Chicago Public Library

   

 Español | Polski | 


 
Search results for 2002.7.22.11 > Hoisting Machinery   
Refine your search
Photographer
Unknown (84)

Neighborhood
Loop (Chicago, Ill.) (84)
Columbus Drive (Chicag... (44)
Randolph Street (Chica... (2)

results 1-20 of 84 item(s)  page 1 of 5 : ( <<  1  2  3  4  5  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

1. Jay Pritzker Pavilion, aerial view of the construction site, ca. July 22, 2003 Jay Pritzker Pavilion, aerial view of the construction site, ca. July 22, 2003 Hoisting machinery; Cantilever construction; Skyscrapers; Parks; Trees; Streets; Construction equipment; Aerial view of the Jay Pritzker Pavilion under construction. Some of the buildings along East Randolph Street are visible in the background.

2. Jay Pritzker Pavilion, aerial view of the construction site, ca. July 22, 2003 Jay Pritzker Pavilion, aerial view of the construction site, ca. July 22, 2003 Hoisting machinery; Cantilever construction; Skyscrapers; Parks; Trees; Streets; Construction equipment; Aerial view of the Jay Pritzker Pavilion under construction. Some of the buildings along East Randolph Street are visible in the background.

3. BP Bridge, east entrance, November 12, 2003 BP Bridge, east entrance, November 12, 2003 Structural frames; Surveying equipment; Skyscrapers; Hoisting machinery; Cantilever construction; View of the eastern entrance to BP Bridge during construction. Subframing for the stainless steel shingles, or "scales", can be seen along its sides. The Michigan Avenue street wall and buildings along...

4. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Streets; A crane lifts a box girder into place onto BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

5. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; A crane lifts a box girder into place onto BP Bridge. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's span.

6. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Scaffolding; Streets; Construction workers; Skyscrapers; A crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's...

7. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Construction workers; Scaffolding; A crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making up BP Bridge's...

8. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Girders; Scaffolding; Construction workers; Streets; Skyscrapers; On November 22, 2003, Columbus Drive was shut down to traffic in both directions for 12 hours to allow the Bridge’s spans over Columbus Drive to be put into place. Three box girders were hoisted into...

9. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Construction workers; Girders; Hoisting machinery; View from below as a crane lifts a box girder onto the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

10. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Hoisting machinery; Construction workers; Girders; The central box girder is lowered into place on top of a central concrete pier in the median strip of Columbus Drive during a 12-hour period when the busy six-lane road was closed to traffic.
The...

11. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Streets; Hoisting machinery; Construction workers; Skyscrapers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

12. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Hoisting machinery; Construction workers; Streets; Skyscrapers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

13. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Hoisting machinery; Skyscrapers; Construction workers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

14. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Hoisting machinery; Construction workers; Streets; Skyscrapers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

15. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Streets; Hoisting machinery; Construction workers; Skyscrapers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

16. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Streets; Hoisting machinery; Construction workers; Skyscrapers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

17. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Ladders; Hoisting machinery; Construction workers; Skyscrapers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

18. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Construction workers; Scaffolding; Ladders; Hoisting machinery; Close-up view of one end of a box girder as it was being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed...

19. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Hoisting machinery; Streets; Scaffolding; Construction workers; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...

20. BP Bridge, spanning Columbus Drive, November 22, 2003 BP Bridge, spanning Columbus Drive, November 22, 2003 Girders; Scaffolding; Hoisting machinery; Construction workers; Trailers; Streets; View of the central box girder being installed atop the concrete pier in the center of Columbus Drive. Columbus Drive was closed to traffic for a 12-hour period as workers installed three box girders making...
select all : clear all : add to favorites
results 1-20 of 84 item(s)  page 1 of 5 : ( <<  1  2  3  4  5  >> ) :: previous : next