Chicago Public Library

   

 Español | Polski | 


 
Search results for 2002.7.22.7 > Loop (Chicago, Ill.) > Construction Workers   
Refine your search
Photographer
Unknown (109)

results 1-20 of 109 item(s)  page 1 of 6 : ( <<  1  2  3  4  5  6  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Millennium Monument at Wrigley Square, cornice, July 22, 2002 Millennium Monument at Wrigley Square, cornice, July 22, 2002 Cornices; Walkways; Scaffolding; Construction; Construction workers; The underside of the cornice of the Millennium Monument at Wrigley Square under construction, showing the scaffolding and walkway used by the workers.

2. Millennium Monument at Wrigley Square, cornice, July 22, 2002 Millennium Monument at Wrigley Square, cornice, July 22, 2002 Cornices; Scaffolding; Construction; Construction workers; Close-up of the underside of the cornice of the Millennium Monument at Wrigley Square looking northwest.

3. Millennium Monument at Wrigley Square, entablature, July 22, 2002 Millennium Monument at Wrigley Square, entablature, July 22, 2002 Entablatures; Scaffolding; Construction workers; Construction; Workers attaching pieces of limestone entablature to the Millennium Monument at Wrigley Square. The Chicago Cultural Center, formerly the Chicago Public Library, is visible in the background.

4. Millennium Monument at Wrigley Square, entablature under construction, July 22, 2002 Millennium Monument at Wrigley Square, entablature under construction, July 22, 2002 Friezes (Entablature components); Construction workers; Construction; Construction equipment; Pails; The top of the frieze of Millennium Monument at Wrigley Square during construction, showing some of the support structure beneath the limestone.

5. Millennium Monument at Wrigley Square, looking south, July 22, 2002 Millennium Monument at Wrigley Square, looking south, July 22, 2002 Construction; Construction equipment; Hoisting machinery; Construction workers; Taken from above, this view to the south shows the limestone slabs before they are attached to the peristyle, and the base of the crane used to lift them.

6. Millennium Monument at Wrigley Square, workers atop the construction site, July 22, 2002 Millennium Monument at Wrigley Square, workers atop the construction site, July 22, 2002 Construction workers; Cornices; Construction equipment; Scaffolding; Workers installing the cornice atop the construction site at the Millennium Monument at Wrigley Square.

7. Millennium Monument at Wrigley Square, frieze detail, July 22, 2002 Millennium Monument at Wrigley Square, frieze detail, July 22, 2002 Friezes (Entablature components); Construction workers; Scaffolding; Close-up of the frieze on the back of the peristyle.

8. Millennium Monument at Wrigley Square, workers attaching the cornice atop the frieze, July 22, 2002 Millennium Monument at Wrigley Square, workers attaching the cornice atop the frieze, July 22, 2002 Construction workers; Cornices; Friezes (Entablature components); Scaffolding; Workers guiding a limestone slab into place at the back of the peristyle.

9. Millennium Monument at Wrigley Square, peristyle and scaffolding, July 22, 2002 Millennium Monument at Wrigley Square, peristyle and scaffolding, July 22, 2002 Scaffolding; Peristyles; Columns; Construction workers; Construction; Looking northwest at the peristyle and scaffolding during the construction of Millennium Monument at Wrigley Square.

10. Millennium Monument at Wrigley Square, peristyle and scaffolding, July 22, 2002 Millennium Monument at Wrigley Square, peristyle and scaffolding, July 22, 2002 Scaffolding; Peristyles; Columns; Construction workers; Construction; Looking northwest at the peristyle and scaffolding during the construction of Millennium Monument at Wrigley Square.

11. Cloud Gate, SBC Plaza, March 22, 2004 Cloud Gate, SBC Plaza, March 22, 2004 Concrete; Structural systems; Trusses; Construction workers; Grinding machines; Hoisting machinery; Skyscrapers; Stairways; Steel; Construction equipment; A worker grinds the concrete surface of SBC Plaza, along the steps. Pritzker Pavilion is visible in the background.

12. Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Jay Pritzker Pavilion, structural steel for the headdress, ca. July 1, 2003 Cantilever construction; Scaffolding; Hoisting machinery; Skyscrapers; Construction workers; Looking north toward the Pavilion, where structural steel for the headdress is visible. The first steel plates have been attached to the west wings and the underside of the headdress.

13. BP Bridge, landscaping materials, September 12, 2003 BP Bridge, landscaping materials, September 12, 2003 Construction workers; Construction equipment; Gravel and lightweight poly-foam were used to fill in the landscape surrounding the BP Bridge.

14. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Scaffolding; Girders; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

15. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Welding; Girders; A worker welding one of the box girders before it was installed on BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span....

16. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Scaffolding; Streets; Construction workers; Skyscrapers; A crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's...

17. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Construction workers; Scaffolding; A crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's...

18. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...

19. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Girders; Hoisting machinery; View from below as a crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

20. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Construction workers; Girders; The central box girder is lowered into place on top of a central concrete pier in the median strip of Columbus Drive during a 12-hour period when the busy six-lane road was closed to traffic.
The...
select all : clear all : add to favorites
results 1-20 of 109 item(s)  page 1 of 6 : ( <<  1  2  3  4  5  6  >> ) :: previous : next