|
| Title | BP Bridge, aerial view during construction, ca. December 3, 2003 |
| Description | An aerial view of the BP Bridge under construction. Taken in December 2003, seven months before Millennium Park opened, the span across Columbus Drive is in place and the substructure for the stainless steel shingles is visible. Some of the shingles have been installed, and a tiny part of the deck has been fitted. The trellis of the Jay Pritzker Pavilion is visible in the foreground and Daley Bicentennial Plaza can be seen in the background. |
| Neighborhood | Loop (Chicago, Ill.) Columbus Drive (Chicago, Ill.)
|
| Subject.TGM | Streets Tennis courts Automobiles Construction equipment Structural frames Boxes
|
| Subject.LCSH | BP Bridge (Chicago, Ill.) -- Design and construction Jay Pritzker Pavilion (Chicago, Ill.) -- Design and construction Daley Bicentennial Plaza (Chicago, Ill.)
|
| Subject.AAT | pylons
|
| Photographer | Unknown
|
| Artists | Gehry, Frank O., 1929-
|
| Contributors | Courtesy of U.S. Equities Realty and the men and women who built Millennium Park
|
| Date Of Download | ca. 12/3/2003 |
| Time Period | 2000; 2001; 2002; 2003; 2004; 2005; 2006; 2007; 2008; 2009 |
| Repository Number | SPE-MP USER BP Bridge 2003.12.3.1 |
| Repository Name | Chicago Public Library Special Collections and Preservation Division
|
| Collection | Millennium Park, U.S. Equities Realty Collection
|
| Rights | http://www.chipublib.org/aboutcpl/cplpolicies/policies/photo_reproduct.php |
| Language | eng |
| Type | Image
|
| Original Format | jpeg
|
| Genre | Aerial views Progress photographs
|
| Original Size | 669 KB |
| Original Resolution (dpi) | 300 |
| Original Dimension (Pixels) | 1773x1330 |
| Book | BP Bridge
|
| Chapter | Chapter 7: Aerial views of the Bridge during construction
|
| Highlight | highlight
|