah offices, November 16, 2003 Offices; Computers; Desks; Coats; A computer with components of an LED video system during a full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain...

149. Crown Fountain, full scale LED mock-up in Logan, Utah, ca. December 10, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, ca. December 10, 2003 Mock-ups; Office buildings; Structural systems; Hoisting machinery; Lighting; Lampposts; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

150. Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Crown Fountain, full scale LED mock-up in Logan, Utah, December 17, 2003 Mock-ups; Office buildings; Structural systems; Fences; Concrete; Lighting; Faces; Lampposts; A full scale mock-up of the LED component of Crown Fountain at Barco's Logan, Utah offices. Barco manufactured the LED screens for Crown Fountain and supplied the software to operate the system.

151. Crown Fountain, excavation and construction of reservoir, October 10, 2003 Crown Fountain, excavation and construction of reservoir, October 10, 2003 Excavation; Tiles; Close-up view of black granite tiles at the construction site.

152. Crown Fountain, installing granite tiles, April 1, 2004 Crown Fountain, installing granite tiles, April 1, 2004 Pedestals; Tiles; Pipes (Conduits); Construction workers; Pails; Skyscrapers; Trees; Dollies (Moving equipment); Automobiles; Looking south toward the partially completed reflecting pool and south tower as a worker takes measurements. The Art Institute of Chicago and the Michigan Avenue street wall are visible in the background....

153. Crown Fountain, structural steel, construction of towers, November 26, 2003 Crown Fountain, structural steel, construction of towers, November 26, 2003 Construction workers; Structural systems; Hoisting machinery; Skyscrapers; A worker atop a lift makes adjustments as a crane hoists structural steel into place on the north tower of Crown Fountain.

154. Crown Fountain, structural steel, construction of towers, January 16, 2004 Crown Fountain, structural steel, construction of towers, January 16, 2004 Structural systems; Close-up view inside the structural steel of Crown Fountain's north tower.

155. Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Crown Fountain, LED installation, construction of towers, ca. February 2, 2004 Computer graphics; Structural systems; Trees; A digitally-altered photograph of the structural steel and partially installed LED screen of the north tower of Crown Fountain.

156. Crown Fountain, view of north tower, February 4, 2004 Crown Fountain, view of north tower, February 4, 2004 Tents; Skyscrapers; Trailers; The north tower of Crown Fountain has been fitted with all but the last LED panel which will go behind the gargoyle nozzle. A weatherproof tent is visible around the base of the site, allowing work to...

157. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Trees; Crates; A worker guides a glass panel into place on the north tower of Crown Fountain as it is hoisted from above by a crane.

158. Crown Fountain, construction of north tower, May 20, 2004 Crown Fountain, construction of north tower, May 20, 2004 Structural systems; Hoisting machinery; Construction workers; Faces; Lighting; Glass blocks; Structural frames; Skyscrapers; Tents; Trees; Trailers; Crates; A worker guides a piece of steel into place atop the north tower as it is hoisted from above by a crane. Buildings visible in the background include the Carbide and Carbon Building, One Prudential Plaza...

159. Crown Fountain, construction of south tower, May 27, 2004 Crown Fountain, construction of south tower, May 27, 2004 Structural systems; Hoisting machinery; Construction workers; Glass blocks; Structural frames; Trees; Pails; A piece of steel is hoisted from above prior to its installation atop Crown Fountain's south tower. The Michigan Avenue street wall is visible in the background.

160. Crown Fountain, construction of south tower, May 27, 2004 Crown Fountain, construction of south tower, May 27, 2004 Structural systems; Glass blocks; Structural frames; Construction workers; Hoisting machinery; Close-up view of a piece of steel as it is hoisted from above prior to its installation atop the south tower.
select all : clear all : add to favorites
results 141-160 of 561 item(s)  page 8 of 29 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next